Summary
This document sets out the design procedure for pavement foundations in terms of the ability of
the foundation to resist loads applied both during construction and the service life of the
pavement.
Contents
Release notes 3
Foreword 4
Publishing information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Contractual and legal considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Introduction 5
Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Assumptions made in the preparation of this document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Mutual Recognition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. Scope 9
Aspects covered . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Use of GG 101 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3. Foundation designs 12
Applicability for restricted, performance and widening foundations . . . . . . . . . . . . . . . . . . . . . . . 12
General requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Restricted foundation designs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
General requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Options and restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Thickness charts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Performance foundation designs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
General requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Layer stiffness requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Thickness design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Widening of pavement foundations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
5. Normative references 25
6. Informative references 26
1
CD 225 Revision 0 Contents
Notification 47
2
CD 225 Revision 0 Release notes
Release notes
Version Date Details of amendments
0 Mar 2020 CD 225 replaces IAN 73/06 Revision 1 (2009) and HD 25/94. This full
document has been rewritten to make it compliant with the new Highways
England drafting rules and extensively restructured, with corresponding
updates to the MCHW Volume 1 Series 800 and MCHW Volume 2, Series 700
and Series 800.
3
CD 225 Revision 0 Foreword
Foreword
Publishing information
This document is published by Highways England.
This document supersedes IAN 73/06 Revision 1 (2009) and HD 25/94 which are withdrawn.
4
CD 225 Revision 0 Introduction
Introduction
Background
The main function of a pavement foundation is to distribute the applied vehicle loads to the underlying
subgrade, without causing distress in the foundation layers or in the overlying layers. This is required
both during construction and during the service life of the pavement.
Pavement foundations are designed on the basis of practical minimum layer thicknesses for
construction, protection of the subgrade during construction and long term provision of support to the
overlying pavement layer. Other considerations include drainage and durability.
In the short-term during pavement construction, the stresses in the foundation are relatively high. It is
expected that loads are going to be applied to the foundation by delivery vehicles, pavers and other
construction plant. At any level where such loading is applied, the stiffness and material thickness of
the layer has to be sufficient to withstand the load without damage occurring that might adversely
influence, to any significant extent, the long-term performance.
In the longer-term during the in-service life of a pavement, the stresses in the foundation are expected
to be lower than during construction; although the foundation is going to experience repeated loads
from traffic. It is essential that the assumed support of the foundation to the pavement is maintained,
otherwise, deterioration of the upper pavement layers is going to occur more rapidly than anticipated.
This document sets out the permitted approaches that can be taken when designing a new pavement
foundation. A variety of materials can be utilised in the foundation in the capping and subbase layers.
The designer can take advantage of improved foundation materials by using them to construct stronger
and stiffer foundations that require a reduced thickness of overlying pavement construction (refer to CD
226 [Ref 1.N]).
Three foundation design approaches are presented:
1) A restricted design approach that offers assurance of performance of the foundation through use of
a limited palette of well understood materials.
2) A performance design approach that gives flexibility to the designer in terms of the materials that
can be used in the foundation conjunction with top of foundation testing to confirm performance
requirements have been met.
3) A widening design approach that utilises a restricted or performance design approach to assure the
performance of the foundation whilst considering the additional requirements to provide sub-surface
drainage continuity between the existing pavement and the widening.
Mutual Recognition
Where there is a requirement in this document for compliance with any part of a "British Standard" or
other technical specification, that requirement may be met by compliance with the Mutual Recognition
clause in GG 101 [Ref 3.N].
5
CD 225 Revision 0 Abbreviations and symbols
Abbreviations
Abbreviation Definition
CBR California bearing ratio
msa Million standard axles
NINS Non-intercellular neoprene foam sheet
Symbols
Symbol Definition
A Cross sectional area of the permeameter
c Temperature correction factor µT/µ20, obtained from a standard chart
d50 Median grain (particle) size
d100 Maximum particle size
E Estimated subgrade surface modulus
Gsa Apparent relative particle density
∆H Head difference across specimen
Hg Mercury (as used in pressure measurement)
i Hydraulic gradient
k Coefficient of permeability
k20 Coefficient of permeability at standard laboratory temperature of 20°C
L, W, D Length, width and depth of the specimen
M Total mass of aggregate in permeameter
MPa MegaPascal
Mw Mass of water
n Porosity
q Steady state flow rate
q20/A Flow rate per unit area standardised to 20°C
Rc Compressive strength
Sr Degree of saturation
T Temperature
V Volume of sample
µ Dynamic viscosity of water
µT Dynamic viscosity of water at ambient temperature
µ20 Dynamic viscosity of water at standard laboratory temperature of 20°C
ρs Dry density of sample
ω Water content
6
CD 225 Revision 0 Terms and definitions
Terms
Term Definition
Ratio obtained by dividing the oven-dried mass of an aggregate
sample by the volume it occupies in water including the volume of
Apparent relative particle
any internal sealed voids but excluding the volume of water in any
density
water accessible voids (apparent relative density synonymous with
apparent specific gravity Gsa).
Capping An improvement layer on top of the subgrade, protecting the
subgrade from damage and/or increasing the stiffness at formation
level.
The mean discharge velocity of flow of water in a soil under the
Coefficient of permeability
action of a unit hydraulic gradient.
Construction subgrade
A value of stiffness modulus of the subgrade measured during
surface
construction.
modulus
An estimated value of stiffness modulus for the subgrade used for
Design subgrade surface
foundation design. It is the lower of the short-term and long-term
modulus
subgrade surface modulus.
Formation Level upon which subbase is placed.
Foundation All materials up to and including subbase.
A stiffness modulus based on the application of a known load at the
top of the foundation; it is a composite value representing all of the
Foundation surface modulus
foundation layers under the completed pavement. A design value
for the confined foundation under a pavement.
Foundation surface modulus The design class of the foundation, based upon the long-term
class foundation surface modulus.
The ability of a material to allow the passage of a fluid in the
Horizontal permeability
horizontal plane.
Hydraulically bound mixture A mixture which sets and hardens by hydraulic reaction.
The ratio of the difference in total head of water on either side of a
Hydraulic gradient layer of material or soil, to the thickness of the layer measured in the
direction of flow.
The stiffness modulus assigned to a given layer that accounts for
Layer stiffness
in-service conditions and degradation.
Long-term subgrade surface An estimated value of stiffness modulus for the subgrade when a
modulus state of equilibrium is reached under the pavement.
The quotient obtained when the mass of dry aggregate filling a
Loose bulk density specified container without compaction is divided by the capacity of
that container.
Pavement All layers above formation.
Short-term subgrade surface An estimated value of stiffness modulus for the subgrade during
modulus construction.
7
CD 225 Revision 0 Terms and definitions
Terms (continued)
Term Definition
An axle exerting or applying a force of 80 kN. The structural wear
associated with each vehicle increases significantly with increasing
axle load. Although alternative methods are available, structural
Standard axle
wear for pavement design in the UK is taken as being proportional
to the 4th power of the axle load. The number of standard axles is
the estimated structural wear factor for the vehicle class.
Steady-state flow In which flow into a system is equal to flow out of the system.
Stiffness modulus The ratio of applied stress to induced strain.
A platform layer upon which the main structure of a pavement is
Subbase constructed. The subbase is both part of the foundation and
pavement.
Sub-formation Level upon which capping is placed.
Subgrade Soil or fill underlying a pavement.
A stiffness modulus based on the application of a known load at the
Surface modulus
top of a layer.
8
CD 225 Revision 0 1. Scope
1. Scope
Aspects covered
1.1 This document provides details of the requirements that shall be used to design pavement foundations.
Implementation
1.2 This document shall be implemented forthwith on all schemes involving the construction, improvement
and maintenance of pavements on the Overseeing Organisations' motorway and all-purpose trunk
roads according to the implementation requirements of GG 101 [Ref 3.N].
Use of GG 101
1.3 The requirements contained in GG 101 [Ref 3.N] shall be followed in respect of activities covered by
this document.
9
CD 225 Revision 0 2. Subgrade assessment and requirements
E = 17.6(CBR)0.64 M P a
where:
E = estimated subgrade surface modulus
CBR = California bearing ratio (CBR) of the subgrade
NOTE Equation 2.4 is valid for CBR values in the range 2 to 12 per cent.
2.5 The design subgrade surface modulus shall be determined as being equal to the lower of the
short-term subgrade surface modulus and the long-term subgrade surface modulus values.
2.5.1 For widening schemes, the depth at which the design subgrade surface modulus is determined may be
dependent on any requirements to maintain drainage continuity between the existing carriageway and
the proposed widening.
2.6 For each characteristic section of subgrade, the following shall be detailed:
1) start and end chainage;
2) short-term subgrade surface modulus (MPa);
3) long-term subgrade surface modulus (MPa); and,
4) design subgrade surface modulus (MPa).
2.7 Where the design subgrade surface modulus is lower than 30 MPa, improvement of the subgrade shall
be undertaken.
NOTE 1 Subgrades with a design subgrade surface modulus value lower than 30 MPa are unsuitable to support
the construction of a pavement foundation.
NOTE 2 Options for improvement of the subgrade include excavation and replacing between 500 to 1000 mm of
the soft subgrade with granular fill, mechanical stabilisation (geogrids and/or geotextiles) and soil
stabilisation.
10
CD 225 Revision 0 2. Subgrade assessment and requirements
2.8 The upper limit on design surface modulus for areas of improvement of the subgrade shall be 50 MPa.
2.9 A testing regime, specified in accordance with the MCHW [Ref 4.N], shall be detailed to establish the
construction subgrade surface modulus.
2.10 Wherethe construction subgrade surface modulus is found to be lower than the design subgrade
surface modulus, then action shall be taken by either effecting improvement of the subgrade (see
clause 2.8) or by reviewing the design subgrade surface modulus with a view to redesign using the
lower value (see clause 2.5).
11
CD 225 Revision 0 3. Foundation designs
3. Foundation designs
Applicability for restricted, performance and widening foundations
3.1 Subgrade characteristic sections shall be divided into one or more foundation areas.
3.2 Each foundation area shall have a single design approach.
3.3 The design approach for each foundation area shall be one of the following:
1) restricted;
2) performance; or,
3) widening (restricted or performance).
NOTE Restricted and performance design approaches can be implemented on the same scheme where
different design approaches are appropriate depending on the requirements of specific areas within the
scheme e.g. slip roads versus mainline.
3.4 The design approach shall be determined based on the scheme type, the availability of materials and
economics.
NOTE 1 The restricted foundation design options are based on a limited selection of materials linked to an
assumed performance which does not require verification via performance testing of the foundation.
NOTE 2 Performance foundation designs can offer economic benefits through innovation and/or the use of
materials not permitted within restricted foundation designs. Assurance of material performance is
provided by the performance related specification outlined within the MCHW [Ref 4.N].
NOTE 3 Foundation designs for carriageway widening can follow either a restricted or performance foundation
design approach with additional measures to ensure drainage paths are not impeded by the widening
of the carriageway.
General requirements
3.5 For each foundation area, the design approach shall be detailed, i.e. restricted or performance, and
whether it is widening.
3.6 Details of foundation designs shall be recorded as required in CD 226 [Ref 1.N] Section 6.
NOTE See Clauses 2.6, 3.5, 3.11, 3.24 that define the foundation design details to be recorded.
3.7 The design for all foundation areas shall be based on achieving a foundation class selected from Table
3.7.
NOTE Foundation class 4 is not available for the restricted foundation design approach due to a lack of
performance data sets generated since the inclusion of this foundation class in 2006. Therefore,
foundation class 4 is only permitted as a performance foundation.
3.8 The foundation class shall be used in the pavement design within CD 226 [Ref 1.N].
3.9 The design subgrade surface modulus (see Section 2) for each characteristic section shall be used in
the foundation design.
12
CD 225 Revision 0 3. Foundation designs
3.10 Design layer thicknesses in this section assume the foundation carries up to 1000 standard axles
during construction. Where higher levels of construction traffic are anticipated (e.g. for a haul road), the
design layer thickness shall be assessed for suitability versus the limiting requirement on vertical strain
the subgrade (see Section 4).
3.10.1 LR1132 [Ref 13.I] may be used to establish the subbase thickness required for different levels of
cumulative construction traffic.
3.10.2 Additional subbase thickness may be required for other reasons such as at interfaces, regulation or for
drainage continuity.
Thickness charts
3.16 Design nominal thicknesses for each layer shall be rounded up to the nearest 10 mm.
NOTE For worked examples demonstrating use of the thickness charts, see Appendix B.
3.17 The design thickness for foundation class 1 designs shall be obtained from Figure 3.17.
13
CD 225 Revision 0 3. Foundation designs
3.18 The design thickness for subbase only foundation class 2 designs shall be obtained from Figure 3.18.
3.19 The design thickness for subbase only foundation class 3 designs shall be obtained from Figure 3.19.
14
CD 225 Revision 0 3. Foundation designs
3.20 The design thicknesses for subbase on capping for foundation class 2 restricted designs shall be
obtained from Figure 3.20.
15
CD 225 Revision 0 3. Foundation designs
3.21 The design thicknesses for subbase on capping for foundation class 3 restricted designs shall be
obtained from Figure 3.21.
16
CD 225 Revision 0 3. Foundation designs
3.22 The design thickness for subbase on a constant thickness of bound capping (in-situ stabilised soil as
per Series 600 of the MCHW [Ref 4.N]) for foundation class 2 shall be obtained from Figure 3.22.
17
CD 225 Revision 0 3. Foundation designs
NOTE Other constant nominal thicknesses of capping can be used via the performance foundation design
approach.
3.23 The design thickness for subbase on a constant thickness of bound capping (in-situ stabilised soil as
per Series 600 of the MCHW [Ref 4.N]) for foundation class 3 shall be obtained from Figure 3.23.
18
CD 225 Revision 0 3. Foundation designs
3.25 Performance foundation designs shall be subject to performance testing in accordance with Series 800
of the MCHW [Ref 4.N].
3.26 A demonstration area to meet the requirements of the MCHW [Ref 4.N] shall confirm the performance
of the foundation design.
19
CD 225 Revision 0 3. Foundation designs
3.27 Where the demonstration area fails to meet the requirements of the MCHW [Ref 4.N] for that
foundation class, then the materials shall be modified or the foundation redesigned.
3.27.1 The foundation redesign may involve increasing foundation thickness and/or changing the materials
used.
3.28 For the main works, a testing regime shall be detailed to confirm that the performance requirements of
the MCHW [Ref 4.N] have been achieved.
3.29 The foundation surface modulus shall be equal to or higher than that specified in the MCHW [Ref 4.N]
for the designed foundation class.
NOTE The foundation surface modulus measured in accordance with the MCHW [Ref 4.N] is for a partially
confined foundation and is not to be confused with the long-term confined foundation surface modulus
values within Table 3.6.
3.30 Where the foundation surface modulus is lower than that specified in the MCHW [Ref 4.N] for the
designed foundation class, action shall be taken to either undertake improvement or review the
foundation design.
NOTE The approach for improvement is dependent on the scale of the issue and the practical options
available on site.
3.31 Where a foundation area within the main works fails to comply with the surface modulus performance
measurement requirements, and the foundation is to be redesigned, the suitability of the redesigned
foundation shall be confirmed with a demonstration area, specified in accordance with the MCHW [Ref
4.N].
20
CD 225 Revision 0 3. Foundation designs
NOTE 1 The type, condition, construction thicknesses and levels of the layers in the adjacent pavement and
foundation are key to the design of the widened pavement and foundation.
NOTE 2 This section only details the requirements for the pavement foundations.
3.41 For widening, the design for each foundation area shall follow either a restricted or performance
foundation design approach.
3.42 The foundation design for widening shall provide continuity of drainage.
NOTE The requirement for drainage continuity can result in a thicker subbase layer than required by the
foundation design.
3.42.1 Continuity of drainage may be achieved by selecting appropriate:
1) materials that do not inhibit the flow of subsurface drainage through the foundation;
2) layer thicknesses;
3) crossfalls.
3.43 Edge of pavement drains shall be as detailed in pavement drainage design guidance CD 524 [Ref 2.N].
3.44 Where the existing subsurface drainage falls towards the existing pavement, the formation level within
the widening shall fall in the opposite direction, away from the existing pavement, to avoid additional
water contributing to the existing drainage paths (see Figure 3.44).
NOTE Additional thickness of subbase to match the existing formation level in this scenario is not required.
However, there can be practical construction benefits to doing so.
3.45 Where the existing subsurface drainage falls towards the widening, the formation level within the
widening shall either match or be lower than the existing formation level (refer to Figure 3.45, for
example).
21
CD 225 Revision 0 3. Foundation designs
22
CD 225 Revision 0 4. Procedure for performance foundation designs
4.4 The vertical strain in the subgrade for the corresponding subgrade surface modulus value shall not
exceed the limits as shown in Figure 4.4.
23
CD 225 Revision 0 4. Procedure for performance foundation designs
NOTE Based on the principles presented by LR1132 [Ref 13.I], these limits assume that the foundation carries
up to 1000 standard axles of traffic with no more than 40 mm deformation at the top of subbase.
4.4.1 Trafficking at lower levels may be permitted provided the deformation limits given in the performance
specification are not exceeded.
4.5 The deflection of the foundation shall be calculated under the action of a standard wheel load (40 kN
load over a 151 mm radius loaded area).
4.6 The maximum deflection of the foundation for each foundation class under a standard wheel load (40
kN load over a 151 mm radius loaded area) shall be:
1) Foundation class 1 - 2.96 mm;
2) Foundation class 2 - 1.48 mm;
3) Foundation class 3 - 0.74 mm;
4) Foundation class 4 - 0.37 mm.
NOTE These limits are based primarily on the criteria used in LR1132 [Ref 13.I] but adjusted for reasons given
in PPR 127 [Ref 6.I].
4.7 The Poisson's Ratio value used in the design for subbase materials shall be 0.35.
4.8 The Poisson's Ratio value used in the design for subgrade materials including capping and the 10,000
MPa layer assumed 1.5 m below the surface of the subgrade shall be 0.45.
24
CD 225 Revision 0 5. Normative references
5. Normative references
The following documents, in whole or in part, are normative references for this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies.
Ref 1.N Highways England. CD 226, 'Design for new pavement construction'
Ref 2.N Highways England. CD 524, 'Edge of pavement details'
Ref 3.N Highways England. GG 101, 'Introduction to the Design Manual for Roads and
Bridges'
Ref 4.N Highways England. MCHW, 'Manual of Contract Documents for Highway Works'
25
CD 225 Revision 0 6. Informative references
6. Informative references
The following documents are informative references for this document and provide supporting
information.
Ref 1.I BSI. BS EN ISO 4787, 'Laboratory glassware. Volumetric instruments. Methods for
testing of capacity and for use'
Ref 2.I BSI. BS 1377-5, 'Methods of test for soils for civil engineering purposes.
Compressibility, permeability and durability tests'
Ref 3.I BSI. BS 1377-6, 'Methods of test for soils for civil engineering purposes.
Consolidation and permeability tests in hydraulic cells and with pore pressure
measurement'
Ref 4.I BSI. BS 1377-4, 'Methods of test for soils for civil engineering purposes. Part 4.
Compaction related tests'
Ref 5.I BSI. BS 5835-1, 'Recommendations for testing of aggregates. Compactibility test for
graded aggregates'
Ref 6.I TRL Ltd. Chaddock, B & Roberts, C. PPR 127, 'Road foundation design for major UK
highways'
Ref 7.I National Physical Laboratory. Kaye GWC & Laby TH. Kaye & Laby , 'Tables of
physical and chemical constants and some mathematical functions'
Ref 8.I BSI. BS EN 932-6, 'Tests for general properties of aggregates. Definitions of
repeatability and reproducibility'
Ref 9.I BSI. BS EN 932-1, 'Tests for general properties of aggregates. Methods for sampling'
Ref 10.I BSI. BS EN 1097-3, 'Tests for mechanical and physical properties of aggregates.
Determination of loose bulk density and voids'
Ref 11.I BSI. BS EN 1097-6, 'Tests for mechanical and physical properties of aggregates.
Determination of particle density and water absorption'
Ref 12.I BSI. BS EN 1097-5, 'Tests for mechanical and physical properties of aggregates.
Determination of the water content by drying in a ventilated oven'
Ref 13.I TRL. Powell, WD, Potter, JF, Mayhew, HC & Nunn, ME. LR1132, 'The structural
design of bituminous roads'
Ref 14.I ASCE Journal of the Hydraulics Division, Vol 93, pp 137-148. Dudgeon, CR. ASCE
Proc Paper 5433, 'Wall effects in permeameters'
26
CD 225 Revision 0 Appendix A. Example performance foundation design charts
27
CD 225 Revision 0 Appendix A. Example performance foundation design charts
28
CD 225 Revision 0 Appendix A. Example performance foundation design charts
29
CD 225 Revision 0 Appendix A. Example performance foundation design charts
30
CD 225 Revision 0 Appendix A. Example performance foundation design charts
31
CD 225 Revision 0 Appendix A. Example performance foundation design charts
32
CD 225 Revision 0 Appendix B. Worked examples
33
CD 225 Revision 0 Appendix B. Worked examples
34
CD 225 Revision 0 Appendix B. Worked examples
35
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
C1.2 Scope
The test can be used to determine the horizontal permeability of embankment drainage layers, capping
materials and subbases and can be used to supplement the information required by Clause 640 of the
MCHW [Ref 4.N].
It is used where, subject to limitations set out below, particle sizes within the granular specimens exceed
those that can be tested using methods described in BS 1377-5 [Ref 2.I] and BS 1377-6 [Ref 3.I].
Whilst the apparatus and test methods are currently the best available, as with any test procedure, there
are limitations on reproducibility and repeatability. The test can only be applied to conditions of laminar
flow and not to situations where high hydraulic gradients and turbulent flow might occur in practice.
C1.3 Background
Granular layers can be used to provide drainage of pavement layers beneath roads and for the relief of
pore pressures within embankments. These layers need to exhibit both adequate drainage and load
bearing properties. There is a conflict in that a well graded material is needed for load bearing but this
is detrimental to the drainage properties.
The selection of coarse materials for use as drainage layers is usually achieved by the specification of
a grading envelope. Large variations in permeability within these grading envelopes have been noted.
Where there is a need to specify the permeability of such layers (e.g. according to Clause 640 of the
MCHW [Ref 4.N]) the test described in Appendix C provides a mean to determine the horizontal
permeability of drainage, subbase and capping materials in their compacted states.
C2 Apparatus
C2.1 Introduction
The permeameter consists of a steel box capable of accepting a sample of size approximately 1.0 m x
0.3 m x 0.3 m (Figure C.1). The sample is retained by a grid at either end of the box. The aperture size
of the grids depends on the grading of the material, so that the particles are supported without
impeding the flow. Experience has shown that an aperture size of 1-2 mm is satisfactory for the
materials likely to be tested.
36
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
Figure C.1 Schematic diagram of apparatus
37
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
Figure C.2 Test box typical details
38
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
39
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
10) Manometers and scale. The manometers to be mounted on a board behind the apparatus to
measure the water levels in the two weirs by means of flexible PVC tubing submerged in each weir
away from the circular hole in the base of the weir. (An inclined manometer board is useful for
measuring small differences in head).
11) A spirit level.
12) A metre rule with scale divisions every 0.5 mm.
13) A stopwatch, calibrated to within 1 s in 5 min.
14) A one litre measuring cylinder, graduated every 10 ml, calibrated by weighing the amount of distilled
water that it contains at a measured temperature using a calibrated balance and applying the tables
in BS EN ISO 4787 [Ref 1.I].
15) A thermometer, readable to 0.1°C, calibrated against a reference standard before using.
16) Facilities for determination of water content to BS EN 1097-5 and relative density according to BS
EN 1097-6 [Ref 11.I].
C3.2 Procedure
C3.2.1 Preparation
1) The box should be placed on a firm, horizontal surface allowing water to be collected or run to waste
at either end.
2) The material should be weighed before it is compacted into the box to find its mass.
3) Compact the material in 3, 4 or 5 layers (depending on maximum particle size) into the central part
of the box between the two end grids. Each layer should be compacted to the density expected on
site at the optimum water content determined from BS 1377-4 [Ref 4.I] Clause 3.7 or from BS
5835-1 [Ref 5.I].
4) Take a sample of the remaining material for water content (w) determinations according to BS EN
1097-5 [Ref 12.I], loose bulk density according to BS EN 1097-3 [Ref 10.I] and relative density Gsa
determination according to BS EN 1097-6 [Ref 11.I].
5) Measure the dimensions of the sample, i.e. length (L), width (W) and depth (D) to an accuracy of ±
0.5 mm.
6) Fit appropriate extension pipes and weirs at either end to give a suitable head difference of 30 to 40
mm across the sample. Ensure that all joints are well tightened as they should be capable of holding
a vacuum (use pipe jointing compound and PTFE tape where appropriate).
7) Place a piece of sealed cell foam of appropriate size on top of the sample.
8) Fit the gasket and then the lid on to the box (the vacuum tap can be at either end of the box) and
tighten all nuts and bolts, forcing the bars on the lid down into the foam sheet and ensuring a good
seal across the top of the sample and also between the lid and the flange.
40
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
9) Connect the water supply from the storage tank to the bung fitted to the weir furthest from the
suction tapping. Fit the plain bung in the other weir. Leave the water supply tap closed.
10) Open the vacuum tap and lift that end of the box slightly. Apply a vacuum using the filter pump.
Tighten the bolts on the lid while the box is under vacuum.
11) When a vacuum of at least 7 m water (508 mm Hg) and preferably around 9.5 m water (699 mm Hg)
below atmospheric has been achieved, open the water supply tap slightly, allowing water to flow in
slowly and saturate the sample.
12) Water should flow in so as to fill the box in about 15 minutes. When water is seen in the clear hose
attached to the vacuum tap, let it flow briefly before shutting the vacuum tap.
13) Leave the water supply tap open for a few minutes to allow the water pressure to build up. Briefly
open the vacuum tap to bleed off any more air which has collected.
14) Remove the bungs. Fill the box until there is some water in the lower weir. Turn off the water supply
tap.
C3.2.2 Testing
1) Supply the water to the higher (upstream) weir and adjust the flow throughout the test so that this
weir just overflows.
2) Measure the flow rate (q) at the discharge end at 15 minute intervals.
3) Measure the head difference ( ∆H ) between the upstream and downstream weirs, by means of the
manometers.
4) Measure the water temperature (T) at both ends of the permeameter throughout the duration of the
test and calculate the average.
5) Continue the test until a steady flow rate is achieved i.e. subsequent measurements within 5% of
each other (this may take several hours). Occasionally remove accumulated air by briefly opening
the vacuum tap.
6) Observe when the discharge water appears to be clear. If it continues to be very dirty, take some
samples, noting the time of sampling.
7) Results should be reported on an appropriate record sheet.
8) Test the material over a range of head differences. The head difference can be altered either by
changing the extension pipes or, for small changes, by lifting the permeameter at one end. During
test maintain a plot of flow rate (q), against head difference ( ∆H ). The plot indicates the linear
region for which Darcy's law is applicable.
9) After testing, take a representative sample of material from the permeameter for a particle size
distribution analysis (wet sieving test).
10) When removing the sample from the box, take note of anything which may adversely have affected
the results (e.g. evidence of piping, flow across top of sample, non-saturation of sample).
41
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
(Mw 1 − Mw 2) + ρs
Sr =
1000n
where:
Mw 1 = total mass of water added (kg)
Mw 2 = mass of water required to fill box ends and fittings only (kg)
n = porosity (%)
Sr = degree of saturation
C4 Results calculation
C4.1 Coefficient of permeability
The coefficient of permeability, k, at any temperature T is given by equation C.2.
42
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
For each head difference, ∆H , the hydraulic gradient, i, and the flow rate per unit area, q20/A, corrected
to the standard laboratory temperature of 20°C are calculated using the equations C.3 and C.4.
q20/A is plotted against i and the best straight line drawn from the origin through those points exhibiting
a linear relationship. (refer to Figure C.5, plot for sample results). The gradient of this line gives k20, the
coefficient of permeability at standard laboratory temperature.
43
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
Figure C.5 Sample results plot of flow rate per unit area (q20) vs. hydraulic gradient
(i)
44
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
where:
D = depth (m)
Gsa = apparent relative particle density
L = length (m)
M = total mass of aggregate in permeameter (kg)
n = porosity (%)
W = width (m)
ω = water content (%)
45
CD 225 Revision 0 Appendix C. A permeameter for road drainage layers
46
CD 225 Revision 0 Notification
Notification
This document was notified in draft to the European Commission in accordance with Technical
Standards and Regulations Directive 2015/1535/EU.
47
© Crown copyright 2020.
You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the
Open Government Licence. To view this licence:
visit www.nationalarchives.gov.uk/doc/open-government-licence/,
write to the Information Policy Team, The National Archives, Kew, London TW9 4DU,
or email psi@nationalarchives.gsi.gov.uk.