1
1
1
(b) = 378 kN
Total compressive force in the bottom 18mm of slab
= 180.00 kN
( c) Total compressive force in the top 18mm of the key
Mu = [4760x1205+378x1111+180x1111-2384.47x68-1987.06x118-
168x397.059-521x189.656-909x359.804] Mu =
= 5565.35 kNm 5565 kNm
Mu > Muls
Hence ok
Lever arm z = Mu
Total compressive force
= 5565.35
4760.0 + 378 + 180.00 z =
= 1046.5 mm 1047 mm
mm
2
Abeam = 418150 yb = 459 mm
6.02E+10 mm Zb = 131154684 mm
4
Ibeam =
3
61
Reference Discription & Calculation Results
592950 mm
2
Acomposite = ybcomposite = 676 mm
1.27E+11 mm 1.88E+08 mm
2
Icomposite = Zbcomposite =
3
= 0.3x50
0.667
fctm = 4.1 Mpa 6
fctk,0.05 = 0.7xfctm = 2.9
fctd = (2.9/1.5) = 1.93 Mpa
x , ,
x
x0.5x
. . . .
-1.93 x0.5x 24.54 10
. . .
62
Reference Discription & Calculation Results
x - 24.54x + 121.68 = 0
2
The section should be treated as cracked from 6.9 m from the supports
Then,
with,
63
Reference Discription & Calculation Results
Distance X VEd,precast VEd,composite MEd,precast MEd,composite
0.23 256.83 524.34 23.63 261.26
1 240.84 519.78 220.84 495.57
2 219.92 361.01 461.38 751.13
3 199.06 294.15 681.54 995.86
4 178.18 238.08 880.27 1225.38
5 157.27 174.84 1062.13 1423.93
6 136.42 159.3 1212.02 1629.11
7 115.51 143.89 1344.83 1800.8
8 94.58 138.13 1455.53 1952.35
9 73.64 131.97 1544.09 2082.12
10 52.67 132.64 1610.51 2185.13
11 31.69 118.31 1654.77 2253.4
12 10.7 110.94 1676.84 2281.26
12.5 0.136 36.354 1679.58 2274.3
681.54 10
676 459
6.02 10
= 2.46 Mpa
Stress at composite centroid due to prestress
,
= 2.46 + 5.43
= 7.89 Mpa
First moment of area of the bottom flange and chamfer about the precast
section neutral axis
64
Reference Discription & Calculation Results
Apczpc = 152440x239
160 6.02E+10
= 0.97 Mpa
1.27 10 x160
1.93 1.93 x7.89 0.75
327409 388
= 576.39 kN
= 199.06 + 576.39
= 775.45 kN
Stress at top of precast unit due to the moment acting on the beam
681.54 10
1120 459
6.02 10
= 7.48 Mpa
Stress at top of precast unit due to prestress
65
Reference Discription & Calculation Results
= -3.0 Mpa
Stress at top of precast unit due to the moment acting on the composite
section
995.86 10
1120 676
1.27 10
= 3.48 Mpa
, ,
= 7.48 + -3.0 + 3.48
= 8.0 Mpa
The shear stress at the top of precast unit from shear acting on the precast
beam alone
0 Mpa
It is assumed here that the only shear connection between precast unit and
in situ slab is across the 300mm wide portion at the precast unit
First moment of area of the deck slab about the composite section neutral
axis
Aez = 200x1000x(1270-100-676)
= 1E+08 mm
3
1.27 10 x160
1.93 1.93 x8 0
0.988 10
= 900.36 kN
= 0 + 900.36
= 900.36 kN
Check at bottom of 160mm thick web
66
Reference Discription & Calculation Results
Stress at bottom of 160mm thick web due to the moment acting on the
beam
681.54 10
290 459
6.02 10
= -1.9 Mpa
995.86 10
290 676
1.27 10
= -3 Mpa
, ,
= -1.9 + 12.8 + -3
= 7.8 Mpa
First moment of area of the bottom flange and chamfer about the precast
section neutral axis
Apczpc = 185x950x(459-185/2)+105x240x(459-185-105/2)
= 7E+07 mm
3
67
Reference Discription & Calculation Results
= 199.06 x 10 x 69994175
3
160 6.02E+10
= 1.45 Mpa
First moment of area of the deck slab about the composite section neutral
axis
Aez = 185x950x(676-185/2)+105x240x(676-185-105/2)
= 1E+08 mm
3
1.27 10 x160
1.93 1.93 x7.8 1.45
1.136 10
= 515.77 kN
= 199.06 + 515.77
= 714.83 kN
Considering the above three values bottom of the web gives the critical
shear capacity for uncracked in bending condition
BSEN 1992-1-1
2004
Cl 6.2.2(1)
Where,
CRd,c = 0.18/ϒc = 0.18/1.5 = 0.12
fck = 50 Mpa
fcd = 1x50/1.5 = 33.3 Mpa
k1 = 0.15
All strands are in the tensile zone
d = 1290-yb+e (Effective depth)
68
Reference Discription & Calculation Results
= 1290-459+286
= 1117 mm
= 3753 mm (Area of tensile reinforcement)
2
As1 = 27x139
200 200
k = 1 = 1
1117
= 1.423 < 2
0.2
0.035
0.035 1.423 50
= 0.42 Mpa
3995.8 10
418150
> (0.45+0.15x6.67)160x870x10
-3
69
Reference Discription & Calculation Results
= 322.71 > 253.81
VRd,c(B) = 322.71 kN
BSEN 1992-1-1
2004
,
1.5 cot tan
Cl 6.2.3(3) Where,
v1 = Strength reduction factor for concrete cracked in shear
f 50
v 0.6 1 = 0.6 1 = 0.48
250 250
70