Product Standard: Pumps FP60300
Product Standard: Pumps FP60300
Product Standard: Pumps FP60300
5
PRODUCT STANDARD FP60300
TD-106-1
The intent of specification is to procure High-pressure drop control valve for use in the
recirculation system of Boiler feed pump of thermal power plant, to ensure minimum
quantity of flow through the pump. The valve shall be capable of throttling from
discharge pressure of Boiler feed pump to the deaerator pressure for both hot and cold
The information on this document is the property of BHARAT HEAVY ELECTRICALS LIMITED,
Boiler feed pump is variable speed type and the valve shall be suitable for the following
conditions corresponding to maximum & minimum speed and temperature.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
3.2.0 Pressure drop across orifice plate at cold condition shall be designed for 1 kg/cm2
3.3.0 Valve shall go to full open condition with supply air failure to actuator and supply
voltage failure to solenoid valve.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
5.1.0 Control valve body shall be selected as per the ISA Guideline. The valve body shall be
The information on this document is the property of BHARAT HEAVY ELECTRICALS LIMITED .
of forged steel.
It must not be used directly or indirectly in any way detrimental to the interest of the company.
5.2.0 The control valve sizing (Cv / Kv) shall be based on following guidelines:
a) The valves shall pass normal flow (MCR condition) with 60 to 70 percent opening
for linear characterised valves and between 70 to 80 percent opening for equal
percentage characterised valves.
b) The valves shall have adequate range ability to pass the minimum and maximum
flows at 10% and 85% of the valve opening respectively. Valve stem travel range from
minimum to maximum flow condition shall not be less than 50% of the total valve stem
COPYRIGHT AND CONFIDENTIAL
travel.
c) Valve Cv shall be selected in such a way that the valve shall be capable of handling
at least 120% of required maximum flow.
d) The valve selection shall be based on the highest size dictated by the above
considerations unless noise, flashing or other factors dictate the final selection.
e) Trim exit outlet velocity as defined in ISA handbook does not exceed 8 m/sec for
liquid services, 150 m/sec for steam services and 50/% of sonic velocity for flashing
services The sizing procedure followed shall be as per latest edition of ANSI/ISA or
equivalent standard.
5.3.0 Each recirculation line will be routed independently to deaerator storage tank. An
orifice, with a small pressure drop, shall be fitted in each line near the deaerator to
prevent any flashing in the pipeline. This Orifice plate along with counter flanges and
fasteners to be supplied along with RC Valve.
5.4.0 Bidder to furnish detailed calculation for trim exit velocity and valve outlet velocity in
technical proposal stage.
5.5.0 Bidder to furnish detailed noise calculation for all valves. Which will be subject to
Employer’s approval during detailed engineering.
5.6.0 Control valves for steam and water applications shall be designed to prevent
cavitation, wire drawing, flashing on the downstream side of valve and downstream
piping. Thus for cavitation/flashing service, only valve with anti-cavitation trim shall be
provided. Bidder shall furnish in his proposal detailed calculations to establish whether
cavitation will occur or not under any operating condition for a particular application.
These calculations clearly indicating shall be subject to BHEL review and approval and
in case it is established at any stage of the contract that cavitation will occur, the
Bidder shall provide anti-cavitation trim for the same at no extra price. Further the
Bidder shall furnish in his proposal the detailed write up, technical literature etc. clearly
indicating as to how the occurrence of cavitation shall be prevented by the design of
this offered anti-cavitation trim. The valve design which only shifts the occurrence of
cavitation for minimizing the erosion will not be acceptable.
Ref. Doc
5.7.0 Control valves shall have leakage class equal or better than class-VI with metal-to-
metal seating (For Var-04) and Class-V for all other variants.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
6.13.0 Each valve shall have an arrow fixed permanently on the valve body to indicate the
correct direction of flow.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
Valve body ends shall be butt welded type as per ANSI B 16.34 for control valves of
sizes 65 mm and above. Valve inlet and outlet pipe size details are given at Cl. No.
3.1.0. Required valve edge preparation details will be furnished during contract
execution stage. Bidder shall offer valve body such that it is directly weldable to pipe
size without any cost implication to BHEL.
Orifice plate flanges to ends shall be butt welded type as per ANSI B 16.34.
Recirculation line size details are given at Cl. No. 3.1.0. Required Flange edge
preparation details will be furnished during contract execution stage. Bidder shall offer
Flanges such that it is directly weld able to pipe size without any cost implication to
BHEL.
9.0.0 VALVE ACTUATORS:
pressure at full open and full closed positions. For single seated valves the pressure
shall be listed for maximum differential and for zero differential across the valve.
Opening and Closing time of the valve shall be less than 10 seconds.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
10.1.0 All pneumatic actuated control valve accessories such as air locks, hand wheels/hand-
jacks, limit switches, microprocessor based electronic Positioner, diffusers, external
volume chambers, position transmitters (capacitance or resistance type only),
reversible pilot for Positioner, tubing and air sets, solenoid valves and junction boxes
etc. shall be provided as per the requirements.
10.2.0 Limit Switches:
The information on this document is the property of BHARAT HEAVY ELECTRICALS LIMITED .
Limit Switches shall have not less than two normally open and two normally closed
It must not be used directly or indirectly in any way detrimental to the interest of the company.
contacts in both open and closed conditions. Electrical rating of the limit switch
contacts shall be 240V AC, 5.0 amps or 220V DC, 0.5 Amps. The enclosure of the limit
switches shall be as per IP-65. Each limit switch shall be supplied with cable glands.
10.3.0 Solenoid Valves:
1. Operating Principle : Electromagnetic (noiseless).
2. Coil voltage rating : 240 V AC /24 V DC (as required).
3. Ways : 2/3/4 way.
4. Port size : 1/4" NPT all ports.
COPYRIGHT AND CONFIDENTIAL
iv) Positioner casings shall be dust tight, corrosion resistant and weatherproof to IP 65
and explosion proof in hazardous areas.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
3. Type of Cover: Solid unhinged with retention chain / Screwed at all four corners
4. Paint: RAL 7032-Siemens Grey
5. Mounting: Surface / Two (2) inch Pipe stanchion (At a dry compartment at one
side of the enclosure / rack with front opening type door)
6. Cable Entry: 3 mm (min) Bottom / side Gland plate
7. Gasket: Neoprene
8. Grounding: Brass earth lug with green screw head External-2 no’s, Internal-1no.
COPYRIGHT AND CONFIDENTIAL
(M6)
9. Number of Drain Holes: Two at bottom capped
10. Identification: Label for JB and Tags for cable
11. Accessories: a) Rail mounted cage clamp type screwless terminals (suitable for
conductor size up to 2. 5sq.mm of suitable voltage grade) with markers and 20%
spare terminals
b) Cable gland (Brass) & raceways
c) Ferrules & lugs (Brass)
d) Aluminum back panel
e) Canopy at top
f) Mounting brackets
g) bolts and nuts made of brass etc.
10.7.0 Bidder to provide Cast Steel (CS) yokes. Cast Iron (CI) yokes are Not Acceptable.
All valves including actuators shall be tested in accordance with the quality assurance
program agreed between the Employer and Contractor, which shall meet the
requirements of IBR and other applicable codes mentioned elsewhere in the
specifications.
The quality control plans and reference documents shall be furnished for BHEL
approval. If required supplier shall depute their representative for discussions and
finalization of quality plan and reference documents with BHEL.
The tests shall include but not be limited to the following:
11.1.0 Non Destructive Test as per ANSI B-16.34.
11.2.0 Valve closure test and seat leakage test in accordance with ANSI/FCI 70.2 and as per
the leakage class indicated above.
11.3.0 Functional Test: The fully assembled valves including actuators control devices and
accessories shall be functionally tested to demonstrate times from open to close
Ref. Doc
position.
11.4.0 Properties of materials shall be determined from the test pieces fully representative of
the material and its condition. Detailed results of the test conducted to determine the
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
11.9.1 Valves shall be subjected to hydrostatic shell test in accordance with ANSI-B 16.34
prior to seat leakage test. If the valves are reworked on the pressure parts for any
reason after hydrostatic test, they must be retested.
11.9.2 Valves shall be hydrostatically tested in manufacturer’s works in accordance with code
requirements. All hydrostatic testing and inspection shall be completed before any
paint is applied to valve body. Certificates of inspection shall be executed in
accordance with the latest and required codes and shall be forwarded to the Engineer.
COPYRIGHT AND CONFIDENTIAL
11.9.3 All gaskets used for test shall be of the same material and designs as specified for the
finished product. Where mechanical gasket joints and broken following tests, new
gasket shall be furnished with the equipment and the joints shall be re-tested.
11.10.0 Leakage Test:
11.10.1 Valve closure test and seat leakage tests shall be performed in accordance with
ANSI/FCI 70.2 and as per applicable leakage class. Seat leakage test shall be carried
out by closing the valve with the help of job actuator. Actuator body shall be subjected
to pneumatic test and no leakage is permitted.
11.10.2 If valves are disassembled after the completion of the valve closure and seat leakage
tests for any rectification, these tests shall be repeated.
11.11.0 Functional Tests:
The fully assembled or completed valves including the actuators control devices and
accessories shall be functionally tested to demonstrate the operability and response
time of the valve and the actuator. This may be done by cycling the valves 3 or 4 times
from open to close position. The same controller can be used to test each valve.
These tests shall also include the verification of control valve operation features such
as stay put operation, fail to open, fail to close on air failure, control signal failure etc.
in line with the specification requirement.
11.12.0 Life Cycle Test (Type test):
Type test certificate carried out earlier by the vendor on similar design size and the
type of valve and actuator shall be furnished. The certificate shall contain the model
no. /size of the valve and actuator. The actuators of the valves shall be tested for
compliance with the life cycle data in line with the relevant standards. The voltage,
current rating and insulation class of solenoid operated valve shall be tested for
compliance with specification requirement.
11.13.0 Cv Test:
Cv test shall be carried out as per approved test procedure on each size, type and
design of the each Purchase Order. As per ISA-75.02 standard from 0 to 100% of the
valve travel in steps of 20% and test values shall meet published catalogue
Ref. Doc
requirements taking into consideration the allowable tolerances as per ISA-75.11 and
test report shall be furnished for BHEL approval. Before commencing the test, Cv type
test procedure shall be submitted for BHEL review and approval.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
12.0.0 PACKAGE :
12.1.0 Guidelines for Packing
After inspection of control valves assembly. Smart Positioner along with Pressure Gauge
shall be disassembled & packed separately.
Threaded connection of Smart Positioner & Pressure Gauge shall be shipped with the
end caps fitted to avoid any damage.
Instructions with sketch for mounting the Smart Positioner & Pressure Gauge shall be
COPYRIGHT AND CONFIDENTIAL
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
12.3.0 PROTECTION
All coated surface shall be protected against abrasion, impact, discoloration and any
other damages. All exposed threaded portions shall be suitably protected with either a
metallic or a non-metallic protecting device. All ends of all valves and piping and
conduit equipment connections shall be properly sealed with parts which are likely to
COPYRIGHT AND CONFIDENTIAL
get rusted, due exposure to weather should also be properly treated and protected in a
suitable manner. EMI/static charge proof packaging should be used for PLC/Electronic
hardware.
Prepared in the shop, the surfaces that are to be finish painted after installation or
require corrosion protection until installation, shall be shop painted with at least two
coats of primer. Transformers and other electrical equipment, if included shall be shop
finished with one or more coats of primer and two coats of high grade resistance
enamel. The finished colours shall be as per manufacturer’s standards to be selected
and specified by the Engineer at a later stage.
13.2.0 Shop primer for all steel surface which will be exposed to operating temperature below
95C shall be selected by the Contractor. Special high temperature primer shall be
used on surface exposed to temperature higher than 95C.
13.3.0 All other steel surfaces which are not to be painted shall be coated with suitable dust
preventive compound subject to the approval of the Contractor.
14.1.0 Each main and auxiliary item of plant is to have permanently attached to it in a
conspicuous position rating plates of non-corrosive material upon which is to be
engraved manufacturer name, equipment, type or serial number together with details
of the loading conditions under which the item of plant in question has been designed
to operate and such diagram plates as may be required by the Engineer.
Ref. Doc
14.2.0 Each item of plant is to be provided with nameplate or label designing the service of
the particular equipment. The inscriptions are to be approved by the Engineer or as
detailed in the appropriate sections of the Technical Specifications.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
14.4.0 Terms of plant such as valves and dampers, which are subject to handling, are to be
provided with engraved chromium plated or label with engraving filled with enamel. The
nameplates for valves shall be marked in accordance with MSS standard Sp-25 and
ANSI B 16.34 as minimum.
The information on this document is the property of BHARAT HEAVY ELECTRICALS LIMITED .
a) GA drawing (shall include weld end details, outline dimensions and other
terminal details) for BHEL review and approval.
e) Detailed velocity calculation across each discrete stage for BHEL review and
approval.
f) Catalogue for valve, actuator and accessories. Model nos. chosen shall be
marked on the catalogues.
g) Quality plans and reference documents (if other than international standards
are referred)
h) Test Procedure for the following tests to be submitted for BHEL review and
approval.
1. Performance Test
2. Seat leakage Test
3. Cv Type Test
a) GA drawing (shall include weld end details , outline dimensions and other
terminal details) for BHEL review and approval.
b) Sectional drawing (including part list with Material of construction) & Data
Sheet for BHEL review and approval.
c) Hook-up diagram of Control Valve with Actuator & Accessories.
d) Valve Edge preparation details.
e) All calculations like CV & anti-cavitation calculations, Noise Level, Trim Exit
Velocity, Valve Outlet Velocity, Actuator sizing etc.
f) All relevant catalogues for the models of the valves as well as accessories
finalized.
g) O & M instructions.
h) Preservations and storage instruction write up for valve and its accessories.
i) Detailed velocity calculation across each discrete stage for BHEL review and
approval.
j) Quality plans shall be in BHEL format
Ref. Doc
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
17.0.0 Quality Assurance plan of Control valve & actuators shall be as per BHEL
format.
19.0.0 SPARES
(A) Mandatory spares to be considered as separate package. Mandatory spares to be
packed in different color & shipped separately. Marking on mandatory spares must be
in different color from main supply so that these are easily identifiable at site.
(B) Recommended Spares:
In addition to the Mandatory spares mentioned, the bidder shall also furnish a List of
Recommended spares for 3 years of normal operation of the Control valves/
Accessories. BHEL/Customer reserves the right to buy any or all of the recommended
spares. The prices of these spares will remain valid for a period of minimum 6 months
after the placement of order.
(C) Start-up & Commissioning Spares:
Start-up and Commissioning spares are those spares, which may be required during
the start-up and commissioning of the Control Valves. All start-up spares, which are
supplied under this contract, shall be strictly interchangeable with the parts for which
they are intended for replacements. The format for price schedule to be filled-up by the
bidder is enclosed in Volume-III.
The Start-up and commissioning spares indicated by the bidder shall be a part of the
main Control valves supply. However bidder to indicate prices separately. The list of
these spares required is enclosed in the section-D of this specification.
Bidder to indicate the service life expectancy period for the spare parts under
Ref. Doc
normal working conditions. The spares shall be treated and packed for long storage,
under climatic conditions prevailing at site. Small items shall be packed in sealed
transparent plastic bags with desiccators’ packs as necessary.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-2
FIGURE-1
(OUTLINE DIM. OF RC VALVE)
The information on this document is the property of BHARAT HEAVY ELECTRICALS LIMITED .
It must not be used directly or indirectly in any way detrimental to the interest of the company.
COPYRIGHT AND CONFIDENTIAL
Note: Dimension (in mm) to be furnished by vendor along with technical Offer.
Ref. Doc
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.
Rev No. 5
PRODUCT STANDARD FP60300
TD-106-3
Form No.
PUMPS Rev No. 07
HYDERABAD PAGE 17 of 17
RECORD OF REVISIONS
Rev.
Date Revision Details Revised By Approved By
No.
clause no 2.0.0.
Var 05 and spares list for Var 05 added.
04 19.09.2019 K.Sangeetha. KHRK
Spec generally revised.
Mar Tue 10 13:41 2020 This Drawing is printed from Engineering Digital Archive System (EDAS).
Therefore signatures are not essentially required.