Forwarding of Time Extension and Aip (CA NO. CE (P) BRAHMANK-06 OF 2014-15)
Forwarding of Time Extension and Aip (CA NO. CE (P) BRAHMANK-06 OF 2014-15)
Forwarding of Time Extension and Aip (CA NO. CE (P) BRAHMANK-06 OF 2014-15)
Pin 931448
C/O 99 APO
No. 8050/ /E8 Jun 2021
2. Time extension alongwith AIP in triplicate is forwarded herewith for further necessarry action
please.
( SK Singh)
EE (Civil)
Encl :- Sheets OC Contract
2. Time extension alongwith AIP in triplicate is forwarded herewith for further necessarry action
please.
( SK Singh)
EE (Civil)
Encl :- Sheets OC Contract
EXTENSION OF TIME
Name of work DESIGN & CONSTRUCTION OF 100 MTR SPAN MAJ PMT BRIDGE WITH STEEL SUPER STRUCTURE (DECK TYPE) ON OPEN FOUNDATION OVER SIYOM NALLAH AT KM 27.520 ON ROAD ALONG –
YINGKIONG UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH : CA No. CE(P)/BRAHMANK/03/2016-17
S/No Contractor letter No Period asked by the contractor Period Recommended Remarks of the Engr-in- Recommendation of the OC Recommendation of the Decision of Accepting Officer
charge (Parawise Contract Commander
From To Days From To Days comments w.r.t.
Contractors letter &
Recmmendation)
1 Reference Contractor Letter No. VECPL/BRAHMANK/SIYOM/92 dated 20 Mar 2021 & Phase I Resons given by contractor " I partially agreed with the
VECPL/BRAHMANK/SIYOM/94 dated 25 May 2021. are of usual nature and recommendation of Engineer-In-
prevails in this locality Charge and recommend time
(a) Delay on account of Approval of Super structure Design/Drawings 1-Apr-21 31-Mar-22 365 1-Apr-21 31-Mar-22 365
extension for Phase-I (100% Qty) for
(a) Agreed 365 days only i.e. upto & including
(b) Delay on account of approval of Sub -structure Design/Drawing
(b) Agreed 31 Mar 22.
(c) Partially agreed
(c) Delay due to incorrect data provided in tender drawing that of actual/ground profile at site
(d) Not Agreed
(e) Partially Agreed
(d) Delay on account of profile verification at site
(f) Partially Agreed
(g) Agreed
(e) Procedural delay for issuance of various approvals/amendments
(h) Not agreed (SKSIngh)
(j) Not agreed EE(Civ)
(f) Non-inclusion of Schedule-B (Blasting materials) in CA documents
(k) Agreed OC Contract
(l) Not agreed.
(g) Delay on account of drilling and blasting at site
(m) Agreed.
(n) Agreed.
(h) Delay due to change in deck and foundation level and approval of bearing capacity (SBC)
RECOMMENDATION
The reasons put forth by the
(j) Delay on account of fabricated 100 mtr steel components had to be unload at Shiku bridge (i.e. 80
contractor are reasonable
Km away from Siyom Bridge) due to less space at Siyom bridge
and time extension for
(k) Delay in shifting of the materials from Shiku bridge to Siyom bridge site since 100 mtr span Phase-I (100% Qty) 365
structure are very long and voluminous in size. Further, these materials had to be transported back to days only i.e. upto &
the site in small vehicle which involved additional cost to the projects including 31 Mar 22 is
recommended .
(l) Delay in payments
REPORT FOR GRANT OF EXTENSION OF TIME EXCEEDING 25 % OR THE ORIGINAL CONTRACT PERIOD OF
EXCEEDING 3/9 MONTHS WHICHEVER IS MORE
(b) Name of Work : DESIGN & CONSTRUCTION OF 100 MTR SPAN MAJ
PMT BRIDGE WITH STEEL SUPER STRUCTURE (DECK
TYPE) ON OPEN FOUNDATION OVER SIYOM NALLAH
AT KM 27.520 ON ROAD ALONG – YINGKIONG UNDER
PROJECT BRAHMANK IN ARUNACHAL PRADESH : CA
No. CE(P)/BRAHMANK/03/2016-17
(k) Reason/ cause for (h) : (a) Delay on account of Approval of Super structure
Design/Drawings
: (b) Delay on account of approval of Sub -structure
Design/Drawing
SR NO DESCRIPTION REMARKS
DESIGN & CONSTRUCTION OF 100 MTR SPAN MAJ PMT BRIDGE WITH STEEL SUPER
STRUCTURE (DECK TYPE) ON OPEN FOUNDATION OVER SIYOM NALLAH AT KM 27.520
1
ON ROAD ALONG – YINGKIONG UNDER PROJECT BRAHMANK IN ARUNACHAL
PRADESH : CA No. CE(P)/BRAHMANK/03/2016-17
2 CA No CE(P)/BRAHMANK/03/2016-17
3 CA Amount Rs-8,70,00,000.00
DO No 2 Dated 10 Feb
4 Amended CA Amount 575000
2018
5 Date Of Acceptance 30-Apr-16
6 Date of Commencement (As per WO) 19-May-16
Weather enclosed
Documents required
Yes/NO
19 Delay report NA
Revised Time & Progress Chart duly counter signed by OC Contract
20 YES
& Commander Contract
(SK Singh)
EE (Civil)
OC Contract