Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

010-019 Air Crossover: Install

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Air Crossover Page 1 of 1

010-019 Air Crossover

Install

Install the crossover


tube and clamps in
the reverse order of
removal.

Tighten the clamps.

Torque
Value: 8 n.m [71 in-
lb]

Last Modified: 31-Mar-2006

Copyright © 2000-2010 Cummins Inc. All rights reserved.

mk:@MSITStore:F:\MR_D.CHM::/english/procedures/40/40-010-019-shopas.html 04/06/2012

You might also like