Interim Payment ? Correct Name ?: Webinar: Preparation O F Interim Valuation Session Id: Ip&Es-Qs-T05
Interim Payment ? Correct Name ?: Webinar: Preparation O F Interim Valuation Session Id: Ip&Es-Qs-T05
Interim Payment ? Correct Name ?: Webinar: Preparation O F Interim Valuation Session Id: Ip&Es-Qs-T05
Consultant needs to check & certify that all Contractor needs to make sure that work is
done according to the specifications & designs
works are done according to the specifications
& design
Needs to include the actual works carried at
Need to measure & certify the payments are made only site with all required supportings to prove.
for the Works Completed
Thus Consultant required be satisfied by checking & Burden of proof lays with the Contractor
inspecting all relevant proofs. (upon request of Engineer clause 12.1 and
under obligation of clause 14.3, Submission of
statement)
20 May 2020 20 May 2020
5/20/2020
“the estimated contract value of the Works executed and the “any amounts to be added and deducted for changes in
Contractor’s Documents produced up to the end of the month legislation and changes in cost, in accordance with Sub-
(including Variations but excluding items described in sub- Clause 13.6 [Adjustments for Changes in Legislation] and
paragraphs (b) to (g) below)”
Sub-Clause 13.7 [Adjustments for Changes in Cost];”
Include
(a) Value of Measured Work Contractor entitled subject to Notice under Sub-Clause 19.1for
(b) Any Variation legislation changes.
Exclude Calculation based on price adjustment formula under Sub-
(a) Additional amounts due Price Escalation and Changes in Legislation. Clause 13.7
(b) Claims
If the effect of legislation changes are not reflected in price
(c) Material on Site
adjustment formula then Engineer shall determine the value.
20 May 2020 20 May 2020
RETENTION & REPAYMENT OF ADVANCE PLANT AND MATERIALS INTENDED FOR THE WORKS
15 16
RETENTION
“any amount to be deducted for retention, calculated by applying the “any amounts to be added and deducted for Plant and Materials in
percentage of retention stated in the Contract Data to the total of the above accordance with Sub-Clause 14.4 [Plant and Materials intended for the
amounts, until the amount so retained by the Employer reaches the limit of Works];”
Retention Money (if any) stated in the Contract Data;” SBD
REPAYMENT OF ADVANCE An amount equivalent to 80 % of the invoiced value of plant and Material s
any amounts to be added and deducted for the advance payment and which have been delivered to site for incorporation in the Permanent works
repayments in accordance with Sub-Clause 14.2 [Advance Payment];
will not applicable for SBD 04 contract and if the Payment schedule are
applicable on deciding contract value where Plant and Materials intended for
the Works shall be indicated in payment schedule
20 May 2020 20 May 2020
5/20/2020
PLANT AND MATERIALS INTENDED FOR THE WORKS CLAIMS, DISPUTES AND ARBITRATION
17 18
the Contractor has to: “any other additions or deductions which may have become
due under the Contract or otherwise, including those under
kept satisfactory records (including the orders, Clause 20 [Claims, Disputes and Arbitration]; and”
receipts, Costs and use of Plant and Materials) which
are available for inspection, and
If Engineer required work to be measured reasonable notice shall Measurement shall be made of the net actual quantity of each
given to the Contractor to attend measurement jointly and
item of the permanent works and
provide if any particulars request by the Engineer
Principles of measurement as described in the Contract Data
If Contractor fails to attend or send representative, (Standard Method of Measurement)
Then the Measurement made by the Engineer shall be
accepted as accurate Principles of Measurement as specified in Preamble notes
Schedule to be pre agreed either during the tender, during the If the Payment Delayed more than 35 days Contractor entitled to
negotiation or during post contract stage. receive financing charges
Can be based on CIDA Guideline for the Preparation of Bill No 1
Preliminaries for the Building Works (ICTAD/ID/04) Financial charges Calculated monthly
Can be derived from Contractors Overhead Calculation on the amount unpaid during the period of delay.
Items may be categories as
1% Above the lending rate of the Central Bank Rate
Mobilization
Reimburse on actual cost as an when incurred Without need of notice, and without
Equal installment over contract period
prejudice to any other right or remedy.
Reimburse on completion of activity
Mutually agreed between contractor and employer
Demobilization
20 May 2020 20 May 2020
5/20/2020
Rate Analysis … Quotations & Bills Site instructions & log notes,
Any variations which has to be claimed under a new Time to time many instructions & required new
rate, copy of the approved rate breakdown need to details may issue by the Engineer during site visits.
attach along with the applicable valid quotations &
bills. It is important to include copies of such details
along with the IPAs for the verification during the
certification process.