The document provides calculations to determine the quantity of cement grout required to fill the annular space between borehole and casing for a borehole that is 17 inches in diameter, has a 10 inch casing, and is grouted to a depth of 10 meters. It calculates the net volume of the annular space as 0.958 cubic meters and determines that 38 bags of commercially available Portland cement weighing 40 kg each are needed to fill this volume and allow for a 5% wastage factor.
The document provides calculations to determine the quantity of cement grout required to fill the annular space between borehole and casing for a borehole that is 17 inches in diameter, has a 10 inch casing, and is grouted to a depth of 10 meters. It calculates the net volume of the annular space as 0.958 cubic meters and determines that 38 bags of commercially available Portland cement weighing 40 kg each are needed to fill this volume and allow for a 5% wastage factor.
The document provides calculations to determine the quantity of cement grout required to fill the annular space between borehole and casing for a borehole that is 17 inches in diameter, has a 10 inch casing, and is grouted to a depth of 10 meters. It calculates the net volume of the annular space as 0.958 cubic meters and determines that 38 bags of commercially available Portland cement weighing 40 kg each are needed to fill this volume and allow for a 5% wastage factor.
The document provides calculations to determine the quantity of cement grout required to fill the annular space between borehole and casing for a borehole that is 17 inches in diameter, has a 10 inch casing, and is grouted to a depth of 10 meters. It calculates the net volume of the annular space as 0.958 cubic meters and determines that 38 bags of commercially available Portland cement weighing 40 kg each are needed to fill this volume and allow for a 5% wastage factor.