Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Ablutions / Booths / Aprtments / Ancillary / Change Room Platform Layer Details

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RDC-Africa

VARIES
(500-2500) 75mm Concrete Slab 30MPa
125mm Concrete Slab 30MPa 125mm Concrete Slab 30MPa
(Refer to structural drawings for detail) (Refer to structural drawings for detail)
(Refer to structural drawings for detail)
Private Bag X2067
SLOPE 2% LVL 99.250 LVL 99.250 LVL 99.15 Krugersdorp
South Africa 1740

250
125

250
125
CONSULTANT:

75
150
200
50 75
125
125

125
LVL 99.000
LVL 99.000 LVL 99.000 125mm Thick G6 / in-place material
125mm Thick G5 material stabilized stabilized with 3% cementcompacted to CONSULTING ENGINEERS
125mm Thick G5 material stabilized (LVL 98.950) 93% maximum dry density (MDD). Specialists in Structural and Civil Engineering
with 3% cement compacted to 93% with 3% cement compacted to 93%
maximum dry density (MDD) Rip, blend and mix 50mm of the platform
maximum dry density (MDD) PO BOX 453 TEL +27 11 822 5252
material with the imported G6 material
BEDFORDVIEW FAX +27 11 822 5272
and cement. (Rip down to 98.950)
2008
Note: Cut / fill platform compacted to 90% Cut / fill platform compacted to 90%
maximum dry density (MDD) Cut / fill platform compacted to 90% Email: info@mrhce.co.za
Surface bed slab must remain at 125mm thickness around the maximum dry density (MDD) Website: www.mrhce.co.za
perimeter even though it falls at 2%. maximum dry density (MDD)

• Width 500mm then it falls 10mm.


• Width 1500mm then it falls 30mm.
• Width 2500mm then it falls 50mm. 7 Ablutions / Booths / Aprtments / Ancillary / 1
Pathways Platform Layer Details
SCALE: 1 : 10
It is important that the 10mm or 30mm or 50mm is “sliced off” carefully
in a straight line from the top of the stabilized G5 layer below. Change Room Platform Layer Details ISSUED FOR
SCALE: 1 : 10

8
Auditorium Platform Layer Details COORDINATION
SCALE: 1 : 10 PLEASE VERIFY ALL DIMENSIONS ON SITE
AND REPORT ANY DISCREPANCIES

Existing Three At Tapers at exit from carriagway New Widened Assembly Hall
Lane North Bound and across onto carriageway Layerworks Property
Carriageway
150 1400 Varies

50mm Asphalt cement (AC) continously graded.


(Premix, 19mm nominal aggregate size)

Pathway surface to match existing. Re-use removed kerb or install new 1,5m wide pathway.
kerb to match existing. Pathway surface to match existing one
adjacent to carriageway.
Trim back existing asphalt by 150mm

2% Slope 2% Slope Re-use removed kerb or install new


kerb to match existing.

50
G2 Crushed rock compacted to 86%

150
Remove Existing Kerb for Re-Use
apparent relative density (ARD)

G4 Material stabilized with 3% cement for

150
C3 layer (uCS 750kPa) and compacted to
95% maximum dry density (MDD)

400 225

150
G5 Material compacted to 93%
min. Step min. Step maximum dry density (MDD)

225 225
Existing
Layerworks In-situ material compacted to 90%
maximum dry density (MDD)
A 03-11-2018 FOR COMMENT

B 06-11-2018 FOR COMMENT

C 21-11-2018 FOR ESTIMATING

D 30-11-2018 FOR COMMENT

E 01-02-2019 FOR COMMENT

F 06-03-2019 FOR COORDINATION


2
Carriageway Widening Detail & Layerworks MARK: DATE: DESCRIPTION:
SCALE: 1 : 10 OWNER:

Associação das
Testemunhas de Jeová
50mm Asphalt cement (AC) continously graded. Caixa Postal 6877
(Premix, 19mm nominal aggregate size) Luanda, Angola

PROJECT TITLE:

50
//

30 MPa Concrete Luanda Sul


175

150
Y10 @ 300mm centre to centre both G2 crushed rock compacted to 86%
Slurry seal using 6,7mm nominal.
apparent relative density (ARD) Assembly Hall
//

ways in centre Stone size (11mm average thickness)


220ℓ / m³ of 60% emulsion & 1% Cement
150

150
G4 Material stabilized with 3% cement for G4 Material stabilized with 3% cement for
C3 layer (uCS 750kPa) and compacted to C3 layer (uCS 750kPa) and compacted to

150 10
BAIRRO SAPU LOTE NO 13
95% maximum dry density (MDD) 95% maximum dry density (MDD)
G4 / G5 Material stabilized with 2% SHEET TITLE:
150

150
G5 Material compacted to 93% cement and compacted to 95% G5 Material compacted to 93%
maximum dry density (MDD) maximum dry density (MDD) maximum dry density (MDD) LAYERWORKS CROSS
SECTION DETAILS
In-situ material from cut / fill operation.
In-situ material from cut / fill operation. Compacted to 93% maximum dry In-situ material compacted to 90%
Compacted to 90% maximum dry density (MDD) maximum dry density (MDD)
density (MDD)

SCALE:

1 : 10
PROJECT No.

6
Entrance Road & Turning Circle Layerworks 5
Parking Area Pavement Layerworks 3
Carriageway Layerworks AGO0391 - B00 - 01
SCALE: 1 : 10 SCALE: 1 : 10 SCALE: 1 : 10
SUB - PROJECT No.

B00 - SITE PLAN


SHEET No. REV
PRINTABLE AREA
MEDIA SIZE 841 x 594 (A1)

CG - 102 F