The basis for the correct fuel injection timing and the valve mechanism operation is determined by the
alignment of the timing for the front gear group. Timing marks (1) and timing marks (6) are aligned in
order to provide the correct relationship between the piston movement and the valve movement.
2 de 5 26/05/2010 12:35
C-15 Industrial Engine BEM00001-UP(SEBP3261 - 40) - Document Str... https://sis2001.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?...
1. Remove the front cover. Refer to Disassembly and Assembly, "Housing (front) - Remove".
Illustration 2 g01361879
(9) Nuts
2. Remove the adjustable idler gear from stub shaft (10) . The stub shaft is held in position with five
3 de 5 26/05/2010 12:35
C-15 Industrial Engine BEM00001-UP(SEBP3261 - 40) - Document Str... https://sis2001.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?...
nuts (9) and one bolt. Loosen each of the five nuts and loosen the one bolt.
Illustration 3 g01361883
(9) Nuts
(11) Bolt
3. Install Tooling (A) onto the engine. Refer to Illustration 3 in order to correctly position the gear
gauge. Ensure that the gear gauge is seated correctly. Lightly tighten each of the nuts and the bolt in
order to loosely secure the stub shaft to the engine. Once the nuts and the bolt are tightened, lightly
tap the gear gauge with a rubber mallet on each side. This will ensure that the tool is properly
seated. The gear gauge should be free to move in and out without any binding. Tighten the nuts and
the bolt to a torque of 55 ± 10 N·m (41 ± 7 lb ft).
4 de 5 26/05/2010 12:35
C-15 Industrial Engine BEM00001-UP(SEBP3261 - 40) - Document Str... https://sis2001.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?...
Illustration 4 g01361884
Checking backlash
4. Install Tooling (B) on the timing gear housing. Measure the backlash between camshaft gear (2) and
idler gear (3) . When the idler gear is held stationary, the backlash between the gears is 0.216 ±
0.114 mm (0.0085 ± 0.0045 inch).
5. If necessary, repeat step 2 through step 4 until the correct backlash is obtained.
6. Install the front cover. Refer to Disassembly and Assembly, "Housing (Front) - Install".