LIST OF MANUFACTURERS & MATERIALS V2.1/ 24 Jun 2014
ARCHITECTURE
ITEM ITEM DESCRIPTION BRAND / MANUFACTURER NAME MODEL NAME / NUMBER COUNTRY OF ORIGIN SUPPLIER NAME CONTACT No./ FAX REFER TO SPECIFICATION REGISTRATION NO. REMARKS
NO. NUMBER WITH ADCE
A11 GRANITE TILES
Natural materials like granite and marble types can be sourced by any supplier registered with ADCE. Type of granite and marble to be mentioed in the drawings.
A12 MARBLE TILES
1‐ N/A
A13 CEMENT MOSAIC TILES (TERRAZZO) 2‐ N/A 25mm thick
3‐ N/A
1‐ N/A
A14 RAISED FLOOR TILES 2‐ N/A
3‐ N/A
1‐ PASCO CEMENT TILES UAE GOLDEN CORNER 02/6427485 SP‐0220
A15 CLAY ROOF TILES 2‐ TERRAZZO TERRAZZO TILES UAE ALFUJAIRAH MARBAL & TILES 09/2444101/09‐ SP‐0153
2444102
3‐ AG CEMENT TILES UAE RANA TRADING EST. 03/7219219 SP‐0161
1‐ N/A
A16 CONCRETE ROOFING TILES 2‐ N/A
3‐ N/A
1‐ N/A
A17 RUBBER FLOORING / RUBBER TILES 2‐ N/A
3‐ N/A
1‐ N/A
A18 PARQUET FLOORING / ENG. WOOD FLOOR 2‐ N/A
3‐ N/A
1‐ N/A
A19 CARPET FLOORING ROLLS / TILES 2‐ N/A
3‐ N/A
1‐ N/A
A20 VINYL FLOORING 2‐ N/A
3‐ N/A
1‐ FOSROC PROOEX PGP UAE AL GURG FOSROC 04/2039699 SP‐0124
A21 THERMAL INSULATION ‐ HORIZONTAL 2‐ IMI IMPERFLEX UAE IMPERBIT MEMBRANE INDUSTRIES LLC 04/8801616 SP‐0150
(Slabs & Roof) 3‐ SIPLAST ILCOPAL UAE AMC PROTECTION 02/6222820 SP‐0027
1‐ N/A
A22 THERMAL INSULATION ‐ VERTICAL (Columns & 2‐ N/A
Walls) 3‐ N/A
1‐ N/A
A23 ROCKWOOL / FIBERGLASS INSULATION 2‐ N/A 50 kg/m3
3‐ N/A
1‐ NATURAL STONE NATURAL STONE saudi AL HASHEM MARBLE 02‐5515700/02‐ SP‐0372
5515070
A24 NATURAL STONE 03‐7213773/050‐
2‐ NATURAL STONE NATURAL STONE syrian AL QUDS NATURAL STONE & MARBLE CO. LLC SP‐0619
6430439
3‐ NATURAL STONE NATURAL STONE saudi QUICK STONE WORKS 03‐7669771/056‐ SP‐0638
5104440
1‐ N/A
A25 ARTIFICIAL STONE 2‐ N/A
3‐ N/A
1‐ FOSROC UAE AL GURG FOSROC LLC 02/673179
A26 TILES GROUTING (WATERPROOF MATERIAL) 2‐ BASF UAE BASF 02‐5512262
3‐ SODAMCO UAE SODAMCO 02‐5509994
1‐ MAPEI MAPEI ITALY UNITED SUPPLIES
A27 TILE ADHESIVE 2‐ BAL BAL ITALY AL SHAYA 02‐6445441 SP‐0018
3‐ CERCOL CERCOL ITALY SARIEDDINE TRADING 02‐6776121 SP‐0003
PROPOSED COMMERCIAL DEVELOPMENT
FOR MR. NOORULLA MOHAMMED ALI AL KHAJA
ABU DHABI – SECTOR E-41/1 PLOT No.54
DOOR LOCKS & CYLINDERS (INTERNAL & 2‐ Mortise Sash Lockcase, 55mm Backset,72mm Centers, For
A51 STANLEY UK Bin Brook General Trading 02‐ 6772827 SP‐0105
EXTERNAL) Euro Profile Cylinder,/SGM150SL24SS UK
Inox Euro Profile Mortice Lock withStainless Steel forend &
3‐
strike. B/S 55mm C/C 72mm. BS EN 12209, CE marked, SSS
INOX USA Smart Solution 02‐4471322 SP‐0292
Finish./UN‐MD‐7255‐10‐
1‐ Stainless steel double ball bearing butt hinges, 102x76x3. CE
TESA Marked in Grade 304 and Satin Stainless Steel SPAIN Metallic Equipment Co. LLC 02‐6344764 SP‐0193
A52 DOOR HINGES (INTERNAL & EXTERNAL)
2‐ STANLEY 2 Ball Bearing Butt Hinge, Stainless Steel Grade 304, Size 102 x UK Bin Brook General Trading 02‐ 6772827 SP‐0105
76 x 3mm SGH2B433J F
3‐ Inox Ball Bearing Butt Hinge 4"x3"x3mm. Grade 304. Fire
INOX Rated, SSSFinish/UN‐HGS‐403030‐2BB‐32D USA Smart Solution 02‐4471322 SP‐0292
PROPOSED COMMERCIAL DEVELOPMENT
FOR MR. NOORULLA MOHAMMED ALI AL KHAJA
ABU DHABI – SECTOR E-41/1 PLOT No.54
NB : Any extra information about the item can be
d d h " k" l
*Note: Suppliers names and
contact numbers mentioned
in the vender list are for
guidance only, subject to
ADCE registration certificate
and approval.
INDEX
01. Company Profile
02. Catalouge
03. ADCE Ceritificate
04. Trade License
he
l.iP,lj t! 9s q ^Ei ?..i.r1&r tir,,i r l
.,'H;,. -4*-:..1;!!i;JlJ,
{l?
z$i('}: Iilffiiiilil ilililll ililtillllilll ilil ltil ilil li] iilt
ilIililt iltil ilIlllllllll llilt ]ilt ilfl ]il| llll llllllll
+j+Jt riJ&l, L.LaJ1 ;rt,til
i*rNrsinv or nrlrnron
t-n-r-hS,rl {i* (EN- COrrA*4ANOOF CtVtL OEtEt*SI
LIST OF PREVIOUS PROJECTS
s*Jt A**-
tor l{*tura} $tur* & [fi*rble L.L.C. I t. i rt [*.r]t 3 o,.tt!*]elt r.*-*tJ
Commercial Building lt467l marble works Granada Engineering AIAWSAF Gen. Cont.
Mr. Khamis Mubarak AlSaadi Consutant & Maint. Est.
eommercial Building Natural stone works Arco Gansuiting AIAWSAF Gen. eont.
Mr. Mohammad Saeed Matar Engineers & Maint. Est.
:::::..,",*,,#'.Tm
10 eommercial Buiidi Metrix engineerlng Al Feker Genaral contrac
FATHTMA snro ffrEfr,lffi**rill marole works
ffiry'*:];:T:,x*"
ffi;"'
8.t -ia!l Jilrt oYt - ;h$Ji * 11f iY i.r..ga - yY\!-YVo :,.J-Sl r - vY\\"VVf :;--jl:
{-+r_J-"a!l
Tel.: 7213773 * Fax: 7273775 - P-O.Box: 't9967 - Al Ain - iUnited Arab Ernirates
!1i,
u t, flrs
IL rnarble wc:rks Direet i-'- r
14
15
i6 AlWaha
{=
L' AiQi:ds
18
.i-..;i,;itu;.rit;,,:,,
?* 2 viiias Ai iaisaiy rxarbis rryorks Drirr=ia Frivate
*'i-ff$,.,..
"f*^ffi
.','8;tr4e61ew"
2t Mr. Marzuoki Sharnsi villa marble works Private Private
Above is indication Proiect of our work, but so manv other Proiects not reffered due to space
With regards
AL QUDS Natural
TENDER SPECIFICATION
PROPOSED COMMERCIAL DEVELOPMENT
For Mr. Noorulla Mohammed Ali Al Khaja ABU
DHABI – SECTOR E-41/1 PLOT No.54
All surfaces to be plastered or rendered are to be sprayed with water, which is to
be allowed to dry out before a key coat of cement slurry is applied.
On vertical faces the plaster shall be applied in widths not exceeding one meter between screed laths prepared
and set up true and plump.
All undercoats are to be scratched to form an adequate key for the next coat. The setting coat is not to be
applied until the floating coat has been left in a moist condition for at least three days.
Plasterwork is to be finished with a smooth, trowelled face, free from blemishes and fit to receive decoration.
Render is to be finished with a wood flat. Any blown, cracked or otherwise damaged plaster or render will be
condemned by the Architect and is to be hacked off and made good with quick setting plaster at the
Contractor‘s expense.
Full use is to be made of grounds, rules and angles trowels to ensure that all faces finish plane and true to line in
all directions and that all angles are straight, true and plumb.
The plastering of each face between two corners shall be carried out in one operation and work must in no case
be interrupted and continued the following day. All reveals for jambs, lintels shall be plastered in one operation
with the respective wall faces.
External angles of plastered walls shall be protected with galvanized mild steel angle beads complying with BS
1246 Fig. 7, Profile C3.
They shall be securely plugged, nailed or stapled as required at intervals not exceeding 18‖ ( 450 mm ) at both
edges.
Work to include as well, supply and fixing of galvanized mild steel plaster stops to finish the plaster at meeting
with skirting leaving 10 mm joint groove.
8.19 External Plastering
In general, external plastering shall be executed as described for internal plastering above except where
Tyrolean render is shown which shall be applied to the Architect‘s approval.
Tyrolean finish on plastered surfaces externally as noted shall be applied with an approved machine in not less
than two coats to a minimum of 6 mm finished thickness. The surface finish is to be either ‗ rough textured‘ or
pressed ‗ and the render is to be cured after application of the second coat.
8.20 Beds for Pavings
Beds for paving shall be composed of 1 part of cement and 4 parts of sand by volume.
8.21 Cement Sand Screed
Cement and Sand Screed shall be mixed by machine 350 Kg of cement to one cubic meter of dry sand. Cement
and sand screed used as paving shall be treated or mixed with a floor hardner.
All tools, vessels and surfaces shall at all times be kept scrupulously clean and precautions shall be taken to
prevent the screed or other materials from being contaminated by pieces of partially set material which would
tend to retard or accelerate the setting time.
Final difference in levels in each one zone in the building shall not exceed 2 mm, otherwise the Contractor shall
be required to apply suitable self levelling screed to finish the surface.
Where beds are to be laid direct on to a concrete sub-floor that has set, the surface of the sub-floor is to be
thoroughly cleaned and prepared to ensure a good bond with the surface being chipped with a pick if necessary,
brushed well and washed out to remove all dust and dirt and thoroughly soaked with water left on overnight.
Surplus water is to be mopped up and immediately prior to laying the bed, the sub-floor is to be coated with a
grout of neat cement wash well brushed on as the work proceeds. The grout must not be permitted to set before
the bed is laid.
The beds are to be protected from excessively rapid drying out by means of tarpaulins or polythene sheeting for
a minimum of 7 days after laying.
8.22 Marble and Granite Work
Marble or Granite slabs and skirtings, shall be uniform in color and texture, free from earth, veins and
lamination or structural weakness and of an approved color. The pattern dimensions and thickness of slabs shall
51 PARTICULAR SPECIFICATIONS
PROPOSED COMMERCIAL DEVELOPMENT
For Mr. Noorulla Mohammed Ali Al Khaja ABU
DHABI – SECTOR E-41/1 PLOT No.54
be as shown on the drawings. Samples of Marble or Granite slabs shall be
submitted to the Architect for approval prior to order.
The Contractor is to ensure that all marble and granite delivered to site is stored on a raised platform in a water
free area and is protected with suitable sheeting. Any chipped or stained pieces are to be removed from site and
replaced at the Contractor‘s expense.
Marble or Granite for use as a cladding is first to be shown on working drawings submitted by the Supplier for
the Architect‘s approval. These drawings are to detail the key number of each slab together with details of
anchorages, and no Marble or Granite is to worked until these drawings are approved.
The Contractor is to supply all necessary stainless steel fixings, dowels and continuous stainless steel supports
at the base of wall linings are required, and all in accordance with CP 298. All fixings are to be concealed when
the work is complete.
All external angles are to be rebated jointed.
The Contractor is to use the following table as a guide to the minimum number of anchors required to support
each slab :