Snailplus 2013: Report Output: A Program For The Evaluation of Deep Excavations Deep Excavation LLC
Snailplus 2013: Report Output: A Program For The Evaluation of Deep Excavations Deep Excavation LLC
Snailplus 2013: Report Output: A Program For The Evaluation of Deep Excavations Deep Excavation LLC
Project: My Project
Company: My Company
Prepared by engineer: Engineer
File number: 1
Time: 3/13/2020 10:08:59 AM
THIS PROGRAM IS PROTECTED BY U.S. COPYRIGHT LAWS AS DESCRIBED IN THE EULA. UNAUTHORIZED
COPYING IS PROHIBITED. LICENSED TO: Deep Excavation LLC BY DEEP EXCAVATION LLC UNDER SPECIFIC
LICENCE. This report has printed because the user has accepted responsibility as described in the disclaimer and EULA
File: C:\Users\User\Desktop\new1.SNLP
Extended analysis summary for all design sections
Design section Calculation FS Slope Fmax Nails (kN) Fmax Nails at He STR Check Nails STR Check Plates STR Check Facing
Base model Calculation succe 0.798 189.8 134.4 10.85 0.535 0.961
4/9
Stage Calculation FS Slope Fmax Nails (kN) STR Check Nails STR Check Plates STR Check Facing
Exc. 31ft Calculated 0.798 189.8 134.4 10.85 0.535 0.961
Table: Analysis summary for all stages, Part 1
Stage Analyzed FS min FS req. code Type Xc (m) Zc (m) R (m) Active (deg) Passive (deg)
Exc. 31ft Yes 0.798 1.5 Automatic Auto Auto N/A N/A N/A