06 - Test Format For Insulation Resistance

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building - Abu Dhabi


International Airport
Test Procedure for Switchboards
Doc No: COM-0401-AN-PR-0006 Rev: 1 Checklist No: TR-ANEL-SW-PCT-02

INSULATION RESISTANCE TEST RECORD SHEET


Module Tag Ref.: EM-MDP-W2-L1.0-1

1. General Data & Information:

Sub-System: Switchboard Feeder Designation: EM-DP-W2-L1.0-1


Temperature: 36°C Manufacturer: Schneider Electric
Humidity: 49 % Type: Powerline
Equipment Tested: EM-MDP-W2-L1.0-1 Serial No.: NA
Location / Level: PIER-4/L1.0 Rated Voltage: 400V
Room No.: 1682 Rated Current: 100A
nd
Switchgear: UPS-W2-L1.0-1 Date: 22 JUN 2016

2. Insulation Resistance Test:

Insulation
Applied DC Test Voltage Pass/
Resistance Remarks
Fail
1 kV for 1 min (GΩ)
R/Y+B+N+ framework. 10.9 Pass
Y/R+B+N+ framework. 10.2 Pass
B/R+Y+N+ framework. 12.3 Pass
N/R+Y+B+ framework. 28.7 Pass

Applied Voltage: 1 kV Acceptable Criteria: IR > 100 MΩ [ANSI/NETA ATS-2009 – Table 100.1]

3. Testing Equipment Details:

Type / Calibration Calibration


S. No. Equipment Name Make Serial No.
Model Date Certificate Ref.
1 MULTI METER FLUKE 87V 08.11.2016 84196 20660087
2 5KV IR Tester SONEL MIC-5010 22.02.2017 155042/16 B20235

Performed By: ALPHA POWER Witnessed By: ANEL Witnessed By: TCA-JV Approved By: AECOM
Name: JAYAPRAKASH Name: RAMKUMAR Name: A.KARA KAYA Name:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date:


COM-0401-AN-PR-0006