SPG 1057 Audio Frequency Jointless Track Circuits For Main Line Applications
SPG 1057 Audio Frequency Jointless Track Circuits For Main Line Applications
SPG 1057 Audio Frequency Jointless Track Circuits For Main Line Applications
Signals
Equipment Specification
Engineering Specification
SPG 1057
Disclaimer
This document was prepared for use on the RailCorp Network only.
RailCorp makes no warranties, express or implied, that compliance with the contents of this document shall be
sufficient to ensure safe systems or work or operation. It is the document user’s sole responsibility to ensure that the
copy of the document it is viewing is the current version of the document as in use by RailCorp.
RailCorp accepts no liability whatsoever in relation to the use of this document by any party, and RailCorp excludes
any liability which arises in any manner by the use of this document.
Copyright
The information in this document is protected by Copyright and no part of this document may be reproduced,
altered, stored or transmitted by any person without the prior consent of RailCorp.
Document control
Version Date Summary of change
Replaced SC 07 44 00 00 SP Audio Frequency Jointless Track
1.0 September 2009
Circuits for Main Line Applications
4. Appendix 2 deleted and ref to Std Ccts SDG001; 4.2 deleted;
1.1 20 October 2009
appendix 2 deleted
1.2 May 2010 Application of TMA 400 format
© RailCorp Page 2 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
Contents
© RailCorp Page 3 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
8 Provision of Information.......................................................................................................11
8.1.1 Type-approved Equipment.......................................................................11
8.1.2 New non-type-approved Equipment.........................................................11
8.1.3 Equipment substantially of type-approved items .....................................11
8.2 Test Certificates.......................................................................................................11
8.3 Design Changes ......................................................................................................11
Appendix A Schedule of Information to be Provided with Quotation .................................. 13
© RailCorp Page 4 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
Where the equipment is offered in a form which has previously been granted type
approval, only the Information Schedule (First part of Appendix 1) has to be completed by
the Supplier. Where no type approval has been received, or the equipment differs in any
detail from similar type approved equipment, then all of the requirements of Appendix 1
must be complied with by the Supplier.
Australian Standards relating to any component, system or method of testing are deemed
applicable to and form part of this Specification. However, where conflicts exist, this
Specification shall take precedence over either.
RailCorp –
2 Performance Requirements
The equipment shall meet the following minimum performance requirements.
The frequencies currently used and preferred by RailCorp are 1700, 2000, 2300 and
2600 Hz (nominal frequencies).
© RailCorp Page 5 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
The arrangements and equipment layout used must be such that similar frequency
interference at any receiver is no more than 10% of the input level sufficient to produce
energisation of the receiver when set at maximum gain.
Require no restriction on the number and type of units sharing any one power supply unit,
other than that dictated by the total load rating of the unit.
Provide plug-in modules with coding to prevent insertion of any unit of incorrect frequency
or type.
© RailCorp Page 6 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
2.9 Adjustment
Provide for simple measurement and setting of correct operating levels, and subsequent
adjustments. A single voltage or current value at the receiver input must be established
as the track circuit adjustment criterion.
3 Operating Environment
The track circuits will be required to operate reliably in the following operating
environment:
c) No electric traction
© RailCorp Page 7 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
In DC traction areas, tie-ins are provided at intervals of between 1000 and 1600 metres
(with no more than one tie-in per track circuit). Currently this is done using Westinghouse
MJS or similar bonds, or with CIT1400 CT1 bonds used either unresonated or resonated,
depending on the length of track circuit.
For AC traction, tie-ins are provided at 600 metre intervals, between the neutral points of
air-cored inductors in each tuned loop, and to a continuous 70mmsq bare copper buried
earth wire.
Provision must be made for the existence of such rail connections, and the equipment
must continue to detect trains satisfactorily.
© RailCorp Page 8 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
3.3 Environmental
3.3.1 Temperature
The equipment will be required to operate reliably with ambient free-air shade
temperatures between 10C and 45C, and equipment housing temperatures exceeding
70C.
3.3.2 Humidity
Relative humidity ranges from 20% to 100% condensing.
3.3.3 Rainfall
Average annual rainfall ranges up to 1500 mm per annum, with peak rainfall up to
200mm per hour recorded.
3.3.4 Lightning
Much of the installation area for these tracks experiences lightning activity which is
severe in both strike intensity and frequency. RailCorp standards for lightning protection
of signalling equipment are detailed in Specification SPG 0712. The particular
arrangement applicable to this type of equipment is that shown in Section 5 of that
specification.
3.3.5 Insolation
Maximum solar radiation expected is 10.5 watts per sq metre of surface. It should be
assumed that all of the incident heat will be absorbed, as outdoor equipment will not
necessarily be kept painted or free of airborne industrial fallout.
Trackside equipment shall be provided with lockable metal housings, either integral or
external to the main unit, to provide protection against vandal attack. The tuning of units
shall not be subject to deterioration due to the use of such housings.
All trackside unit housings shall be suitable for securing with the standard padlock. This
lock has a bow of 6 mm dia cross-section, with a maximum bow-to-body clearance of 20
mm.
Typical circuits, showing the application of each technique to conventional track circuits,
are provided in the Standard Signalling Circuits SDG001.
© RailCorp Page 9 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
4.2 Deleted
5 Installation Requirements
The standard arrangements for connection of trackside units to rail are shown in RailCorp
Drawing CO7980/2, in Appendix 2. This arrangement will apply equally to all new
equipment.
6 Warranty
The Supplier shall provide a warranty on all items of equipment supplied, for a period not
less than that specified below.
© RailCorp Page 10 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
Units installed as part of contract works may be packaged in whatever way is required by
the installation Contractor. Units provided as spares under an installation contract shall
be supplied individually packaged, the same as supply-only items.
8 Provision of Information
© RailCorp Page 11 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
provide to RailCorp a brief notification of the design change, describing the nature of the
change and the reasons for its implementation.
© RailCorp Page 12 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
Information Schedule
date .........................
date .........................
Modulation
Type .........................
© RailCorp Page 13 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
Rate .........................
Tx to trackside
Rx to trackside
Transmitter output
voltage .........................
Receiver input
Voltage .........................
© RailCorp Page 14 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
current .........................
Receiver output
voltage .........................
current .........................
current .........................
5 Packaging
Supply Details
7 Manufacturer
Name .........................
Address .........................
Telephone .........................
© RailCorp Page 15 of 16
Issued May 2010 UNCONTROLLED WHEN PRINTED Version 1.2
RailCorp Engineering Specification — Signals — Equipment Specification
Audio Frequency Jointless Track Circuits for Main Line Applications SPG 1057
8 Supplier
Name .........................
Address .........................
Telephone .........................
© RailCorp Page 16 of 16