Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

K58L XRZ: Truck-Mounted Concrete Boom Pump

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

K58L XRZ TRUCK-MOUNTED CONCRETE

Placing boom
BOOM PUMP
B5RZ 58/54
Pumping unit PA 1506/909 F8
HPG 1808/1113 IF9
Driven by PTO
Chassis 5 axles

Dimensions
max 4000
1450

6100
14080

Dimensions varying according to truck assembly

12025
11955
11005
K58L XRZ TRUCK-MOUNTED CONCRETE

Placing boom
BOOM PUMP
B5RZ 58/54
Pumping unit PA 1506/909 F8
HPG 1808/1113 IF9
Main features Driven by PTO
• Assembly on standard 5 axles Chassis 5 axles
• Self-supporting frame, torsion free, FEM designed
• Placing boom B5RZ 58/54, 6 sections, pipeline diameter 125 mm,
“RZ” folding system
• Fully hydraulic outrigger controls on both sides of the truck Pumping unit technical data
• Front “X style” diagonal outriggers with sequence controlled triple
patented telescopic opening and swing-out rear outriggers for a quick PA 1506/909 HPG 1808/1113
Model
and easy set-up F8 IF9
• “Load Sensing” proportional boom control
• The “BFC” Best-Flex Cifa supporting system allowing just one man Max. theorical output m3/h 150/90 179/105
to change delivery pipeline easily, quickly and safely
• Concrete flow rate regulator Max. pressure on concrete bar 53/95 76/130
• Safety device on opening inspection hatch
• HPG-IF pumping unit with closed circuit and reversal flow: superb Max. numbers nr. 30/17 36/21
performances, high pressures and output, high reliability and easy of cycles per min.
and reduced maintenance; 9 inches S valve
Concrete cylinders
alternatively mm 230x2000 230x2000
(diam. x stroke)
“F8” pumping unit with open circuit: smooth, continuous and easy
pumping, combined with high reliability Concrete hopper capacity l 550 650

Standard equipment Hydraulic circuit open closed

• 2 Proportional radio control with two boom movement speed,


synthesizer for automatic frequency search, 8 position joy stick and Placing boom technical data
concrete flow rate regulator. 20 mt cable
• Electronic stability control and data logger Model B5RZ 58/54
• Emergency control pad for pumping unit HPG 1808/1113 IF9
• Remote controlled electric vibrator placed on the concrete hopper grid Pipeline diameter mm 125
• Centralized lubrication system for pumping unit
• Automatic oil lubrication system for pumping pistons on Max. vertical reach m 57,1
HPG 1808/1113 IF9
• Additional manual lubrication system for pumping unit Max. horizontal distance
• Hard plastic outrigger support plates with relative housing (from center of slewing axis) m 52,8
• Rear light on hopper and stabilization area
• Level readers for stabilization control Min. unfolding height 14
• Accessories for cleaning and pipe washing
• Double thickness concrete pipes, in high resistant steel Section numbers 6
• Aluminiun concrete pipeline joints
• Rear camera for facilitate manoeuvre 1st section opening angle 90°

Optional 2nd section opening angle 180°


• High pressure water pump
• Air compressor for pipeline cleaning 3rd section opening angle 180°
• Centralized lubrication system for placing boom
• Air pipeline for placing boom 4th section opening angle 254°
• Aluminium hopper covering
• Separated emergency engine kit for independent control of the hopper 5th section opening angle 210°
mixer, concrete pumping unit, boom and water pump

6th section opening angle 90°

Rotating angle 370°

End hose length m 3

Technical data and characteristics subject to modifications without notice


K58L_ENG_0908

CIFA S.p.A.
via Stati Uniti d’America, 26
20030 Senago (Milano) - Italia
tel.: +39.02.990131 - fax: +39.02.9981157
www.cifa.com

You might also like