05CREW Coal Gas
05CREW Coal Gas
05CREW Coal Gas
Update
Jason Crew, General Manager
GE Gasification
Gasification Technologies Conference
October 10, 2011
GE ... Imagination At Work
2
Installed fleet by the numbers
145
85
25
15
3
Installed fleet by the numbers
GE has 145 gasifiers in
commercial operation … the
largest fleet in the industry … with
85 additional gasifiers in design,
engineering, or construction at 25
plants … and a global presence in
15 different countries.
4
Installed fleet by the numbers
GE has 145 gasifiers in
commercial operation … the
largest fleet in the industry … with
85 additional gasifiers in design,
engineering, or construction at 25
plants … and a global presence in
15 different countries.
5
Installed fleet by the numbers
GE has 145 gasifiers in
commercial operation … the
largest fleet in the industry … with
85 additional gasifiers in design,
engineering, or construction at 25
plants … and a global presence in
15 different countries.
6
China Licensed Fleet Update
Licensed fleet growth in China since 2010
8
Licensed fleet growth in China since 2010
Methanol & Derivatives
Shenhua Baotou
Coal Coke Oil 1.8MTPY MeOH, 2010 Start-up
5+2 900ft3 gasifiers
In Operation
In Design/Construction
9
Shenhua Baotou
10
Licensed fleet growth in China since 2010
Methanol & Derivatives
In Operation
In Design/Construction
11
Licensed fleet growth in China since 2010
Methanol & Derivatives
In Operation
In Design/Construction
12
Licensed fleet growth in China since 2010
Methanol & Derivatives
In Operation
In Design/Construction
13
Licensed fleet growth in China since 2010
Methanol & Derivatives
In Operation
In Design/Construction
14
Factors driving China growth
• Low cost, flexible, highly
reliable technology
• Proven at scale & pressure
• Credible technology
introduction process
• Strong DI relationships
• Highly localized hardware
• Broad installed base with
capable operators
• Short build cycle – 36 mo …
contract to first-fire
15
Technology Highlight: High Pressure
IGCC: GE’s HP Quench Gasification Technology:
• Pressures up to 87 bar
• Advanced Refractory*
• 5 – 10% reduction in MeOH cost
• Operator Training Simulator Syngas compression Aux Loads, MP, LP Steam for shift / AGR
• Mark VIe Controls • 5% reduction in coal to MeOH capex
• 7F Syngas Turbine Number of trains
• HFO, Vac Resid, NG, and coal experience
• High Conversion Feed Injector*
• Radiant Syngas Cooler Gasification Shift / Cooling Acid Gas
• Carbon Island - EOR Removal
AGR
Industrial:
• Advanced Gasifier Configuration Tools MeOH
• Large Quench with High Pressure (HP)
Syngas
• Raw gas Turboexpander Compressor MeOH Synthesis
*Available in both IGCC & Industrial applications
GE-Shenhua Gasification JV
• 50-50 gasification licensing in China
• GE technology + Shenhua project &
market expertise
• Commercial platform for Industrial
licensing + IGCC advocacy
17
Duke Edwardsport IGCC Update
Duke Edwardsport IGCC project
GE’s commercial launch world’s largest IGCC project
Duke Energy Indiana
• 618MW IGCC
• 2012 COD
20
GE Title or job number
10/12/2011
April 2010
21
GE Title or job number
10/12/2011
January 2011
22
GE Title or job number
10/12/2011
September 2011
NOX, SOX, PM, Hg
Mark VIe
Advanced Refractory
Low Emissions
Carbon Capture Ready
7F Syngas Turbine 23
GE Title or job number
10/12/2011