CQI-12 Coating System 3-29-16
CQI-12 Coating System 3-29-16
CQI-12 Coating System 3-29-16
© 2012 Automotive Industry Action Group, except that copyright is not claimed as to any part
of an original work prepared by a U.S. or state government officer or employee as part of the
person’s official duties.
Except as noted above, all rights are reserved by AIAG and no part of these materials may
be reproduced, reprinted, stored in a retrieval system, or transmitted, in any form or by any
means, electronic, photocopying, recording, or otherwise, without the prior written permission
of Automotive Industry Action Group. Copyright infringement is a violation of federal law
subject to criminal and civil penalties.
AIAG and Automotive Industry Action Group are registered service marks of the Automotive
Industry Action Group. Automotive Industry Action Group makes no claim to any trademark of
a third party. Trademarks of third parties included in these materials are the property of their
respective owners
CQI-12v2
1
Dated: 2/2012
CQI-12
Special Process: Coating System Assessment
Version 2 Issued 2/2012
Facility Name:
Address:
Personnel Contacted:
Name: Title: Phone: Email:
Auditors/Assessors:
Name: Company: Phone: Email:
Assessment
Assessment
Assessment
Assessment
Assessment
Assessment
Assessment
Assessment
Assessment
Assessment
Assessment
Assessment
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
1.1
Is contract review and advanced quality 1.2
3.1 planning, FMEA, Control Plans, etc., 1.3 N/A
performed by qualified individuals? 1.4
1.6
1.6
Are the Loading / Racking requirements
3.6 2.7
identified?
2.9
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
Each part may have one or more requirements determined by the coating specification.
What are the product inspection 1.5
3.8 Parts must meet each requirement. List each requirement below and validate.
requirements? 2.13 2.14
(Listed below are some examples)
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Requirement: Corrosion Resistance (if
3.8.2
applicable)
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
Test Method:
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
Selection of samples:
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
Specification:
3.8.7 Requirement: Appearance (Decorative)
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Requirement: Dimensional
3.8.8
(if applicable)
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Requirement: Color and Gloss
3.8.9
(Decorative)
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
1.4
1.6
Were appropriate process steps signed
3.9 2.2
off?
2.3
2.11
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
1.2
Were steps/operations performed that
3.11 1.4
were not documented in the Control Plan?
1.6
1.2
1.4
If additional steps were performed, were
3.12 1.6
they authorized?
1.10
1.16
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) / N/A
Packaging Requirements
2.6
3.17 Are packaging requirements identified? 2.7
2.9
Shipping Requirements
2.3
3.19 Were the parts properly identified?
2.9
2.3
3.20 Were the containers properly labeled?
2.9
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum
Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Requirement
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum
Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Requirement
1.4
Pressure for spray rinse.
A2.1 2.11 Automatic/Manual Once every 8 hours
Agitation for immersion tanks.
2.12
1.4
Continuous monitoring by controller.
A2.2 2.11 Temperature Automatic
Manually verify daily.
2.12
1.4 Chemical Concentration (Acid Cleaner) (If used) For continuous operations, once per day.
1.6 Per chemical supplier recommendation such as: Otherwise, prior to start of each production
A2.4 Automatic/Manual
2.11 - free acidity or concentration day. (once per day for concentration, once
2.12 - metal contamination per month for contamination).
Impurity Content
1.4
Per chemical supplier recommendation such as:
A2.5 2.11 Manual Once per week*
- acid split (oil contamination)
2.12
- alkalinity ratio
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum
Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Requirement
3.0 Rinse(s)
1.4
Pressure for spray rinse.
A3.1 2.11 Automatic/Manual Once every 8 hours
Agitation or flow for immersion tanks.
2.12
1.4
Continuous monitoring by controller.
A3.2 2.11 Temperature (if controlled) Automatic
Manually verify once per day.
2.12
A3.4 2.11 There is a dump schedule for rinses. Manual Per preventative maintenance schedule.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum
Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Requirement
1.4
A4.1 2.11 Concentration Manual Once every 8 hours
2.13
1.4
A4.2 2.11 Concentration of Fe, per coating supplier. Manual Once per day
2.12
1.4
A4.3 2.11 Inhibitor (if used) Manual N/A
2.12
1.4
A4.4 2.11 Solution Level Manual Once every 8 hours
2.12
1.4
A5.1 2.11 Concentration Manual Once every 8 hours
2.12
1.4
A5.2 2.11 Concentrations of Al, per coating supplier. Manual Once per day
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum
Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Requirement
1.4
A6.1 2.11 Concentration Manual Once every 8 hours
2.12
1.4
A6.2 2.11 Concentrations of Al, per coating supplier. Manual Once per day
2.12
1.4
A7.1 2.11 Temperature (if applicable) Automatic Manually measure once every 8 hours
2.13
1.4
A7.2 2.11 Concentration Manual Once every 8 hours
2.12
1.4
A7.3 2.11 Solution Level Manual Once every 8 hours
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Dwell time is clearly defined.
1.6
B1.5 If additional blasting is required, management approval Manual / Automatic Per load
2.11
is needed.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.6
B1.7 Abrasive media level Manual Once every 8 hours
2.11
2.12
1.4
B1.8 2.11 Dust collector efficiency/air flow Manual Once every 4 hours
2.12
1.4
Surface profile is checked after process
B1.11 2.11 Manual Per load
(if applicable).
2.13
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
C2.3 2.11 There is a dump schedule for conditioner. Manual Once per week
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
C3.1 2.11 Pressure/Agitation Automatic Once every 8 hours
2.12
Chemical Analysis:
- Phosphate: Free Acid, Total Acid, Iron Content, pH,
1.4
Accelerator Amount as Applicable
C3.3 2.11 Automatic/Manual Once every 4 hours
- Non-phosphate: Concentration, pH
2.12
- Chromate: Concentration, pH
- Non-chrome: Concentration, pH
1.4
Fluoride Ion Concentration (if aluminum is being
C3.4 2.11 Automatic/Manual Once every 4 hours
coated)
2.12
1.4
1.6
C3.5 Coating Weight/Thickness Manual Once every 8 hours*
2.11
2.12
1.4
C3.6 2.11 Crystal/Grain Size (If applicable) Manual Per customer requirement
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
C4.2 2.11 Pressure/Agitation Automatic Once every 8 hours
2.12
C4.3 2.11 There is a dump schedule for rinses. Manual Once per week
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
C5.4 2.11 There is a dump schedule for seal. Manual Once per week
1.4
C6.1 2.11 Air temperature is monitored and controlled. Automatic Once every 8 hours
2.12
1.4 There is a procedure to ensure dryness of parts prior to Every change of lot number and each
C6.2 Visual
2.11 subsequent coating. container.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
The temperature of parts entering the coating booth is
D2.1 2.11 Automatic/Manual Once every 8 hours
monitored.
2.12
1.4
The ground is checked using a 500 volt mega ohm At start-up, every process change and
D2.3 2.11 Manual
meter (less than 1megaohm resistance). once every 8 hours.
2.12
1.4
All guns are properly assembled (e.g., electrodes and Prior to the start of production and once
D2.4 2.11 Manual
deflectors are installed and not damaged). every 8 hours.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
The voltage and the current setting of the spray gun is At start-up, every process change and
D2.5 2.11 Manual
defined and verified for each process and part. once every 8 hours.
2.12
1.4
The air dryer output temperature and dew point need to Prior to start of production and once every
1.17
D2.7 be measured. The filter on main compressed air line Automatic/Manual 4 hours. With a control alarm, frequency
2.11
needs to be monitored. may be reduced to once every 8 hours.
2.12
1.4
Prior to start of production and once every
1.17
D2.8 The booth temperature and humidity are checked. Automatic 4 hours. With a control alarm, frequency
2.11
may be reduced to once every 8 hours.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.17 Prior to the start of production and once
D2.10 Every sieve is clean and operational. Automatic/Manual
2.11 every 8 hours.
2.12
1.4
Prior to the start of production and once
D2.11 2.11 The powder flow on sieve is monitored. Automatic/Manual
every 8 hours.
2.12
1.4
Prior to the start of production and once
D2.12 2.11 The feed hopper fluidizing air pressure is checked. Manual
every 8 hours.
2.12
1.4
Prior to the start of production and once
D2.13 2.11 The dust vent on feed hopper is checked. Manual
every 8 hours.
2.12
1.4
1.17 Prior to the start of production and once
D2.14 The reclaim sieve is operating properly. Manual
2.11 every 8 hours.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.17 The venturis (orifice or block) in the feed pumps and Prior to the start of production and once
D2.15 Manual
2.11 the pick up tubes in the hopper are checked. every 8 hours.
2.12
1.4
The feed hoses are checked to ensure that they have Prior to the start of production and once
D2.16 2.11 Manual
no excessive bends and kinks. every 8 hours.
2.12
1.4
1.17 The pressure differential across the filters in the booth Prior to the start of production and once
D2.18 Automatic
2.11 collection chamber is monitored. every 8 hours.
2.12
1.4
Prior to the start of production and once
D2.19 2.11 Sealing Rinse (if applicable) Manual
every 8 hours.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Paint racks and/or fixtures are visually inspected for
1.17
E1.3 cleanliness, excessive paint build-up, bent hooks, Manual Each time parts are racked/loaded.
2.11
etc.
2.12
1.4
1.17 There is a paint rack/fixture maintenance program.
E1.4 Manual Per preventative maintenance schedule.
2.11 Program must define rack/fixture cleaning intervals.
2.12
1.4
Surface profile is within specifications
E1.5 2.11 Manual Once every 4 hours
(if applicable).
2.13
1.4
Surface tension is within specifications
E1.6 2.11 Manual Once every 4 hours
(if applicable).
2.13
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.6
Paint agitation/time and reduction (solvent package)
E2.3 1.17 Manual Once every 8 hours
are proper and documented.
2.11
2.12
1.4
Prior to start of production and every
1.6
Viscosity is verified to be within operational limits process change and/or addition. For
E2.4 1.17 Manual
and documented. continuous operations check once every 8
2.11
hours.
2.12
1.4
Prior to start of production and every
1.6
Temperature is verified to be within operational process change and/or addition. For
E2.5 1.17 Automatic/Manual
limits and documented. continuous operations check once every 8
2.11
hours.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.6
Prior to start of production and every
E2.6 1.17 The proper filter size and type are in place. Manual
process change.
2.11
2.12
1.4
1.6 Pump pressures are set and pressure readings are
Prior to start of production, every process
E2.7 1.17 verified and documented to be within operational Manual
change and once every 8 hours.
2.11 limits.
2.12
1.4
Circulation (flow meter, pressure gage) is monitored Prior to start of production, every process
E2.8 2.11 Automatic/Manual
and documented. change and once every 8 hours.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
3.0 Primer/Promoter
1.4
1.17 Prior to start of production, every process
E3.1 Destaticizing air is operational. (Plastic parts only). Automatic
2.11 change and once every 8 hours.
2.12
1.4
Booth balance (air flow) is monitored and Prior to start of production, every process
E3.2 2.11 Manual
documented. change and once every 8 hours.
2.12
1.4
1.6
Booth temperature and humidity are monitored and Prior to start of production, every process
E3.3 1.17 Automatic/Manual
documented. change and once every 4 hours.
2.11
2.12
1.4
1.6 Atomizer parameters (fluid flow, air pressures Prior to start of production and every
E3.4 1.17 (atomizing fan, shaping), electrostatics and mixing) Automatic/Manual process change. For continuous
2.11 are set within operational limits. operations once per day.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.6 Flashtimes between coats are set at suppliers At the start of production and every
E4.1 Automatic/Manual
2.11 recommended times. process change.
2.13
1.4
1.6
Booth temperature and humidity are monitored and Prior to start of production, every process
E4.2 1.17 Automatic/Manual
documented. change and once every 4 hours.
2.11
2.12
1.4
1.6 Atomizer parameters (fluid flow, air pressures Prior to start of production and every
E4.3 1.17 (atomizing fan, shaping), electrostatics and mixing) Automatic/Manual process change. For continuous
2.11 are set within operational limits. operations once per day.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
For each coating in use, proper cure or drying time
1.6 Every three months and after oven
E5.3 parameters are verified based upon product Manual
2.11 modification or repair.
technical data sheet.
2.12
E5.4 1.17 Air filter (if used) change is scheduled. Manual Per preventative maintenance schedule.
1.4
1.6 Percent solids after pre-dry is at the suppliers
E5.5 Manual Once every 8 hours
2.11 recommended percentage.
2.13
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.6 Flashtimes between coats are set at suppliers At the start of production and every
E6.1 Automatic/Manual
2.11 recommended times. process change.
2.13
1.4
1.6
Booth temperature and humidity are monitored and Prior to start of production, every process
E6.2 1.17 Automatic/Manual
documented. change and once every 4 hours.
2.11
2.12
1.4
1.6 Atomizer parameters (fluid flow, air pressures Prior to start of production and every
E6.3 1.17 (atomizing fan, shaping), electrostatics and mixing) Automatic/Manual process change. For continuous
2.11 are set within operational limits. operations once per day.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Bath parameters (pH, conductivity, solid content, temperature,
F2.1 2.11 Automatic/Manual Once every 8 hours
voltage) are checked and adjusted.
2.12
1.4
Oil contamination (Panel inspection for pin holes). Once per month and if any visual defects
F2.2 2.11 Manual
Oil bags must be available. are observed.
2.12
1.4
F2.6 2.11 Flow over the weir is verified. Manual Once every 8 hours
2.12
1.4
F2.7 2.11 Bath is checked for microbial contamination. Manual Once every month*
2.12
1.4
Incoming DI / RO water is checked for cleanliness. (Conductivity
F2.8 2.11 Automatic/Manual Once every 8 hours
<10 µS/µmhos )
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.17 Paint racks and/or barrels are visually inspected for cleanliness,
F2.9 Manual Each time parts are racked/loaded
2.11 excessive paint build-up, bent hooks, etc.
2.12
1.4
1.17 There is a paint rack/barrel maintenance program. Program
F2.10 Manual Per preventative maintenance schedule.
2.11 must define rack/barrel cleaning intervals.
2.12
1.4
F2.11 2.11 Saddle contact cleanliness (if applicable). Manual Once every 8 hours
2.12
1.4
1.17
F2.12 There is a tank cleaning and maintenance schedule. Manual Once every year
2.11
2.12
1.4
F2.13 2.11 Confirmation of ash content (pigment to binder ratio). Manual Once per month
2.12
1.4
F2.14 2.11 Analysis of accumulation of metallic impurities. Manual Once every 6 months
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
F3.1 2.11 The conductivity of the anolyte solution has been measured. Manual Once every 8 hours
2.12
1.4
F3.2 2.11 The pH of the anolyte solution has been measured. Manual Once every 8 hours
2.12
1.4
Oil contamination (Panel inspection for pin holes).
F3.3 2.11 Manual Once every month
Oil bags must be available.
2.12
1.4
F3.4 2.11 The anolyte solution is being circulated to each cell. Automatic/Manual Once every 8 hours
2.12
1.4
F3.5 2.11 Dump and clean schedule for anolyte is being maintained. Manual Per preventative maintenance schedule.
2.12
1.4
F3.6 2.11 Amperage draw has been checked on anodes. Automatic/Manual Per preventative maintenance schedule.
2.12
4.0 Rectifier
1.4
1.6 The proper voltage is being used for the load size. When each bar or rack enters the coating
F4.1 Manual
2.11 (Electronically Controlled with digital read-out) tank.
2.12
1.4
Once every 6 months or after any change
F4.2 2.11 The ramp up time to full voltage has been verified. Automatic/Manual
or maintenance of rectifier.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.17 The ripple of the rectifier has been checked by an approved Once per year or after any change or
F4.4 Automatic/Manual
2.11 electrician. maintenance of rectifier.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Immersion rinse tanks are operating at the proper levels and
F5.1 2.11 Automatic/Manual Once every 8 hours
tanks are being agitated correctly.
2.12
1.4
F5.2 2.11 There is sufficient permeate supplied to the rinse. Automatic/Manual Once every 8 hours
2.12
1.4
The pH and conductivity of the DI rinse water are measured. (If
F5.3 2.11 Manual Once every 8 hours
part of production process).
2.12
1.4
Ultra filters are in use (not by-passed) and pressures monitored.
F5.4 2.11 Automatic/Manual Once every 8 hours
2.12
1.4
1.17 Rinse tanks and related equipment are emptied, inspected and
F5.6 Manual Per preventative maintenance schedule.
2.11 cleaned.
2.12
6.0 Cure (See Cure Process Table I)
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.17 Appropriate mixing equipment is used, capable of
G2.3 Manual Ongoing
2.11 dispersing settled solids.
2.12
1.4
Prior to start of production and once every 3
G2.9 2.11 Paint Temperature Automatic/Manual
hours.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Prior to start of production and once every 3
G2.10 2.11 Viscosity Manual
hours.
2.12
1.4
Prior to start of production and once every 3
G2.12 2.11 Volume (paint depth in coating vat). Automatic/Manual
hours.
2.12
G2.16 2.10 Viscosity cups are cleaned after each use. Manual Ongoing
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
G3.2 Baskets are kept less than 2/3 full by volume. Automatic/Manual Every lot
1.6
G3.5 2.10 Vibratory feed tables are cleaned (if used). Manual As needed
1.4
G3.7 2.9 Parts are cool to touch before each coating step. Manual Every lot
2.11
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Mixer speed and direction are monitored and
H1.1 2.11 Automatic/Manual Once every 8 hours
adjusted.
2.12
1.4
1.6 Temperature of the coating bath is continuously Continuous monitoring by controller and
H1.2 Automatic
2.11 monitored and controlled. manually verified once per day.
2.12
1.4
Misting nozzles in the vicinity of the coating bath
H1.3 2.11 Automatic/Manual Once every 8 hours
are operational.
2.12
1.4
Acid (e.g., 101 meter) and oxidation/reduction
H1.4 2.11 Automatic/Manual Once every 2 hours
potential (ORP) levels are checked.
2.12
1.4
Chemical concentration (% solids, starter/iron
H1.5 2.11 Automatic/Manual Once every 8 hours
titration, conductivity) is checked and maintained.
2.12
1.4
1.17 Coating tank, mixers and heating/cooling system
H1.6 Manual Once every 12 months
2.11 are inspected and maintained.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
H2.1 2.11 Pump pressure or agitator speed is monitored. Automatic/Manual Once every 8 hours
2.12
1.4
H2.2 2.11 Impurity concentration (conductivity) is checked. Automatic/Manual Once every 8 hours
2.12
1.4
Chemical concentration is checked and
H3.1 2.11 Automatic/Manual Once every 8 hours
maintained.
2.12
1.4
H3.2 2.11 Pump pressure or agitator speed is monitored. Automatic/Manual Once every 8 hours
2.12
1.4
1.17 Per Chemical Manufacturer's
H3.4 There is a dump schedule. Manual
2.11 recommendation and production volume.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Item # Related
CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.0
1.4
For each coating in use, proper cure or drying time parameters
1.6 Once every 3 months and after oven
I1.3 are verified based upon oven temperature profile and product Manual
2.11 modification or repair.
technical data sheet.
2.12
1.4
For manual process, prior to start of
1.6
Conveyor speed set point is verified. If conveyor is not used, production and every part change. For
I1.4 1.17 Automatic/Manual
time in oven is verified. automated process, at the start of
2.11
production and every process change.
2.12
Cure testing is performed per part specification on a production At oven start-up, every process change
I1.6 2.13 Manual
part. and once every 8 hours.
Coating adhesion test is performed per part specification on a At oven start-up, every process change
I1.7 2.13 Manual
production part. and once every 8 hours.
Appearance requirements checks (color, gloss etc.) are At oven start-up, every process change
I1.8 2.13 Manual
performed per part specification. and once every 8 hours.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
J1.2 2.11 Cleaner Concentration Manual Once per day *
2.12
1.4
J1.3 2.11 Soil loading ( i.e., acid split, alkalinity ratio) Manual Once per day *
2.12
1.4
J1.5 2.11 Agitation (Consistent Across tank) Automatic Once every 8 hours
2.12
1.4
J1.6 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J1.7 2.11 Skimmer Weir Level/oil separator function Automatic or Manual Once every 8 hours
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
J1.8 2.11 Oil on top of tank Manual Once every 8 hours
2.12
1.4
J1.9 2.11 Debris in bottom of tank Manual Once every 8 hours
2.12
1.4
J1.10 2.11 Metal Contamination (as applicable) Manual Once every 8 hours
2.12
2.0 Rinsing
1.4
J2.1 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
Contamination accumulation/build up on side
J2.2 2.11 Manual Visual Once per week *
of tanks
2.12
1.4
There is a process for control of biological
J2.3 2.11 Manual Once per week *
contamination
2.12
1.4
Pressure for spray rinse.
J2.4 2.11 Automatic/Manual Once every 8 hours
Agitation or flow for immersion tanks.
2.12
1.4
Continuous monitoring by controller.
J2.5 2.11 Temperature (if controlled) Automatic
Manually verify daily.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
J2.8 2.11 There is a dump schedule for rinses. Manual Per preventative maintenance schedule.
1.4
Continuous monitoring by controller.
J3.1 2.11 Temperature (if applicable) Automatic or Manual
Manually verify daily.
2.12
1.4
J3.2 2.11 Concentration Manual Once per day *
2.12
1.4
J3.3 2.11 Acidity Ratio (Total Acid/ Free Acid = Ratio) Manual Once per day *
2.12
1.4
J3.5 2.11 Agitation (Consistent Across tank) Automatic Once every 8 hours
2.12
1.4
J3.6 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J3.7 2.11 Debris in bottom of tank Manual Once per day
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Continuous monitoring by controller.
J4.1 2.11 Temperature (if applicable) Automatic or Manual
Manually verify daily.
2.12
1.4
J4.2 2.11 Concentration Manual Once per day *
2.12
1.4
Contamination:
J4.3 2.11 Manual Once per day *
For alkaline: aluminum content
2.12
1.4
Contamination accumulation/build up on side
J4.4 2.11 Manual Once per week
of tanks
2.12
1.4
J4.7 2.11 Agitation (Consistent Across tank) Automatic Once every 8 hours
2.12
1.4
J4.8 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J4.9 2.11 Debris in bottom of tank Manual Once per day
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
J5.2 2.11 Acid concentration Manual Once every 4 hours
2.12
1.4
J5.3 2.11 Specific gravity Manual Once every 4 hours
2.12
1.4
J5.4 2.11 Contamination: aluminum content Manual Once per week
2.12
1.4
Contamination accumulation, suspended
J5.5 2.11 Manual Once per day
solids
2.12
1.4
J5.7 2.11 Agitation (Consistent Across tank) Automatic Once every 8 hours
2.12
1.4
J5.8 2.11 Solution Level Automatic or Manual Once every 4 hours
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
J6.1 2.11 Acid concentration or specific gravity Manual Once every 8 hours
2.12
1.4
J6.2 2.11 Time Automatic or Manual Once every 8 hours
2.12
1.4
J6.3 2.11 Agitation (Consistent Across Tank) Manual Once every 8 hours
2.12
1.4
J6.4 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J6.5 2.11 Debris in bottom of tank Manual Once per week
2.12
1.4
J6.6 2.11 Temperature Automatic or Manual Once per day
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
7.0 Anodizing
1.4
Continuous monitoring by controller.
J7.1 2.11 Temperature Automatic
Manually verify daily.
2.12
1.4
J7.2 2.11 Acid Concentration Manual Once every 8 hours *
2.12
1.4
J7.4 2.11 Aluminum Content (maximum 20 g/L) Manual Once per week
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
J7.6 2.11 Agitation (Consistent Across tank) Manual Once every 8 hours
2.12
1.4
J7.7 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J7.8 2.11 Debris in bottom of tank Manual Once per week
2.12
1.4
J7.10 2.11 Saddle Contact Cleanliness Manual Once every 8 hours
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
8.0 Dye
1.4
Continuous monitoring by controller.
J8.1 2.11 Temperature Automatic
Manually verify daily.
2.12
1.4
J8.2 2.11 Concentration Manual Once per day *
2.12
1.4
J8.3 2.11 pH Manual Once every 8 hours *
2.12
1.4
J8.5 2.11 Agitation (as applicable) Automatic Once every 8 hours
2.12
1.4
J8.6 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J8.7 2.11 Debris in bottom of tank Manual Once every 8 hours
2.12
1.4
There is a process for control of biological
J8.8 2.11 Manual Once per week *
contamination.
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Continuous monitoring by controller.
J9.1 2.11 Temperature (if applicable) Automatic or Manual
Manually verify daily.
2.12
1.4
J9.2 2.11 Concentration Manual Once per week *
2.12
1.4
J9.3 2.11 pH Manual Once every 4 hours *
2.12
1.4
J9.5 2.11 Agitation (as applicable) Automatic Once every 8 hours
2.12
1.4
J9.6 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J9.7 2.11 Debris in bottom of tank Manual Once every 8 hours
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
Related
Item # CSA Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
Continuous monitoring by controller.
J10.2 2.11 Temperature Automatic or Manual
Manually verify every 4 hours if controlled.
2.12
1.4
J10.3 2.11 Concentration Manual Once every 8 hours *
2.12
1.4
J10.4 2.11 pH Manual Once every 4 hours *
2.12
1.4
Contamination (per chemical vendor
J10.5 2.11 Manual Once per week *
recommendation)
2.12
1.4
J10.6 2.11 Agitation (as applicable) Manual Once every 8 hours
2.12
1.4
J10.7 2.11 Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J10.8 2.11 Debris in bottom of tank Manual Once every 8 hours
2.12
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements.
PROCESS EQUIPMENT
K1.1 2.14 pH / Conductivity Meter X X X X X X Daily Once per year
pH / Conductivity Probe
K1.2 2.14 Solution compatible probes must X Before each use N/A
be used.
Wet Analysis:
Before use, chemicals must be
K1.6 2.14 X X X X X X Daily N/A
checked for shelf life and/or
expiration date
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to specifications or other
requirements.
Related
Item # CSA Category/Process Steps Monitoring Frequency Observation/Comments
Question #
1.0
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to specifications or other
requirements.
Related
Item # CSA Category/Process Steps Monitoring Frequency Observation/Comments
Question #
L1.9 Dimensional check (e.g., Go-no go, Plug and Ring gage) Per customer specification