You are on page 1of 5

Project ProNo.

Page
1

Item
1

Halfen HTA anchor channel - EOTA TR 047 / EN 1992-4, ETA-09/0339


Halfen Design Software HTA, Version 2.80

The design does only apply to the designated HALFEN product. The load bearing capacity of third
party products, appearing to be identical in construction, might differ. For this reason, the
software provider does not extend warranty if non-HALFEN products are used.

System parameters
Anchor channel HTA-CE 40/22P - FV - 300 / 2, 2 Anchor
T-bolt HS 40/22 M 12 FV 4.6
Approval / Design method EOTA TR 047 / EN 1992-4, ETA-09/0339
Shear load Without lever arm
Concrete C25/30, cracked
Surface reinforcement No dense reinforcement
Edge reinforcement Stirrups a ≤ 100 mm and a ≤ 2 c1

h = 225 mm l = 300 mm c11 = 110 mm


cnom = 20 mm
© HALFEN GmbH, Langenfeld, Germany

Adjusting zone ±: Full variability

Loads onto bracket:

Bracket Fx Fy Fz Mx My Mz
[kN] [kN] [kN] [Nm] [Nm] [Nm]
1 0 14.18 -2.7 0 0 0

HTA 2.80
4/17/2020
Project ProNo. Page
2

Item
1

Resulting T-bolt loads


(determined under the assumption of a rigid attachment, design of the attachment by designer):
T-bolt xs.1 /ss NEd VEd T-bolt ss NEd VEd
[mm] [kN] [kN] [mm] [kN] [kN]
1 100 5.49 7.09 2 100 5.49 7.09

Utilization: 87% - Verification successful

Calculation Summary

Verifications for T-bolt


Tension NRd,s,s 33%
Shear VRd,s,s 59%
Combined load NRd,s,s - VRd,s,s 45%

Verifications for cast-in channels


Channel lips - Tension NRd,s,l 26%
Channel lips - Shear VRd,s,l 36%
Combined load NRd,s,l - VRd,s,l 26%

Local flexure of channel MRd,s,flex 36%

Connection anchor - channel (Tension) NRd,s,a,c 46%


Connection anchor - channel (Shear) VRd,s,a,c 49%
Combined load NRd,s,a,c - VRd,s,a,c 57%

Verifications for concrete


Tension - Pull-out failure NRd,p 30%
Tension - Concrete cone failure NRd,c 47%
Tension - Concrete splitting failure NRd,sp N/A
Shear - Pry-out failure VRd,cp 30%
Shear - Concrete edge VRd,c 67%
Shear - Concrete edge failure, load parallel to edge VRd,c90 N/A
Combined load NRd,c,p,sp - VRd,c,cp 87%

Verifications:

Steel

T-bolt
© HALFEN GmbH, Langenfeld, Germany

Maximum tension load (T-bolt): T-bolt 1


NRk,s [kN] Ms NRd,s [kN] N cbEd [kN] N

33.70 2.00 16.85 > 5.49 0.33

Maximum shear load without lever arm (T-bolt): T-bolt 1


VRk,s [kN] Ms VRd,s [kN] V cbEd [kN] V

20.20 1.67 12.10 > 7.09 0.59

Combined load, most unfavorable bolt: 1

HTA 2.80
4/17/2020
Project ProNo. Page
3

Item
1

N cbEd [kN] N =N
cb
Ed /NRd,s V cbEd [kN] V =V
cb
Ed /VRd,s k N
k
+ V
k
1.0 N+V

5.49 0.33 7.09 0.59 2 0.45 < 1.0 0.45

Flexure of channel
Decisive span between Anchor 1 and Anchor 2

NEd,1 [kN] load position [mm]

5.49 80

NEd,2 [kN] load position [mm]

5.49 180
MRk,s,flex [Nm] Ms,flex MRd,s,flex [Nm] M chEd [Nm] flex

1389 1.15 1208 > 438 0.36

Anchor channel, channel lips


Maximum tension load (T-bolt): T-bolt 1

N 0Rk,s,l [kN] Ms,l l,N NRd,s,l [kN] N cbEd [kN] N

38.00 1.80 1.00 21.11 > 5.49 0.26

Maximum shear load (T-bolt): T-bolt 1, Verification 1


V 0Rk,s,l [kN] Ms,l l,V VRd,s,l [kN] V cbEd [kN] V

35.00 1.80 1.00 19.44 > 7.09 0.36

Maximum shear load (T-bolt): T-bolt 1, Verification 2


NRd,s,l [kN] VRd,s,l [kN] red VRd,s,l [kN] V cbEd [kN] V

21.11 19.44 19.44 > 7.09 0.36

Combined load, most unfavorable bolt: 1, Verification 1


N cbEd [kN] M chEd [Nm] V cbEd [kN]
© HALFEN GmbH, Langenfeld, Germany

5.49 438 7.09

k13 k13
N M V k13 N,M + v 1 N,M+V

0.26 0.36 0.36 2 0.26 < 1 0.26

Combined load, most unfavorable bolt: 1, Verification 2


N cbEd [kN] M chEd [Nm] V cbEd [kN]

5.49 438 7.09

HTA 2.80
4/17/2020
Project ProNo. Page
4

Item
1

k13 k13
N M V k13 N,M + v 1 N,M+V

0.26 0.36 0.36 2 0.26 < 1 0.26

Anchor, Connection anchor - channel


Most unfavorable anchor: 1, load position xs1 = 25 mm
NRk,s,a [kN] Ms NRk,s,c [kN] Ms,ca NRd,s,a,c [kN] N aEd [kN] N

31.00 1.80 29.00 1.80 16.11 > 7.43 0.46

Most unfavorable anchor: 1, load position xs1 = 25 mm


VRk,s,a [kN] Ms VRk,s,c [kN] Ms,ca VRd,s,a,c [kN] V aEd [kN] V

35.00 1.80 35.00 1.80 19.44 > 9.59 0.49

Combined load, Most unfavorable anchor: 1, load position xs1 = 25 mm


N aEd [kN] N = N aEd /NRd,s,a,c V cbEd [kN] V = V aEd /VRd,s,a,c k14 N
k14
+ V
k14
1.0 N+V

7.43 0.46 9.59 0.49 2 0.57 < 1.00 0.57

Concrete

Tensile load - Pull-out failure


Most unfavorable anchor: 1, load position xs1 = 25 mm
NRk,p [kN] Mp NRd,p [kN] N aEd [kN] N

37.08 1.50 24.72 > 7.43 0.30

NRk,p(C12/15) [kN] c

17.80 2.08

Tensile load - Concrete cone failure


Most unfavorable anchor: 1, load position xs1 = 25 mm
NRk,c [kN] NRd,c [kN] N aEd [kN]
© HALFEN GmbH, Langenfeld, Germany

Mc N

23.65 1.50 15.77 > 7.43 0.47

k1 hef [mm] N 0Rk,c [kN] ch,s,N ch,e,N ch,c,N re,N

8.00 91 34.72 0.91 0.75 1.00 1.00

HTA 2.80
4/17/2020
Project ProNo. Page
5

Item
1

Shear load - Pry-out failure


Most unfavorable anchor: 1, load position xs1 = 25 mm
VRk,cp [kN] Mc VRd,p [kN] V aEd [kN] V

47.30 1.50 31.53 > 9.59 0.30

k8 NRk,c [kN]

2.00 23.65

Shear load - Concrete edge


Most unfavorable anchor: 1, load position xs1 = 25 mm
VRk,c [kN] Mc VRd,c [kN] V aEd [kN] V

21.60 1.50 14.40 > 9.59 0.67

k12 c1 [mm] V 0Rk,c [kN] ch,s,V ch,c,V ch,h,V re,V

7.50 110 19.76 0.85 1.00 0.92 1.40

Combined load
Most unfavorable anchor: 1, load position xs1 = 25 mm
NRd,p [kN] NRd,c [kN] NRd,sp [kN] VRd,cp [kN] VRd,c [kN] NRd,a [kN]

24.72 15.77 N/A 31.53 14.40 N/A

N aEd [kN] N aEd [kN] N aEd [kN] V aEd [kN] V aEd [kN] N aEd,re [kN]

7.43 7.43 N/A 9.59 9.59 N/A

N,p N,c N,sp V,cp V,c re,a N+V

0.30 0.47 N/A 0.30 0.67 N/A 0.87


© HALFEN GmbH, Langenfeld, Germany

HTA 2.80
4/17/2020