Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Uniclass 2015 April 2020 Update

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 48

Table Version Current code Current classification

En v1.16

SL v1.15

Ss v1.18 Ss_15_10_30 Excavating and filling systems

Ss v1.18 Ss_15_10_80_33 Erosion control systems

Ss v1.18 Ss_15_30_50_11 Cavity wall insulation systems

Ss v1.18

Ss v1.18 Ss_20_60_35_10 Caged rock unit (gabion)retaining wall systems

Ss v1.18 Ss_25_13_30

Ss v1.18

Ss v1.18 Ss_25_16_30

Ss v1.18

Ss v1.18 Ss_25_20_68 Profiled sheet cladding systems

Ss v1.18 Ss_25_20_68_30 Fibre cement profiled sheet cladding systems

Ss v1.18 Ss_25_20_68_50 Metal profiled sheet cladding systems

Ss v1.18 Ss_25_20_68_65 Plastics profiled sheet cladding systems

Ss v1.18 Ss_25_45_02_60

Ss v1.18 Ss_25_45_72 Rendered insulation systems

Ss v1.18

Ss v1.18 Ss_25_15_60_05 Balustrade and guarding systems

Ss v1.18 Ss_25_15_60_35 Handrail systems

Ss v1.18 Ss_30_20_15

Ss v1.18 Ss_30_30 Roof opening systems

Ss v1.18 Ss_30_30_15 Concrete roof glazing systems

Ss v1.18 Ss_30_30_15_42 In situ concrete roof glazing systems

Ss v1.18 Ss_30_30_15_64 Precast concrete lift-out access roof glazing systems

Ss v1.18 Ss_30_30_15_65 Precast concrete roof glazing systems

Ss v1.18 Ss_30_32
Ss v1.18 Ss_30_32_15

Ss v1.18 Ss_30_32_15_42

Ss v1.18 Ss_30_32_15_64

Ss v1.18 Ss_30_32_15_65

Ss v1.18 Ss_30_32_30

Ss v1.18 Ss_30_40_50_10 Aluminium sheet roof covering systems

Ss v1.18 Ss_30_40_50_13 Carbon steel sheet roof covering systems

Ss v1.18 Ss_30_40_50_20 Copper sheet roof covering systems

Ss v1.18 Ss_30_40_50_45 Lead sheet roof covering systems

Ss v1.18 Ss_30_40_50_80 Stainless steel sheet roof covering systems

Ss v1.18 Ss_30_40_50_95 Zinc sheet roof covering systems

Ss v1.18 Ss_30_40_65 Profiled sheet roof covering systems

Ss v1.18 Ss_30_40_65_30 Fibre cement profiled sheet roof covering systems

Ss v1.18 Ss_30_40_65_50 Metal profiled sheet roof covering systems

Ss v1.18 Ss_30_40_65_60 Plastics profiled sheet roof covering systems

Ss v1.18 Ss_32_80_03_40 Interstitial grouting systems

Ss v1.18 Ss_32_80_79_35 Ground-supported water retention sheet-lining systems

Ss v1.18 Ss_32_80_79_85 Structure-supported water retention sheet-lining systems

Ss v1.18

Ss v1.18 Ss_40_15_75_76 Sauna package systems

Ss v1.18 Ss_40_15_75_92 Urinal systems

Ss v1.18 Ss_40_15_75_94 Washbasin systems

Ss v1.18 Ss_40_15_75_96 Wash fountain systems

Ss v1.18 Ss_40_15_75_98 Wash trough systems

Ss v1.18 Ss_40_15_90

Ss v1.18 Ss_40_15_90_05 Accessible WC package systems

Ss v1.18 Ss_40_15_90_85 Squatting WC systems

Ss v1.18 Ss_40_15_90_95 Waterless toilet systems

Ss v1.18 Ss_40_15_90_96 WC and washbasin combination systems


Ss v1.18 Ss_40_15_90_97 WC systems

Ss v1.18 Ss_40_15_90_98 WC wash and dry combination systems

Ss v1.18

Ss v1.18 Ss_45_60 Avian fauna systems

Ss v1.18 Ss_45_65 Insectile fauna systems

Ss v1.18 Ss_45_70 Mammalian fauna systems

Ss v1.18 Ss_45_70_05 Animal conservation systems

Ss v1.18 Ss_45_70_05_27 Animal road crossing systems

Ss v1.18 Ss_45_70_05_29 Animal species introduction systems

Ss v1.18 Ss_45_70_05_30 Animal species protection systems

Ss v1.18

Ss v1.18

Ss v1.18 Ss_45_80 Reptilian fauna systems

Ss v1.18 Ss_50_30 Building and land drainage collection systems

Ss v1.18 Ss_50_30_06 Below-ground inspection systems

Ss v1.18 Ss_50_30_06_06 Brick manhole systems

Ss v1.18 Ss_50_30_06_08 Brick shallow inspection chamber systems

Ss v1.18 Ss_50_30_06_10 Brick shallow silt trap and flow control chamber systems

Ss v1.18 Ss_50_30_06_12 Concrete deep manhole systems

Ss v1.18 Ss_50_30_06_14 Concrete manhole systems

Ss v1.18 Ss_50_30_06_16 Concrete shallow inspection chamber systems

Ss v1.18 Ss_50_30_06_18 Concrete silt trap and flow control chamber systems

Ss v1.18 Ss_50_30_06_62 Plastics deep non-entry inspection chamber systems

Ss v1.18 Ss_50_30_06_64 Plastics distribution and sampling chamber systems

Ss v1.18 Ss_50_30_06_66 Plastics shallow inspection chamber systems

Ss v1.18 Ss_50_30_08 Below-ground gravity drainage systems

Ss v1.18 Ss_50_30_08_15 Combined below-ground drainage pipeline systems

Ss v1.18 Ss_50_30_08_16 Combined sewer overflow systems

Ss v1.18 Ss_50_30_08_30 Foul wastewater below-ground drainage pipeline systems


Ss v1.18 Ss_50_30_08_85 Surface water below-ground drainage pipeline systems

Ss v1.18 Ss_50_30_10 Below-ground pumped drainage systems

Ss v1.18 Ss_50_30_10_06 Below-ground private packaged pumping station and pres

Ss v1.18 Ss_50_30_45 Land drainage systems

Ss v1.18 Ss_50_30_45_08 Blanket drain land drainage systems

Ss v1.18 Ss_50_30_45_20 Culvert land drainage systems

Ss v1.18 Ss_50_30_45_30 Filter drain land drainage systems

Ss v1.18 Ss_50_30_45_32 Fin drain piped land drainage systems

Ss v1.18 Ss_50_30_45_53 Mole or subsoiling drain land drainage systems

Ss v1.18 Ss_50_30_45_55 Narrow slot fin drain land drainage systems

Ss v1.18 Ss_50_30_45_75 Slitting or grooving land drainage systems

Ss v1.18 Ss_50_30_45_85 Subsoil drainage pipe drain systems

Ss v1.18 Ss_50_30_45_90 Trenchless drain land drainage systems

Ss v1.18 Ss_50_35 Utility surface and waste water drainage collection systems

Ss v1.18

Ss v1.18 Ss_60_40_15_90 Combined underfloor heating and cooling systems

Ss v1.18 Ss_60_40_17_71 Refrigerant cooling systems

Ss v1.18 Ss_60_40_17_92 Underfloor chilled water systems

Ss v1.18 Ss_60_40_17_94 Variable refrigerant flow systems

Ss v1.18 Ss_60_40_37_27 Electric underfloor heating systems

Ss v1.18 Ss_60_40_37_48 Low temperature hot water heating systems

Ss v1.18 Ss_60_40_37_28 Electrical resistance trace heating systems

Ss v1.18 Ss_60_40_37_94 Underfloor low-temperature hot water heating systems

Ss v1.18

Ss v1.18

Ss v1.18

Ss v1.18

Ss v1.18

Ss v1.18
Ss v1.18

Ss v1.18

Ss v1.18

Ss v1.18 Ss_75_30_35 Highway signal and control systems

Ss v1.18 Ss_75_30_35_52

Ss v1.18

Ss v1.18

Ss v1.18 Ss_75_30_35_72 Road signal and control systems

Ss v1.18

Ss v1.18

Ss v1.18 Ss_75_70_35

Ss v1.18

Ss v1.18

Ss v1.18 Ss_75_70_72

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18
Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18 Pr_25_71_14_06 Aluminium composite panels

Pr v1.18 Pr_25_71_14_08 Aluminium infill panels

Pr v1.18 Pr_25_71_14_11 Carbon steel composite panels

Pr v1.18

Pr v1.18 Pr_25_71_14_13 Carbon steel infill panels

Pr v1.18 Pr_25_71_14_18 Composite and recycled plastics sheets

Pr v1.18 Pr_25_71_14_30 Fibre cement panels

Pr v1.18 Pr_25_71_14_34 Glass-reinforced plastics (GRP) panels

Pr v1.18

Pr v1.18 Pr_25_71_14_83 Stainless steel composite panels

Pr v1.18 Pr_25_71_14_85 Stainless steel infill panels

Pr v1.18

Pr v1.18

Pr v1.18 Pr_25_93_45_70 Road kerbs

Pr v1.18

Pr v1.18

Pr v1.18 Pr_25_96_35_31 Footway gratings

Pr v1.18 Pr_35_31_22_37 High-pigment waterborne paint

Pr v1.18 Pr_35_31_22_80 Solvent-borne gloss finishes

Pr v1.18 Pr_35_31_22_81 Solvent-borne masonry paints

Pr v1.18 Pr_35_31_22_82 Solvent-borne matt and flat finishes


Pr v1.18 Pr_35_31_22_83 Solvent-borne mid-sheen finishes

Pr v1.18

Pr v1.18 Pr_35_31_22_95 Waterborne gloss finishes

Pr v1.18 Pr_35_31_22_96 Waterborne masonry paints

Pr v1.18 Pr_35_31_22_97 Waterborne matt and flat finishes

Pr v1.18 Pr_35_31_22_98 Waterborne mid-sheen finishes

Pr v1.18

Pr v1.18 Pr_40_10_27 Electrical services signs

Pr v1.18 Pr_40_10_27_24 Electrical diagrams

Pr v1.18 Pr_40_10_27_27 Electrical shock treatment signs

Pr v1.18 Pr_40_10_27_28 Externally illuminated emergency exit signs

Pr v1.18 Pr_40_10_27_43 Induction loop system signs

Pr v1.18 Pr_40_10_27_62 Photoluminescent emergency signs

Pr v1.18 Pr_40_10_27_63 Photoluminescent low-mounted way-guidance lighti

Pr v1.18 Pr_40_10_27_86 Surveillance system signs

Pr v1.18 Pr_40_10_27_88 Telecommunications equipment and outlets labels

Pr v1.18 Pr_40_10_27_91 Underground cable marker tapes

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18 Pr_60 Services source products

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18 Pr_65 Services distribution products

Pr v1.18
Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18 Pr_70

Pr v1.18 Pr_70_75_52 Mesh network products

Pr v1.18 Pr_70_75_52_88 Tilt sensor nodes

Pr v1.18 Pr_75 Services control products

Pr v1.18

Pr v1.18 Pr_75_50_18 Controllers and control panels

Pr v1.18 Pr_75_50_18_02 Alarms

Pr v1.18 Pr_75_50_18_06 Automatic sprinkler electric pump control panels’

Pr v1.18 Pr_75_50_18_13 Chain actuators

Pr v1.18 Pr_75_50_18_15 Compressed air master controllers

Pr v1.18 Pr_75_50_18_21 Damper actuators

Pr v1.18 Pr_75_50_18_29 Field controllers

Pr v1.18 Pr_75_50_18_34 Gas dose regulators

Pr v1.18 Pr_75_50_18_46 Linear actuators

Pr v1.18

Pr v1.18 Pr_75_50_18_70 Programmers

Pr v1.18 Pr_75_50_18_94 Valve actuators

Pr v1.18 Pr_75_50_18_96 Water display controls

Pr v1.18 Pr_75_50_18_98 Water quality controllers


Pr v1.18 Pr_75_50_18_99 Wind operated water display control devices

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18

Pr v1.18 Pr_80 Services general products

Pr v1.18

PM v1.8

PM v1.8 PM_10_20_24 Employer's information requirement’

PM v1.8

PM v1.8 PM_30_30_45

PM v1.8 PM_30_30_78 Site waste management plan

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8
PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8 PM_40_30_26 Energy strategy

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.18

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8 PM_40_60_09 BIM maturity assessment report’

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8
PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8

PM v1.8
PM v1.8 PM_70_75_32

PM v1.8

PM v1.8

PM v1.8 PM_70_95_12

PM v1.8 PM_70_95_31

PM v1.8
New or updated code New or updated classification New

En_32_10_37 Hedges Y

SL_35_80_02 Adult changing rooms Y

Ss_15_10_30 Excavating, filling and erosion control systems

Ss_15_10_30_33 Erosion control systems

Ss_25_45_72_40 Injected or blown cavity wall insulation systems

Ss_20_05_80_80 Soil nailing cementitious grout systems Y

Ss_20_60_35_10 Caged fill retaining wall systems

Gabion wall systems

Ss_25_14_30_56 Natural stone fencing systems Y

Fish barrier systems

Ss_25_16_94_96 Vehicle security barrier systems Y

No change Profiled sheet self-supporting cladding systems

No change Fibre cement profiled sheet self-supporting cladding systems

No change Metal profiled sheet self-supporting cladding systems

No change Plastics profiled sheet self-supporting cladding systems

Ss_25_45_70_65 Parge coat systems

No change Wall insulation systems

Ss_25_60_05 Balustrade and handrail systems Y

Ss_25_60_05_05 Balustrade and guarding systems

Ss_25_60_05_35 Handrail systems

Construction site

No change Roof and floor opening systems

No change Concrete roof and floor glazing systems

No change In situ concrete roof and floor glazing systems

No change Precast concrete lift-out access roof and floor glazing systems

No change Precast concrete roof and floor glazing systems

Floor opening systems


Concrete roof and floor glazing systems

In situ concrete floor glazing systems

Precast concrete lift-out access floor glazing systems

Precast concrete floor glazing systems

Ss_30_30_30 Floor hatch systems

No change Aluminium sheet fully supported roof covering systems

No change Carbon steel sheet fully supported roof covering systems

No change Copper sheet fully supported roof covering systems

No change Lead sheet fully supported roof covering systems

No change Stainless steel sheet fully supported roof covering systems

No change Zinc sheet fully supported roof covering systems

No change Profiled sheet self-supporting roof covering systems

No change Fibre cement profiled sheet self-supporting roof covering systems

No change Metal profiled sheet self-supporting roof covering systems

No change Plastics profiled sheet self-supporting roof covering systems

Ss_20_05_80_40 Interstitial grouting systems

Ss_32_80_90_35 Ground-supported water retention sheet-lining systems

Ss_32_80_90_85 Structure-supported water retention sheet-lining systems

Ss_32_80_90 Water feature and pond sheet-lining systems Y

Ss_40_15_77_76 Sauna package systems

Ss_40_15_75_91 Urinal systems

Ss_40_15_75_92 Washbasin systems

Ss_40_15_75_93 Wash fountain systems

Ss_40_15_75_94 Wash trough systems

Toilet systems

Ss_40_15_75_02 Accessible WC package systems

Ss_40_15_75_83 Squatting WC systems

Ss_40_15_75_95 Waterless toilet systems

Ss_40_15_75_96 WC and washbasin combination systems


Ss_40_15_75_97 WC systems

Ss_40_15_75_98 WC wash and dry combination systems

Ss_45_55 Animal fauna systems Y

Ss_45_55_10 Avian fauna systems

Ss_45_55_40 Insectile fauna systems

Ss_45_55_50 Mammalian fauna systems

Ss_45_55_05 Animal conservation systems

Ss_45_55_05_27 Animal road crossing systems

Ss_45_55_05_29 Animal species introduction systems

Ss_45_55_05_30 Animal species protection systems

Ss_45_75_30_27 Eel pass systems Y

Ss_45_75_30_44 Lamprey pass systems Y

Ss_45_55_70 Reptilian fauna systems

No change Above-ground drainage collection systems

Ss_50_35_06 Below-ground inspection systems

Ss_50_35_06_06 Brick manhole systems

Ss_50_35_06_08 Brick shallow inspection chamber systems

Ss_50_35_06_10 Brick shallow silt trap and flow control chamber systems

Ss_50_35_06_12 Concrete deep manhole systems

Ss_50_35_06_14 Concrete manhole systems

Ss_50_35_06_16 Concrete shallow inspection chamber systems

Ss_50_35_06_18 Concrete silt trap and flow control chamber systems

Ss_50_35_06_62 Plastics deep non-entry inspection chamber systems

Ss_50_35_06_64 Plastics distribution and sampling chamber systems

Ss_50_35_06_66 Plastics shallow inspection chamber systems

Ss_50_35_08 Below-ground gravity drainage systems

Ss_50_35_08_15 Combined below-ground drainage pipeline systems

Ss_50_35_08_16 Combined sewer overflow systems

Ss_50_35_08_30 Foul wastewater below-ground drainage pipeline systems


Ss_50_35_08_85 Surface water below-ground drainage pipeline systems

Ss_50_35_10 Below-ground pumped drainage systems

Ss_50_35_10_06 Below-ground private packaged pumping station and pressure pipeline drainage systems

Ss_50_35_45 Land drainage systems

Ss_50_35_45_08 Blanket drain land drainage systems

Ss_50_35_45_20 Culvert land drainage systems

Ss_50_35_45_30 Filter drain land drainage systems

Ss_50_35_45_32 Fin drain piped land drainage systems

Ss_50_35_45_53 Mole or subsoiling drain land drainage systems

Ss_50_35_45_55 Narrow slot fin drain land drainage systems

Ss_50_35_45_75 Slitting or grooving land drainage systems

Ss_50_35_45_85 Subsoil drainage pipe drain systems

Ss_50_35_45_90 Trenchless drain land drainage systems

ection systems Surface and wastewater drainage collection systems

Ss_55_20_34_40 Incoming gas supply systems Y

Ss_60_40_92_15 Combined underfloor heating and cooling systems

Ss_60_60_70_71 Refrigerant cooling systems

Ss_60_40_92_92 Underfloor chilled water systems

Ss_60_60_70_94 Variable refrigerant flow systems

Ss_60_40_92_27 Electric underfloor heating systems

No change Low-temperature hot water heating systems

Ss_60_40_90_28 Electrical resistance trace heating systems

Ss_60_40_92_94 Underfloor low-temperature hot water heating systems

Ss_60_40_90 Trace heating systems Y

Ss_60_40_92 Underfloor heating and cooling systems Y

Ss_65_40_42_25 Dust extract systems Y

Ss_65_40_42_36 Hazardous area extract systems Y

Ss_70_30_10 Cable management systems Y

Ss_70_30_10_28 Extra-low-voltage cable management systems Y


Ss_70_30_10_35 High-voltage cable management systems Y

Ss_70_30_10_45 Low-voltage cable management systems Y

Ss_70_30_45_28 Extra-low-voltage distribution systems Y

No change Road signal and control systems

Motorway signal and control systems

Ss_75_30_35_60 Pedestrian crossing signal systems Y

Ss_75_30_35_86 Toll systems Y

Ss_75_30_35_88 Traffic signal systems

Ss_75_30_35_90 Traffic management control systems Y

Ss_75_40_53_70 Radio-frequency identification (RFID) tagging systems Y

Highway control systems

Ss_75_70_54_05 Air quality monitoring systems Y

Ss_75_70_54_75 Supervisory control and data acquisition (SCADA) systems Y

Road control systems

Pr_20_29_14_80 Sound isolation clips Y

Pr_20_29_81_08 Carbon steel bearing plates Y

Pr_20_29_81_09 Carbon steel soil nail anchorage nuts Y

Pr_20_29_81_56 Non-metallic bearing plates Y

Pr_20_29_81_61 Plastics grouting ducts Y

Pr_20_29_81_72 Soil nail centralizers Y

Pr_20_29_81_80 Stainless steel bearing plates Y

Pr_20_29_81_82 Stainless steel soil nail anchorage nuts Y

Pr_20_29_81_86 Steel wedges Y

Pr_20_76_63_33 Glass-reinforced plastics (GRP) angle sections Y

Pr_20_76_63_35 Glass-reinforced plastics (GRP) box sections Y

Pr_20_76_63_37 Glass-reinforced plastics (GRP) channel sections Y

Pr_20_93_52_16 Clay brick slips Y

Pr_20_93_52_32 Glazed clay brick slips Y

Pr_25_30_90_09 Carbon steel stair landing units Y


Pr_25_30_90_32 Glass stair landing units Y

Pr_25_30_90_34 Glued laminated timber stair landing units Y

Pr_25_30_90_35 Glued laminated timber stair treads Y

Pr_25_30_90_37 Hardwood stair landing units Y

Pr_25_30_90_62 Plastics stair landing units Y

Pr_25_30_90_80 Softwood stair landing units Y

Pr_25_30_90_82 Stainless steel stair landing units Y

Pr_25_30_90_86 Stone stair landing units Y

Pr_25_71_42_08 Aluminium infill panels

Pr_25_71_14_11 Autoclaved aerated concrete (AAC) cladding units Y

Pr_25_71_42_10 Carbon steel infill panels

Pr_25_71_63_18 Composite and recycled plastics sheets

Pr_25_71_63_32 Glass-reinforced plastics (GRP) panels

Pr_25_71_14_35 Glass-reinforced concrete cladding units Y

Pr_25_71_42_85 Stainless steel infill panels

Pr_25_71_14_96 Weathering steel cassette panels Y

Pr_25_71_51_94 Weathering steel sheets Y

Pr_25_96_30 Gratings Y

Pr_25_96_30_03 Anti-slip gratings Y

Pr_25_96_30_31 Footway gratings

Pr_35_31_22_37 High-pigment water-based paint

Pr_35_31_22_80 Solvent-based gloss finishes

Pr_35_31_22_81 Solvent-based masonry paints

Pr_35_31_22_82 Solvent-based matt and flat finishes


Pr_35_31_22_83 Solvent-based mid-sheen finishes

Pr_35_31_22_94 Water-based finishing coats Y

Pr_35_31_22_95 Water-based gloss finishes

Pr_35_31_22_96 Water-based masonry paints

Pr_35_31_22_97 Water-based matt and flat finishes

Pr_35_31_22_98 Water-based mid-sheen finishes

Pr_35_57_11_70 Recycled polyethylene terephthalate (PET) plastics underlays Y

Pr_40_10_57_23 Electrical diagrams

Pr_40_10_57_25 Electrical shock treatment signs

Pr_40_10_57_30 Externally illuminated emergency exit signs

Pr_40_10_57_43 Induction loop system signs

Pr_40_10_57_61 Photoluminescent emergency signs

Pr_40_10_57_62 Photoluminescent low-mounted way-guidance lighting

Pr_40_10_57_86 Surveillance system signs

Pr_40_10_57_88 Telecommunications equipment and outlets labels

Pr_40_10_57_91 Underground cable marker tapes

Pr_40_30_78_52 Medicine cabinets Y

Pr_40_70_35_27 Electric kilns Y

Pr_45_28_30_42 Lamprey plates Y

Pr_45_28_30_44 Lamprey tiles Y

Pr_60 Services and process source products

Pr_60_55_97_94 Vacuum degassers Y

Pr_60_60_08_09 Boiler superheaters Y

Pr_60_60_08_15 Combination gas-fired condensing boilers Y

Pr_60_60_10_08 Blown gas burners Y

Pr_60_60_13_80 Solar thermal absorption chillers Y

Pr_65 Services and process distribution products

Pr_65_52_34_46 Liquid petroleum gas (LPG) contents gauges Y


Pr_65_52_61_98 Water hammer arrestors Y

Pr_65_53_86_78 Shower booster pumps Y

Pr_65_54_33_08 Back check liquid petroleum gas (LPG) valves Y

Pr_65_54_33_28 Excess flow liquid petroleum gas (LPG) valves Y

Pr_65_54_33_58 Maximum level fill stop liquid petroleum gas (LPG) valves Y

Pr_65_54_95_84 Steel gate valves Y

Pr_65_67_39_15 Compressed air and water humidifiers Y

Pr_65_67_39_72 Resistance heater humidifiers Y

Pr_65_67_39_92 Ultrasonic humidifiers Y

Pr_65_70_13_98 Zinc core anodes Y

Pr_70 Services and process outlet products

Pr_70_75_52 Computer network products

Pr_75_50_76_87 Tilt sensor nodes

Pr_75 Services and process control products

Pr_75_50_02 Actuators Y

Pr_75_50_18 Control and indicator panels

Pr_75_50_20_02 Alarms

No change Automatic sprinkler pump control panels

Pr_75_50_02_13 Chain actuators

Pr_75_50_20_15 Compressed air master controllers

Pr_75_50_02_21 Damper actuators

Pr_75_50_20_29 Field controllers

Pr_75_50_20_34 Gas dose regulators

Pr_75_50_02_46 Linear actuators

Pr_75_50_18_48 Liquid presence detection programmable control units Y

Pr_75_50_20_70 Programmers

Pr_75_50_02_94 Valve actuators

Pr_75_50_20_96 Water display controls

Pr_75_50_20_98 Water quality controllers


Pr_75_50_20_99 Wind-operated water display control devices

Pr_75_50_20 Controllers and control components Y

Pr_75_50_20_12 Central processor units Y

Pr_75_50_20_40 Input cards Y

Pr_75_50_20_41 Input modules Y

Pr_75_50_20_42 Input and output cards Y

Pr_75_50_20_43 Input and output modules Y

Pr_75_50_20_52 Modular programmable logic controllers Y

Pr_75_50_20_58 Output cards Y

Pr_75_50_20_59 Output modules Y

Pr_75_50_20_68 Programmable logic controllers Y

Pr_75_75_50_72 Radio frequency identification (RFID) tags Y

Pr_80 Services and process general products

Pr_80_77_27_55 Multiple services riser plates Y

PM_10_20_03 Appointment document Y

PM_10_20_28 Exchange information requirement

PM_10_20_69 Quality plan Y

PM_40_35_45 Landscape model

PM_30_30_58 Operational waste management plan

PM_40_20 Design strategies Y

PM_40_20_05 Air conditioning design strategy Y

PM_40_20_13 Civil engineering design strategy Y

PM_40_20_15 Commissioning strategy Y

PM_40_20_17 Conservation strategy Y

PM_40_20_19 Cost plan strategy Y

PM_40_20_21 Daylight design strategy Y

PM_40_20_30 Fire safety strategy Y

PM_40_20_36 Health and safety strategy Y

PM_40_20_38 Heating and cooling design strategy Y


PM_40_20_42 Inclusive design strategy Y

PM_40_20_47 Lighting strategy Y

PM_40_20_63 Planning strategy Y

PM_40_20_65 Plan for use strategy Y

PM_40_20_83 Structural engineering design strategy Y

PM_40_20_85 Sustainability strategy Y

PM_40_20_94 Ventilation design strategy Y

PM_40_30_18 Construction specification Y

PM_40_20_26 Energy strategy

PM_40_30_58 Outline specification Y

PM_40_30_61 Performance specification Y

PM_40_30_62 Photorealistic visualization images Y

PM_40_30_70 Room data Y

PM_40_35 Design models Y

PM_40_35_04 Architects models Y

PM_40_35_10 Building services models Y

PM_40_35_15 Civil engineering models Y

PM_40_35_83 Structural engineering models Y

PM_40_40_20 Decant drawings Y

PM_40_40_63 Phasing drawings Y

PM_40_50_10 Building codes application Y

PM_40_50_63 Planning application Y

PM_40_60_11 Capability and capacity assessment report

PM_40_60_26 Design programme Y

PM_40_60_33 Federated information models Y

PM_40_60_38 Information assurance Y

PM_40_60_39 Information validation Y

PM_40_60_40 Information verification Y

PM_40_60_42 Information mobilization plan Y


PM_60_20_24 Decant programme Y

PM_60_20_26 Decant protocol Y

PM_60_25 Construction models Y

PM_60_25_83 Structural fabrication models Y

PM_60_40_70 Record photographs Y

PM_60_60_63 Site organisation chart Y

PM_60_60_78 Site waste management plan Y

PM_70_15_01 Access control commissioning certificate Y

PM_70_15_04 Audiovisual systems commissioning and acceptance certificate Y

PM_70_15_10 Building management systems (BMS) commissioning certificate Y

PM_70_15_13 Chlorination certificate Y

PM_70_15_15 Closed-circuit television (CCTV) commissioning certificate Y

PM_70_15_22 Disabled alarms and disabled refuge alarm testing certificate Y

PM_70_15_27 Electrical test certificate Y

PM_70_15_30 Fire-stopping protection certificate Y

PM_70_15_31 Fire-stopping protection register Y

PM_70_15_32 Flat roof electronic test results Y

PM_70_15_40 Incoming gas supply pressure test report Y

PM_70_15_42 Insurance certificate Y

PM_70_15_47 Lightning protection certificate Y

PM_70_15_63 Power metering commissioning certificate Y

PM_70_15_65 Primary fresh air supply test certificate Y

PM_70_15_76 Secondary and backup electricity supplies test certificate Y

PM_70_15_78 Security and intruder alarm commissioning certificate Y

PM_70_15_80 Smoke and fire alarm and fire suppression system telephone lines te Y

PM_70_15_82 Soak test results Y

PM_70_15_83 Sprinkler installation test certificate Y

PM_70_15_92 Uninterruptible power supply (UPS) test certificate Y

PM_70_15_96 Water quality and flushing test certificate Y


PM_70_15_34 Gas installation safety certificate

PM_70_85_14 Contractor sign-off report Y

PM_70_85_15 Construction to occupation transition strategy Y

PM_70_15 Compliance and certification documents

PM_70_15_29 Fire safety acceptance certificate

PM_80_10_58 Organization chart Y


Classification
Deleted Code changed changed Notes

Y Y

Y System section deleted duplicate of Ss_20_60_35_10

Y System section deleted; included in detail in Ss_45_75_30

Y System subgroup deleted and classifications moved to Ss_30_30


Y System section deleted and classifications added to Ss_30_30_15

Y System deleted and added to Ss_30_30_15_42

Y System deleted and added to Ss_30_30_15_64

Y System deleted and added to Ss_30_30_15_65

Y
Y

Y
Y

Y
Y

Y System deleted, replaced by Ss_75_30_35_90

Y System section deleted already in Ss_75_30_35

Y System section deleted already in Ss_75_30_35


Y Product deleted; duplicate of Pr_25_71_14_04

Y Product deleted; duplicate of Pr_25_71_14_22

Y Product deleted; duplicate of products in Pr_25_71_52

Y Product deleted; duplicate of Pr_25_71_14_87

Y Product deleted; duplicate of other products in section

Y
Y

Y
Y

Y
Y

Y Y

Y Y
Y

Y Y
Y

Y
d to Ss_30_30
Ss_30_30_15

You might also like