Exercise No 1: Start The Network Connection Tool
Exercise No 1: Start The Network Connection Tool
Exercise No 1: Start The Network Connection Tool
Exercise No 1
Network setup
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Select Internet Protocol (TCP/IP) item and click Properties button
Select option button Use the following IP address and set the IP-address and subnet
mask for computer according to picture below.
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Make sure that you can “ping” the switch and the IED’s from the computer.
Exercise No 2
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
PCM600 configuration
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Insert a region. Right click at the top level and select New->General->Region. Rename
the item to SYRIA
Insert a substation. Right click at the region level and select New->General-
>Substation. Rename the item to ADRA.
Insert a voltage level. Right click at the substation level and select New->General-
>Voltage level. Rename the item to 230kV.
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Insert bay. Right click at the Voltage level and select New->General->Bay. Rename
the item to D01.
Insert the IED’s. Right click at Bay level E1 and select New-> Transmission IED-> REL670.
Set the parameters according to the picture below and click next button.
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Set the IP-address and click next button
Final structure. Make sure that your structure is identical as the picture below.
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Check the IP-addresses for the IED’s in the property list. Focus at IED level and select
Properties item.
Exercise No 3
PCM600 configuration, application configuration
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Select REL670 at D01 and right click. Start the application configuration tool.
ABB
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Exercise No 4
Signal Matrix
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Exercice No 5
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
Parameter Setting
The intention of this exercise is to download the Parameter Setting
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING
MATELEC - LEBANON
-----------------------------------------------------------------------------------------------------------------------------------------------------
SUBSTATION PROTECTION TRAINING