17 April Report
17 April Report
Dated 17-04-2020
DAILY REPORT
Overview:
Visited the power plant site area, observed and followed the maintenance
activities performed during the day.
Maintenance Activities:
Throughout the day following maintenance activities are witnessed in the plant
site area:
ST Condenser:
The cleaning of tubes of condenser water box side A is completed by mechanical
maintenance department. Now the cleaning of condenser water box side B is in
progress with high pressure jet cleaner.
DAILY REPORT
WTP Analyzers:
A few days ago, I&C maintenance department installed two analyzers for demin
water PH and Conductivity and one analyzer for mix bed A,B conductivity. Today
the calibration of all these analyzers was performed by I&C maintenance
department.
Inspection of AC Units:
Inspection of AC units of all the PEECC’s was performed by HVAC department.
Cleaning of filters was also performed.