HPC Calculation Sheet
HPC Calculation Sheet
HPC Calculation Sheet
Hydraulic Calculation
1 Chainage 0+917
2 Description of Catchment 0.08 sq. km.
3 Pipe Diameter Proposed 1 0 M.
1.0 M
Procedure Adopted
1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19 where
C= 14
the annual rain fall is more than 120 cm.)
M= 0.08 sq.km. (The area of catchment in sq.km)
3
Q = 2.11 m /s
3
Max Discharge 2.11 M /sec (Adopt the Max. value of discharge from above two method)
3
Max discharge passing through pipe = 3.2X0.7853= 2.51 M /Sec
Hydraulic Calculation
1 Chainage 1+950
2 Description of Catchment 0.075 sq. km.
3 Pipe Diameter Proposed 1.0 M.
Procedure Adopted
1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19 where
C= 14
the annual rain fall is more than 120 cm.)
M= 0.075 sq.km. (The area of catchment in sq.km)
3
Q = 2.01 m /s
3
Max Discharge 2.01 M /sec (Adopt the Max. value of discharge from above two method)
3
Max discharge passing through pipe = 3.0X0.7853= 2.35 M /Sec
Hydraulic Calculation
1 Chainage 2+2250
2 Description of Catchment 0.085 sq. km.
3 Pipe Diameter Proposed 1.0 M.
Procedure Adopted
1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19
C= 14
where the annual rain fall is more than 120 cm.)
M= 0.085 sq.km. (The area of catchment in sq.km)
3
Q = 2.20 m /s
Max Discharge 2.20 M3/sec (Adopt the Max. value of discharge from above two method)
3
Max discharge passing through pipe = 3.3X0.7853= 2.60 M /Sec
Hydraulic Calculation
1 Chainage 4+150
2 Description of Catchment 0.087 sq. km.
3 Pipe Diameter Proposed 1.0 M.
Procedure Adopted
1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19 where
C= 14
the annual rain fall is more than 120 cm.)
M= 0.087 sq.km. (The area of catchment in sq.km)
3
Q = 2.24 m /s
3
Max Discharge 2.24 M /sec (Adopt the Max. value of discharge from above two method)
3
Max discharge passing through pipe = 3.5X0.7853= 2.74 M /Sec