CLIENT: INDEPENDENT ENGINEER : CONCESSIONARE: EPC CONTRACTOR : DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
Balanced Four Laning Work of Package -3 DRG. NO. CIPL/D1041/STR/DEG/MJB/012
REINFORCEMENT DRAWING FOR MAJOR BRIDGE
from Km 270.000 (near Shelad)
to Km 315.000 (Near Nandura) Section of
OF DIAPHRAGM, AT CHAINAGE 283+683,SPAN DATE : APRIL 2020 REV: D0
DRAFT SUBMISSION
Amravati - Chikhli NH-6 in the state of LENGTH OF 4X17M DESIGNED DRAWN CHECKED APPROVED
D0 APRIL 2020
NATIONAL HIGHWAYS Maharashtra to be executed as Hybrid
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA MONTECARLO LIMITED MONTECARLO LIMITED CIVILMANTRA INFRACON PVT LTD. Annuity Project Under NHDP Phase IV. SCALE : AS SHOWN PAPER SIZE : A3