Cyd Head Install
Cyd Head Install
Cyd Head Install
Previous Screen
Welcome: jvbnat
Product: INDUSTRIAL ENGINE
Model: C9 INDUSTRIAL ENGINE JSC
Configuration: C9 Industrial Engine JSC00001-UP
i02544971
Installation Procedure
Table 1
Required Tools
NOTICE
Keep all parts clean from contaminants.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&called… 1/4
03/02/2021 C9 Industrial Engine JSC00001-UP(SEBP4132 - 95) - Systems & Components
Illustration 1 g01177988
1. Position the gasket on the engine cylinder block. Attach Tooling (A) and a suitable lifting device onto
cylinder head (11). The weight of cylinder head (11) is approximately 181 kg (400 lb). Position cylinder
head (11) on the engine.
Illustration 2 g01177926
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&called… 2/4
03/02/2021 C9 Industrial Engine JSC00001-UP(SEBP4132 - 95) - Systems & Components
Illustration 3 g01063104
2. Apply Tooling (B) to the threads of bolts (10). Install bolts (10).
a. Tighten Bolt (1) through Bolt (26) in a numerical sequence to a torque of 130 ± 15 N·m
(95 ± 11 lb ft).
b. Tighten Bolt (1) through Bolt (26) again in a numerical sequence to a torque of 130 ± 15 N·m
(95 ± 11 lb ft).
c. Place a mark on Bolt (1) through Bolt (26). Rotate Bolt (1) through Bolt (26) in a numerical sequence.
Rotate the bolts in the clockwise direction for 90 degrees (1/4 turn).
d. Loosen Bolt (1) through Bolt (26) until the washers are loose under the bolt heads.
e. Tighten Bolt (1) through Bolt (26) in a numerical sequence to a torque of 130 ± 15 N·m
(95 ± 11 lb ft).
f. Tighten Bolt (1) through Bolt (26) again in a numerical sequence to a torque of 130 ± 15 N·m
(95 ± 11 lb ft).
g. Place a mark on Bolt (1) through Bolt (26). Rotate Bolt (1) through Bolt (26) in a numerical sequence.
Rotate the bolts in the clockwise direction for 90 degrees (1/4 turn).
h. Tighten Bolt (27) through Bolt (31) in a numerical sequence to a torque of 28 ± 7 N·m (20 ± 5 lb ft).
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&called… 3/4
03/02/2021 C9 Industrial Engine JSC00001-UP(SEBP4132 - 95) - Systems & Components
Illustration 4 g01273491
7. Connect hose assembly (4). Connect cable assembly (1). Position support assembly (3) and install bolts (2).
Tighten bolts (2) to a torque of 45 N·m (33 lb ft).
8. Fill the cooling system with coolant. Refer to Operation and Maintenance Manual, "Cooling System Coolant
(ELC) - Change" and Operation and Maintenance Manual, "Capacities (Refill)".
End By:
a. Install the fan drive. Refer to Disassembly and Assembly, "Fan Drive - Install".
b. Install the valve mechanism cover base. Refer to Disassembly and Assembly, "Valve Mechanism Cover
Base - Remove and Install".
c. Install the rocker arm and shaft. Refer to Disassembly and Assembly, "Rocker Arm and Shaft - Install".
Copyright 1993 - 2021 Caterpillar Inc. Wed Feb 03 2021 12:40:47 GMT+0800 (Central Indonesia Time)
All Rights Reserved.
jvbnat
Private Network For SIS Licensees.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&called… 4/4