Inspection Flash Report: RFI NO & Date: 1.0 Type of Visit
Inspection Flash Report: RFI NO & Date: 1.0 Type of Visit
Inspection Flash Report: RFI NO & Date: 1.0 Type of Visit
Pre-Inspection Meeting • Visual & Dimensional inspection, Final painting inspection and PMI
testing of the Items.
Intermediate Inspection
Final Inspection
07,39,44,49,53,56,57,60,61,64,65,66,70,71,
98,
99,100,101,102,103,104,106,107,108,113,1 CLAMP 1043
14, 115, 124,125
75,77,78,79,84,90,93,
U BOLT 1082
95,97,
105,106 TEFLON & ACOUSTIC PAD 06
08572-TRHT-AQ-QC-00-OO-206 FRM 03
Inspection Flash Report
inspections were found to be ok as per the drawings, the results were found to be
acceptable.
2. PMI testing of various structural items was also performed in order to know about the
material characteristics. The results were deemed satisfactory. The PMI reports will be
submitted by the vendor later.
3. Final coating inspection of the finished structural items was also performed, DFT
was checked for the top coat randomly by using a calibrated DFT meter
6.0 PHOTOS:
Note:
1.This report must be completed by hand/typed while at the Vendor and E-mailed from the vendor to Inspection
Coordinator and Functional Quality Engineer of Petrofac.
08572-TRHT-AQ-QC-00-OO-206 FRM 03
Inspection Flash Report
2.Any NCR observed during Inspection shall be notified to PECO Quality Engineer within 24 hours of Inspection for issuance
and concurrence.
Inspector detail :
Fahad Ahmad
Name
Signature
30/07/2020
Date
08572-TRHT-AQ-QC-00-OO-206 FRM 03