425-525 MW CCPP Nandipur Gujranwala Daily Progress Report: Dated 13-04-2020
425-525 MW CCPP Nandipur Gujranwala Daily Progress Report: Dated 13-04-2020
425-525 MW CCPP Nandipur Gujranwala Daily Progress Report: Dated 13-04-2020
Dated 13-04-2020
DAILY REPORT
Overview:
Visited the power plant site and followed the operation and maintenance
activities performed during the day.
Operation Activities:
The operation activities of the day are listed below:
1) The turning gears of all three gas turbines and the steam turbine were engaged
for two hours as part of weekly operation activities during the shutdown period of
the complex.
Turning Gear of GT-1 was engaged at 9:42AM and stopped at 11:42AM.
Turning gear of GT-2 was engaged at 9:41AM and stopped at 11:41AM.
Turning gear of GT-3 was engaged at 9:45AM and stopped at 11:45AM.
Turning Gear of ST was engaged at 9:34AM and stopped at 11:40AM.
2) Steam turbine portable lube oil purifier was taken in service for 8 hours.
Maintenance Activities:
valve was operated manually, the valve got stuck. The maintenance team tried to
solve the issue but the issue still persists, tomorrow the work will continue on this
MOV.
Condenser Side A:
The scaffolding from the condenser water box side A was removed.
20VG-8 Valve:
The 20 VG-8 vent valve of gas line was showing wrong indication on the HMI
screen. I&C department worked on it and fixed the issue.