NCR STATUS (Package 1 & II) : Upto February-2020 Package - I
NCR STATUS (Package 1 & II) : Upto February-2020 Package - I
NCR STATUS (Package 1 & II) : Upto February-2020 Package - I
Upto February-2020
PACKAGE - I
Responsible
Date of Issue Responsible person / NCR Status (Open/ Date of Closure of Deatails of closure of NCR
S.No. NCR No. NCR issued vide Letter No. Details of NCR person (IE
of NCR closed by Closed) NCR (mention Letter No.)
Representative)
Reinforcement Steel of Box Culvert in
deep water since last one month which
Structure Engineer-Mr. C.Venkateswara ABL/NHAI/TOT-01/PKG-
1 STR/01 AA/TL/TOT/SGTPL/19-20/126 9/14/2019 results in rusting of steel and Closed 9/23/2019
Ravi Teja Rao 1/PL/2019-20/1195
deterioration -Box Culvert @Ch.
986+090 BHS
Structure Engineer-Mr.
4 ATMS/06 AA/TL/TOT/SGTPL/19-20/281 2/14/2020 VMS- Full Gantry Works HM cum RE, TL Open
Ravi Teja
PACKAGE - II
VMS Full Gantry Works
1. Honey Combing Concrete Surface
observed on VMS Foundation Column
1st Lift due to improper vibration of
Structure Engineer-Mr.
5 ATMS-03 AA/TL/TOT/DSTPL/19-20/181 11/6/2019 concrete HM & RE Open
Ravi Teja
2. Slurry leakage observed on
shuttering joints
3. Concrete corner edge joints are not
satisfactory