Design Calculation Sheet: 1 of 1 Bulk Fuel Oil Tanks

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

Design calculation sheet

Project no: Date: 13/1/2007 Sheet no.: 1 of 1 Computed by:


Subject: Bulk Fuel Oil Tanks Checked by:
Approved by:

Light oil (No.2)

Generators As per electrcial dep. requirements. 24 m3

Boilers

Acting boilers gph (per each) Quantity Operation time (h per day) Storage (days) Storage (gallons) Storage (m3)
2 Boilers 250 HP each 300 2 12 3 21600 81.76
1 Boiler 125 HP 55 1 12 3 1980 7.50
89.26
*As per York Shipley Catalogue

Total Required Storage 89.26 m3


* Fuel Capacity required for generators will not be added, since boilers will not operate in cases of emergencey.
* All diversities are included in boilers selection.

Number of Tanks 3
Tank Capacity 30 m3

Tank Dimensions D= 2.5 mm


(As per Capitoline catalogue) L= 6.5 mm
Design calculation sheet
Project no: LY06070 Date: 13/1/2007 Sheet no.:
Subject: Daily Fuel Tanks

Light oil (No.2)

Generators
Daily Fuel Tank As per electrcial dep. requirements.

Boilers
(2 hours storage)

Acting boilers gph (per each) Quantity Storage (hours) Storage (gallons)
2 Boilers 250 HP each 300 2 1 600
1 Boiler 125 HP 55 1 1 55
Daily Fuel Tank Capacity

*As per York Shipley Catalogue

* Fuel Capacity required for generators will not be added, since boilers will not operate in cases of emergencey.
* All diversities are included in boilers selection.
1 of 1 Computed by: IM
Checked by: SS
Approved by: SS

--- m3

Storage (m3)
2.27
0.21
2.5

operate in cases of emergencey.


Design calculation sheet
Project no: LY06070 Date: Sheet no.: 1 of 1 Computed by: IM
Subject: Fuel Pumps Checked by: SS
Approved by: SS

Light oil (No.2)

Generators

Boilers

GPH GPM L/s


Primary Fuel Pump Capacity 1310 22 1.4

Transfer Pump Capacity 1965 33 2.1

Transfer Pump Head

Static (m) = 6.5

Friction
Total maximum pipe length (m) = 280
Total Equiv. Length (m) = 350
Pipe Size (inch) = 3
Viscosity for light oil = 200
Pressure drop, as per "Piping Systems" (psi / 100 ft) = 0.27
Total Friction Loss (psi) = 3
Total Friction Loss (m) = 2.1

Residual Pressure (psi) = 10


Residual Pressure (m) = 6.8

Transfer Pump Head (m) = 15.4

*Capacity is selected in order to cater for the boilers' demand.


* Fuel Capacity required for generators will not be added, since boilers will not operate in cases of emergencey.
* All diversities are included in boilers selection.
Design calculation sheet
Project no: LY06070 Date: 15/1/2007 Sheet no.: 1 of 1 Computed by: IM
Subject: Upstand for Fuel Tanks Checked by: SS
Approved by: SS

Number of Tanks 3
Tank Capacity 30 m3

Spilt Oil Voulme (Volume of 1 tank) 30 m3

Separated Area of Room 69 m2

Height of Spilt Oil 0.43 m


43.28 cm

Required Upstand Height 50 cm