PHYSICAL ACCOMPLISHMENT REPORT

PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)


LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *Portion of wall on CR was damaged
OWNER: JAVANA TOMON
BLOCK: 1
LOT: 1

% WEIGHT % WEIGHT COMMENTS/


ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS
PLANNED ACTUAL REMARKS:
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
*Kalacat walling in CR
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete (not finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE

*2.00 pcs. of faucets


Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
not installed
a.
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete *No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *Portion of wall was damaged
OWNER: CHARLIE ELI
BLOCK: 1
LOT: 2

% WEIGHT % WEIGHT COMMENTS/


ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS
PLANNED ACTUAL REMARKS:
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete (not finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
a. not installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
*All parts of CR was damaged including toilet
PROJECT COST: PHP. 99,996.65 NOTE: bowl
OWNER: ALEX TOMON
BLOCK: 1
LOT: 3

% WEIGHT % WEIGHT COMMENTS/


ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS
PLANNED ACTUAL REMARKS:
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete
b. (not finished)
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
a. not installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *One-side of CHB wall was about to collapse
OWNER: REMEGILDO E. ELI *Kitchen Sink is totally damage
BLOCK: 1 *One-side of CR partially damaged
LOT: 4

% WEIGHT % WEIGHT
ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS COMMENTS/ REMARKS:
PLANNED ACTUAL
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR (not
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets not
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
a. installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *One-side of CHB wall was collapsed
OWNER: JERRY BETIL *Kitchen sink is totally damaged
BLOCK: 1 *One-side of CR was about to collapsed
LOT: 5

% WEIGHT % WEIGHT COMMENTS/


ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS
PLANNED ACTUAL REMARKS:
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete (not finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
a. not installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *One-side of wall was damaged
OWNER: RODRIGO BANQUIL *Kitchen sink barred down
BLOCK: 1
LOT: 6

% WEIGHT % WEIGHT COMMENTS/


ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS
PLANNED ACTUAL REMARKS:
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete (not finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
a. not installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *One-side of CHB wall was totally damaged
OWNER: RIZALDO MANTAWIL SR. *CR was partially damaged
BLOCK: 1 *Kitchen sink was totally damaged
LOT: 7

% WEIGHT % WEIGHT
ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS COMMENTS/ REMARKS:
PLANNED ACTUAL
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR (not
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets not
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
a. installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *Two-sides of CHB wall was totally damaged
OWNER: REBCCA M. BETIL *Kitchen sink was totally damaged
BLOCK: 1
LOT: 8

% WEIGHT % WEIGHT
ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS COMMENTS/ REMARKS:
PLANNED ACTUAL
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR (not
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets not
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
a. installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *Three-sides of CHB wall was totally damaged
OWNER: ROGER AROS *CR was partially damaged
BLOCK: 1 *Kitchen sink was totally damaged
LOT: 9

% WEIGHT % WEIGHT
ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS COMMENTS/ REMARKS:
PLANNED ACTUAL
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 28.06% 0.00% COMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
b. Kalacat Walling & Studdings 10,540.00 10.54% 10.54% 0.00% complete
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets not
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete installed
a.
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 71.42% 5.50% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.43% 1.65% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 92.85% 7.15% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *Kitchen sink was totally damaged
OWNER: ROLLY ENOG *CHB wall was partially damaged
BLOCK: 1
LOT: 10

% WEIGHT % WEIGHT COMMENTS/


ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS
PLANNED ACTUAL REMARKS:
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 26.82% 1.24% INCOMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
Kalacat walling in CR
Kalacat Walling & Studdings 10,540.00 10.54% 9.30% 1.24% incomplete (not finished)
b.
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets
a. Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete
not installed
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 70.18% 6.74% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.05% 2.02% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 91.24% 8.76% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *One-side of CHB wall was totally damaged
OWNER: SAMMY OLOY *Kitchen sink was partially damaged
BLOCK: 1 *CR was partially damaged
LOT: 11

% WEIGHT % WEIGHT COMMENTS/


ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS
PLANNED ACTUAL REMARKS:
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 28.06% 0.00% COMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
b. Kalacat Walling & Studdings 10,540.00 10.54% 10.54% 0.00% complete
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE
2.00 pcs. of faucets not
Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete installed
a.
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 71.42% 5.50% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.43% 1.65% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 92.85% 7.15% INCOMPLETE
PHYSICAL ACCOMPLISHMENT REPORT
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 99,996.65 NOTE: *Kitchen sink was totally damaged
OWNER: REYNALDO ENOG *Three-sides of CHB wall was totally damaged
BLOCK: 1
LOT: 12

% WEIGHT % WEIGHT
ITEM NO. DESCRIPTION AMOUNT % VARIANCE STATUS COMMENTS/ REMARKS:
PLANNED ACTUAL
I. CONCRETE WORKS 17,930.00 17.93% 17.93% 0.00% COMPLETE
II. MASONRY WORKS 11,190.00 11.19% 11.19% 0.00% COMPLETE
III. WOOD WORKS 28,062.00 28.06% 28.06% 0.00% COMPLETE
a. Full Truss 10,160.00 10.16% 10.16% 0.00% complete
b. Kalacat Walling & Studdings 10,540.00 10.54% 10.54% 0.00% complete
c. Door/Window Jamb 3,400.00 3.40% 3.40% 0.00% complete
d. Doors & Windows 2,152.00 2.15% 2.15% 0.00% complete
e. Scafoldings 1,810.00 1.81% 1.81% 0.00% complete
IV. TINSMITHRY WORKS 6,110.00 6.11% 6.11% 0.00% COMPLETE
V. PLUMBING WORKS 10,328.50 10.33% 4.83% 5.50% INCOMPLETE

Plumbing Fixtures 920.00 0.92% 0.67% 0.25% incomplete *2.00 pcs. of faucets not installed
a.
b. Sanitary/Water Lines 3,581.00 3.58% 3.58% 0.00% complete
c. Septic Tank 5,827.50 5.83% 0.58% 5.24% incomplete *No walls and slab
VI. FENESTRATIONS 1,350.00 1.35% 1.35% 0.00% COMPLETE
VII. ACCESSORIES 1,950.00 1.95% 1.95% 0.00% COMPLETE
TOTAL MATERIAL COST: 76,920.50 76.92% 71.42% 5.50% INCOMPLETE
TOTAL LABOR COST: 23,076.15 23.08% 21.43% 1.65% INCOMPLETE
TOTAL PROJECT COST: 99,996.65 100.00% 92.85% 7.15% INCOMPLETE
BLOCK 1 BLOCK 2
Lot 1 91.24% 8.76% Lot 1 82.73%
Lot 2 91.24% 8.76% Lot 2 82.73%
Lot 3 91.24% 8.76% Lot 3 82.73%
Lot 4 91.24% 8.76% Lot 4 91.24%
Lot 5 91.24% 8.76% Lot 5 91.24%
Lot 6 91.24% 8.76% Lot 6 91.24%
Lot 7 91.24% 8.76% Lot 7 87.58%
Lot 8 91.24% 8.76% Lot 8 79.71% 1.00
Lot 9 92.85% 7.15% Lot 9 90.51%
Lot 10 91.24% 8.76% Lot 10 87.43%
Lot 11 92.85% 7.15% Lot 11 91.15%
Lot 12 92.85% 7.15% Lot 12 84.67%
91.64% 8.36% Lot 13 90.56%
Lot 14 85.84%
87.10%

0.00 1.00
BLOCK 3 BLOCK 4
Lot 1 92.31% Lot 1 97.29%
Lot 2 90.48% Lot 2 85.89%
Lot 3 90.02% Lot 3 96.88%
Lot 4 89.43% Lot 4 98.74%
90.56% Lot 5 97.03%
Lot 6 97.03%
Lot 7 95.17%
Lot 8 96.27%
Lot 9 88.35%
Lot 10 89.44%
94.21%

- 0.00

90.49%
BLOCK 5
Lot 1 81.79%
Lot 2 92.85%
Lot 3 91.15%
Lot 4 92.85%
Lot 5 92.69%
Lot 6 88.08%
Lot 7 91.15%
Lot 8 86.60%
Lot 9 90.76%
Lot 10 81.79%
88.97%

0.00 1.00
PHYSICAL ACCOMPLISHMENT REPORT SUMMARY
PROJECT: MALUMPINE IP VILLAGE (MALUMPINE TRIBAL VILLAGE)
LOCATION: SITIO MALUMPINE, BRGY. OLD BULATUKAN, MAKILALA, COTABATO
PROJECT COST: PHP. 4,999,832.50

% WEIGHT % WEIGHT
ITEM NO. DESCRIPTION AMOUNT
PLANNED ACTUAL
I. CONCRETE WORKS 896,500.00 17.93% 17.93%
II. MASONRY WORKS 559,500.00 11.19% 11.19%
III. WOOD WORKS 1,403,100.00 28.06% 28.06%
a. Full Truss 508,000.00 10.16% 10.16%
b. Kalacat Walling & Studdings 527,000.00 10.54% 10.54%
c. Door/Window Jamb 170,000.00 3.40% 3.40%
d. Doors & Windows 107,600.00 2.15% 2.15%
e. Scafoldings 90,500.00 1.81% 1.81%
IV. TINSMITHRY WORKS 305,500.00 6.11% 6.11%
V. PLUMBING WORKS 516,425.00 10.33% 4.83%
Plumbing Fixtures 46,000.00 0.92% 0.67%
a.
b. Sanitary/Water Lines 179,050.00 3.58% 3.58%
c. Septic Tank 291,375.00 5.83% 0.58%
VI. FENESTRATIONS 67,500.00 1.35% 1.35%
VII. ACCESSORIES 97,500.00 1.95% 1.95%
TOTAL MATERIAL COST: 3,846,025.00 76.92% 71.42%
TOTAL LABOR COST: 1,153,807.50 23.08% 21.43%
TOTAL PROJECT COST: 4,999,832.50 100.00% 92.85%
T SUMMARY

% VARIANCE STATUS COMMENTS/ REMARKS:

0.00% COMPLETE 17,930.00


0.00% COMPLETE 11,190.00
0.00% COMPLETE 28,062.00
0.00% complete 10,160.00
0.00% complete 10,540.00
0.00% complete 3,400.00
0.00% complete 2,152.00
0.00% complete 1,810.00
0.00% COMPLETE 6,110.00
5.50% INCOMPLETE 10,328.50
0.25% incomplete *2.00 pcs. of faucets not installed 920.00

0.00% complete 3,581.00


5.24% incomplete *No walls and slab 5,827.50
0.00% COMPLETE 1,350.00
0.00% COMPLETE 1,950.00
5.50% INCOMPLETE 76,920.50
1.65% INCOMPLETE 23,076.15
7.15% INCOMPLETE 99,996.65