425-525 MW CCPP Nandipur Gujranwala Daily Progress Report: Dated 13-04-2020

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

DAILY REPORT

425-525 MW CCPP Nandipur Gujranwala

Daily Progress Report

Dated 13-04-2020
DAILY REPORT

Overview:
Visited the power plant site and followed the operation and maintenance
activities performed during the day.

Operation Activities:
The operation activities of the day are listed below:
1) The turning gears of all three gas turbines and the steam turbine were engaged
for two hours as part of weekly operation activities during the shutdown period of
the complex.
 Turning Gear of GT-1 was engaged at 9:42AM and stopped at 11:42AM.
 Turning gear of GT-2 was engaged at 9:41AM and stopped at 11:41AM.
 Turning gear of GT-3 was engaged at 9:45AM and stopped at 11:45AM.
 Turning Gear of ST was engaged at 9:34AM and stopped at 11:40AM.
2) Steam turbine portable lube oil purifier was taken in service for 8 hours.

Maintenance Activities:

During the day following maintenance activities were witnessed:

HP Live Steam MOV:


The copper sleeve of Motor operated valve of HP live steam of HRSG-3 was
replaced. The valve operated perfectly by motor but when the
DAILY REPORT

valve was operated manually, the valve got stuck. The maintenance team tried to
solve the issue but the issue still persists, tomorrow the work will continue on this
MOV.

Condenser Tubes Cleaning:


The jet cleaning of condenser water box side B was performed with Fussen
FS22/50 high pressure cleaner. The pressure of water was adjusted at 200 bar and
water was injected into each tube for 25 seconds. This activity is continued for a
number of days and will continue tomorrow. The size of jet cleaning gun was also
adjusted to make it easier for the person to clean the tubes.
DAILY REPORT

Condenser Side A:
The scaffolding from the condenser water box side A was removed.

Lugs and Terminals:


The inspection activity of heat sensors, Lugs and terminals strips of GT-3 was
carried out by I&C department. During the activity, faulty lugs were also replaced.

20VG-8 Valve:
The 20 VG-8 vent valve of gas line was showing wrong indication on the HMI
screen. I&C department worked on it and fixed the issue.

HP/LP Feed Water Pumps:


The cleaning activity of HP/LP feed water pumps was performed by mechanical
maintenance department.