1. PURPOSE:
The method is prepared to ensure that construction of warehouse for the project shall comply on plans specifications
and all relevant standard and code requirements in the execution of different work activities to be performed in the
construction of warehouse and other relevant structures associated with the project. In addition this will serve as a tool to
guide all technical personnel and layman execute proper construction procedures complied with the quality and safety plan
for the projects.
3.1RESPONSIBILITIES:
Project Mr. – 0526404818
Manager Leads and execute timely completion of work and oversee
the safety of the site.
3.2PROJECT MANAGETR:
Implementing the work program / tracking day-to-day Block Work and associated activities as per the
program scheduled.
Ensuring that personnel involved in concreting and associated works meets the minimum qualifications for
their assignment and are properly trained.
In charge of maintaining the safety standards by all staff and ensuring that they have required HSE
Training.
3.3PROJECT ENGINEER:
Responsible for the entire activities of Block work and associated work complying with the quality and
safety requirements.
To ensure that the team engineers and foreman are aware of the Method statement and all resource area
available to carry out the work as planned.
To liaise with the CMCS to ensure timely approval of WIR, Shop drawing etc
Responsible for the supervision of Block work and associated work as per approved method statement and
drawings.
To ensure that all equipment’s required for the works are available and in good condition.
To ensure that all the technical matters and changes in the drawings are discussed with the foremen.
HSE officer shall ensure implementation of all safety Procedure while formwork and reinforcement
installation and Block work.
He shall ensure that all controls listed in the HEMP are in place.
Necessary safety instructions are to be provided to the crew based on the site live condition.
He shall maintain continuous inspection of the site activities advice and site crew to prevent accidents,
personnel injury and property damage.
In case of emergencies, he shall initiate all recovery measures as per the emergency procedures.
3.6FIRST AIDER:
First Aider is responsible for maintaining first aid facilities while formwork and reinforcement installation
and concrete pouring.
He shall administer first aid, monitor and report risks and incidents.
To provide first aid to crew working on concrete works when required.
He shall undertake quarterly checks of the office first aid kit to ensure it is compliant with the checklist
issued by HSE staff.
Assist the HSE Officer to carry out quarterly facility inspections.
Assist with any incident investigations and unresolved issues connected with the use of first aid supplies, or
action by the HSE Officer at the site.
Promote good safety practice within the site.
3.7SITE SUPERVISIOR:
He will coordinate with the Site Engineer on a daily basis and will ensure proper distribution of the
workforce and equipment at required locations.
He will be aware of the possible risk hazards involved with concrete works and comply with all safety
requirements prior to start of the activity.
He should give proper Tool Box Talk to his crew for safe handling of work.
3.8OPERATOR:
Will be responsible for safe operation of Concrete pump and place the pump in safe and stable positions.
3.9BANKSMAN:
He will be responsible for guiding Concrete pump operator and Transit Mixer driver for the safe operation.
4. MATERIALS:
6. HSE Requirements:
The crew must complete the compulsory HSE training like HSE Induction, Initial Fire Response (IFR),
dealing with Hazard and Risks (DHR) and to possess a valid PDO Passport as a minimum to work in this
project.
Site HSE induction will be completed for the crew prior to entering the site with a sticker labelled ”HSE
INDUCTED” affixed on to their helmet.
All Crew will wear Helmet, Safety Shoe & High Visibility Jacket and will use need based PPE like Hand
Gloves, Dust mask and Goggles etc.
The supervisor to make an assessment of the hazards & risks with respect to the concrete works and to fill
the TRIC.
The site Supervisor/ Forman will conduct Tool Box Talk (TBT) based on TRIC and will obtain attendance
of the crew.
Supervisor will ensure that all control measures for the specific task are in place as per TRIC.
Shoring to be done as the depth increases so that carpenters and Steel fixers can work safely in the pit. Shore
the sides of excavations for structures, trenches and pits to prevent them from slipping or falling.
Proper access to the work areas will be maintained throughout the working period for easy working. In case
of emergency and the crew should gather at assembly point located nearby.
Equipment’s like Back Hoe Loader, wheel loader will be provided with Banks man for giving directions.
All operators & banks man should be trained, competent. HSE inspection/ training will be verified for all
the plant/ equipment / vehicle operators / drivers prior to commencement of work.
Right type of machinery / tools for the work will be used..
First Aider, First aid box will be available at site.
Drinking water facility will be provided by the company management.
The crew members will make use of the welfare facilities and the first aid arrangements and must have a
valid 3rd party certificate.
The Crew will work only if the climatic conditions are favourable for the tasks.
An emergency Vehicle will be made available at site.
If hazards are found, the operator will refer to supervisor and establish a safe working method before
commencement of work.
All the rebar edges will be covered with padding protection.
All scaffolding will be fitted with guard rails and toe boards.
All scaffolding more than the height of 9 M should be inspected by approved 3rd party.
Person working at height will wear Safety harness.
TBT will be conducted regularly prior to start of work.
Open excavations will be barricaded at least one meter away from the opening.
All necessary sign boards & barricades should be placed in position in all required places.
7. METHODOLOGY:
Contractor Premises of Consultant Review point - Representative of indicated party to review submitted
Inspection / Site Work R
Approval documents, result of test etc..
Area Coordinates Acceptance Criteria
(Controlling
Owner
Description of Inspection & Procedure, Contractor Consultant Specific
Activity NO Drawing N" of reference
Test Activity Specifications, Contractor CEC Quality Punchlist
Standars etc..) H W R H W R H W R Signature Signature Report Item N"
MATERIALS AS PER
1
SUBMITTAL APPROVAL
2 LAYOUT MARKING
3 CHECK MORTAR MIX
4 CHECK FOR OPENINGS
5 CURING INSPECTION
LOYAL BUILDING CONTRACTING LLC
BLOCKWORK - METHOD STATEMENT, INSPECTION TEST PLAN & RISK ASSESSMENT
Task/Job/Operation: BLOCK WORKS Project: : PROPOSED G-ONLY OFFICE, G+M Ref No: RA-LBC-007 REV-0
WORKERS FACILITY, G-ONLY SHED, OPENSHED &
Main Contractor: LOYAL BUILDING CONTRACTING Risk Assessor:
LLC. OPEN WASH AREA ON PLOT NO. 5337865 @ SAIH Mr. JAMES NEEL (SO)
Client: AL MANAR SCAFFOLDING RENTALS L.L.C. SHUAIB 4, DUBAI.
Date : 5/2/2020 Date Next Review: 5/8/2020 Approved By: Reviewed By:
Mr MUTHUKUMAR (PM) Mr. JOSHUA PRAVIN (SR.SO)
Equipment Required: Shovel, Telescopic handler, bobcat , Recommended PPE: Hard Hat, Safety shoes, Safety Harness, overalls, dust mask,
Scaffolds, Block Cutting Machine, Power tools goggles, gloves
Risks / Who
Risk
Residual
might be
Rating/
Harm/
Risk
Legal compliance
Risk level
E/I/R Control
Job steps/
/Potential
identified
Remarks
Activities
Hazards
L S R
Hazard
Sl no
1 Stacking Improper manual Serious injury due to No 3 4 H R Proper Training for Stacking, 1 4 L
handling, lack of handling & Transportation works.
the accidental contact
complianceLegal
Risks / Who
E/I/R Control
Risk
Job steps/
/Potential
identified
Residual
Remarks
might be
Activities
Hazards
Hazard
Rating/
Harm/
Sl no
Consequenc
Tool box talk on proper manual
handling
es
with Adequate house keeping
proper training Proper Supervision
machinery/Material
Workers are capable for doing job
& adequate Working platform
area
Scaffold must be erected,
dismantled or altered by
competent person, safety harness
Installation of Improper manual must be worn, guard rails & toe
scaffolding for handling, boards are required to all working
miscellaneous lack of proper Death & Fractures due platforms & provide fall
block works & training and skills for to fall from scaffolds,
2 protection(Full body harness) 1 4 L
Scaffolding works & back pain due to body Yes 4 4 H R
working at Proper training for scaffold
fall hazards while injury, serious injury
height:: working
working on
suspended platform Tool box talk on proper manual
& scaffolding handling, erecting of scaffolding
& working on scaffolding
Adequate House keeping
Well supervision
3 Delivery using Improper manual Death, Serious body Yes 4 4 H R Proper training for rigging works & 1 4 L
boom loader & handling, lack of injury, Serious injury procedures.
cranes: proper training and due to accidental Tool box talk on proper manual
skills for standard contact with handling, Using of vehicles/
rigging procedures. machinery Equipment’s
Accidental contact
with the delivery Always secure blocks while on
delivery on upper levels using
complianceLegal
Risks / Who
E/I/R Control
Risk
Job steps/
/Potential
identified
Residual
Remarks
might be
Activities
Hazards
Hazard
Rating/
Harm/
Sl no
Consequenc
cranes & provide nylon net
secured & fix to avoid collapse of
es
blocks
Maintain always good
housekeeping
Proper supervision
trailer & cranes, Adequate signal man with
collapse approved by 3rd party certificate
for vehicle and operator
All vehicles / equipment’s must be
equipped with all safety materials
(reverse alarm, warning light,
license, vehicle certificate &
Approved 3rd party certificates….)
Improper manual
Installation of handling, lack of
blocks at proper training and Proper Training for block works
designed areas skills for concrete Adequate Supervision
using wooden block works. falling
Serious body injury Tool box talk on proper manual
4 platforms & hazards while 2 5 M
No 4 5 H R handling
scaffolds for installation of
miscellaneous Maintain always good
scaffolding and
block works: working at wooden housekeeping.
frames while Use appropriate PPE.
installation of
concrete blocks
All electrical system & electrically
Cutting of Concrete dust Death or burns due to
5 No 3 4 H R operated hand tools must 2 4 M
concrete installation, skin electrocution, cut,
complianceLegal
Risks / Who
E/I/R Control
Risk
Job steps/
/Potential
identified
Residual
Remarks
might be
Activities
Hazards
Hazard
Rating/
Harm/
Sl no
Consequenc
conform to Standards.
Only electrician must install &
es
maintain electrical tool and
absorption, lack of electrical lines.
proper training & All electrical equipment must be
blocks using skills, Accidental laceration body & tested, & inspected
Power tools: contact with rotating serious injury Proper training for Scaffolding
disk & electrical works
hazards while using HSE Induction training conducted
Tool box talk on proper manual
handling
Adequate house keeping
Well supervision
Adequate hygiene facilities
Mixing & should be provided
application of Concrete dust Workers must be aware of
Acute & chronic chest hazards & control of the materials
concrete inhalation, skin
pain, dermatitis, eye being used
6 mortar for absorption, in No 3 4 H R 1 4 M
pain due to foreign All required personal protective
concrete contact with
body equipment must be worn
blocks harmful substance Adequate housekeeping must be
maintained
Adequate supervision
1. Identify Hazards
2. List Hazard Event
3. Calculate Risk Factor with Initial Risk Rating. I.E. Probability x Severity
4. Detail Controls
5. Calculate Residual Risk Rating with Final Risk Rating
6. Enter Risk Priority
7. Evaluate Acceptability of Risk
4 16 12 8 4 6 Medium Risk
3 12 9 6 3 1-4 Low Risk
2 8 6 4 2
Severity
4. Catastrophic – Imminent danger exists, hazard capable of causing death or illness on a wide scale
3. Critical – Hazard can result in serious illness, severe injury, property and equipment damage
2. Marginal – Hazard can cause illness, injury or equipment damage, but the results would not be expected to be serious
1. Negligible – Hazard will not result in serious injury or illness, remote possibility of damage beyond minor first aid case
Probability
4. Probable – Likely to occur immediately or shortly
3. Reasonably Probable – Probably will occur in time
2. Remote – May occur in time
1. Extremely Remote – Unlikely to occur