Residential Construction Schedule Template

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 11

Residential Construction Schedule

C WBS Number Task name / Title Assigned to Planned sta Planned end Deadline
1 ZONING ### 1/28/2021
1.1 Land Use 11/26/2020 1/27/2021
1.2 Easements, Set Backs 11/29/2020 1/28/2021
1.3 Access, Street Improvements 11/29/2020 1/28/2021
1.4 Utilities Available 11/29/2020 1/28/2021
2 HOUSE PLANS 12/1/2020 2/4/2021
2.1 Purchase Standard Plans 12/1/2020 2/1/2021
2.2 Architect Original Drawings 12/2/2020 2/2/2021
2.3 Specifications 12/3/2020 2/3/2021
2.4 Architect Manage Job 12/6/2020 2/4/2021
2.5 Engineer-Loads & Spans 12/6/2020 2/4/2021
2.6 Draftsman 12/6/2020 2/4/2021
3 LOT SURVEY 12/8/2020 2/11/2021
3.1 House & Driveway 12/8/2020 2/8/2021
3.2 Well Locaton 12/9/2020 2/9/2021
3.3 Septic Location 12/10/2020 2/10/2021
3.4 Fire Hydrant & Truck Access 12/13/2020 2/11/2021
3.5 Plot Plan 12/13/2020 2/11/2021
4 FINANCIAL - LOAN ### 2/17/2021
4.1 Land Cost 12/14/2020 2/14/2021
4.2 Interest on Land 12/15/2020 2/15/2021
4.3 Interest on Const. Loan 12/16/2020 2/16/2021
4.4 Points, Etc. 12/17/2020 2/17/2021
5 SEWER & WATER HOOKUP 12/20/2020 2/18/2021
6 HEALTH PERMIT ### 2/22/2021
6.1 Fees 12/20/2020 2/18/2021
6.2 Percolation Test 12/21/2020 2/21/2021
6.3 Soils Engineer 12/22/2020 2/22/2021
7 INSURANCE 12/23/2020 2/23/2021
8 LOT CLOSING COSTS 12/24/2020 2/24/2021
9 BUILDING PERMITS ### 2/25/2021
9.1 Fees 12/27/2020 2/25/2021
9.2 Inspection Schedule 12/27/2020 2/25/2021
10 PRELIMINARY LIST ONLY 12/28/2020 2/28/2021
11 BUILD PHASE 12/29/2020 3/1/2021
12 SPECIAL & DRY IN MATERIALS ### 3/4/2021
12.1 Rough Hardware, Misc. 12/31/2020 3/3/2021
12.2 Lolly Columns 1/3/2021 3/4/2021
12.3 Steel Beams 1/3/2021 3/4/2021
12.4 Rough Lumber, Trusses 1/3/2021 3/4/2021
13 WINDOWS/OPENINGS 1/5/2021 3/10/2021
13.1 Windows, Grills, Screens 1/5/2021 3/8/2021
13.2 Exterior Doors,Screens 1/6/2021 3/9/2021
13.3 Skylights and Light Tubes 1/7/2021 3/10/2021
14 DEMOLITION 1/10/2021 3/11/2021
15 LOT CLEARING 1/10/2021 3/15/2021
15.1 Debris Removal & Clearing 1/10/2021 3/11/2021
15.2 Dump Fee 1/11/2021 3/14/2021
15.3 Bury Stumps, etc. 1/12/2021 3/15/2021
16 DRIVEWAY, rough 1/14/2021 3/18/2021
16.1 Grade 1/14/2021 3/17/2021
16.2 Base Rock, Culverts 1/17/2021 3/18/2021
17 UTILITIES 1/17/2021 3/21/2021
17.1 Temporary at startup 1/17/2021 3/18/2021
17.2 Transfer to permanent 1/18/2021 3/21/2021
18 WELL or PUBLIC WATER 1/19/2021 3/22/2021
19 SEPTIC or PUBLIC SEWER 1/20/2021 3/23/2021
20 LAYOUT HOUSE FOOTPRINT 1/24/2021 3/25/2021
20.1 Establish Finish Floor Height 1/24/2021 3/25/2021
20.2 Set Back Distances 1/24/2021 3/25/2021
21 DIG FOUNDATION 1/24/2021 3/25/2021
22 ROCK PROBLEM 1/25/2021 3/28/2021
23 PREPARE FOR FOOTINGS 1/27/2021 3/31/2021
23.1 Lay out and excavate 1/27/2021 3/30/2021
23.2 Form, Rebar, Grade Pegs 1/28/2021 3/31/2021
24 POUR FOOTINGS & PADS 1/31/2021 4/1/2021
24.1 Yds. of Concrete 1/31/2021 4/1/2021
25 SET BRICK POINTS 1/31/2021 4/1/2021
26 TERMITE TREATMENT 2/1/2021 4/4/2021
27 RADON CONTROL 2/2/2021 4/5/2021
28 FOUNDATION WALLS 2/4/2021 4/12/2021
28.1 Block/Course 2/4/2021 4/7/2021
28.2 Piers 2/7/2021 4/8/2021
28.3 Pour Wall, Yds. Of Concrete 2/7/2021 4/8/2021
28.4 Lintels, Rebar 2/7/2021 4/8/2021
28.5 Parging 2/8/2021 4/11/2021
28.6 Cement, Sand, etc. 2/9/2021 4/12/2021
29 WATERPROOF FOUNDATION. 2/10/2021 4/13/2021
30 COLUMNS/BEAMS SET 2/11/2021 4/14/2021
31 UNDERGROUND PLUMBING 2/14/2021 4/15/2021
32 BRICK/STONE, to finish grade 2/14/2021 4/15/2021
33 GARAGE DOORS 2/15/2021 4/19/2021
33.1 Openers 2/15/2021 4/18/2021
33.2 Trim, Backing, Weatherstrip 2/16/2021 4/19/2021
34 DRAIN TILE 2/17/2021 4/20/2021
35 FIRE PLACE - INTERIOR 2/21/2021 4/22/2021
35.1 Pour Hearth 2/21/2021 4/22/2021
35.2 Firebox, or Set Prefab 2/21/2021 4/22/2021
35.3 Brick or Stone Facing 2/21/2021 4/22/2021
36 PREPARE CONC. SLABS ETC. 2/23/2021 4/29/2021
36.1 Gravel, Wire, Poly, Grade Stakes 2/23/2021 4/26/2021
36.2 Labor to Prepare for Slab 2/24/2021 4/27/2021
36.3 Rebar, Wire, form boards 2/25/2021 4/28/2021
36.4 Labor-Prepare, Form other Conc. 2/28/2021 4/29/2021
36.5 Deck & Post Hole footings, etc. 2/28/2021 4/29/2021
37 POUR CONCRETE-SLABS 3/1/2021 5/3/2021
37.1 Concrete 3/1/2021 5/2/2021
37.2 Rebar, Wire, form boards 3/2/2021 5/3/2021
38 SPECIAL BACKING, BLOCKING 3/3/2021 5/4/2021
39 BACK FILL, rough 3/4/2021 5/5/2021
40 CHIMNEY, exterior 3/7/2021 5/9/2021
40.1 Block, Flue 3/7/2021 5/6/2021
40.2 Brick, Stone 3/7/2021 5/6/2021
40.3 Prefab Fireplace & Piping 3/8/2021 5/9/2021
41 FIRE SPRINKLER SYSTEM 3/9/2021 5/10/2021
42 ROUGH-IN PLUMBING 3/11/2021 5/13/2021
42.1 Waste 3/11/2021 5/12/2021
42.2 Water 3/14/2021 5/13/2021
43 ROUGH-IN HEAT & A/C 3/14/2021 5/17/2021
43.1 Ducts & Vents 3/14/2021 5/13/2021
43.2 Bath Fans & Vents 3/15/2021 5/16/2021
43.3 Kitchen Hood, Dryer Vent 3/16/2021 5/17/2021
44 DECKS-PORCHES-RAILINGS 3/18/2021 5/20/2021
44.1 Stair, Railings, Pickets 3/18/2021 5/19/2021
44.2 Gazebos, Pergola 3/21/2021 5/20/2021
45 ROOFING 3/21/2021 5/27/2021
45.1 Squares of Roofing 3/21/2021 5/20/2021
45.2 Squares Siding 3/22/2021 5/23/2021
45.3 Squares rigid insulation 3/23/2021 5/24/2021
45.4 Rake & Fascia 3/24/2021 5/25/2021
45.5 Soffit, Vents 3/25/2021 5/26/2021
45.6 Drip Edge, Flashing, Hardware 3/28/2021 5/27/2021
45.7 Roof Paper, Siding Paper 3/28/2021 5/27/2021
46 FASCIA & SOFFIT 3/28/2021 5/27/2021
47 SHINGLES/FLASHING 3/29/2021 5/30/2021
48 WOOD SIDING 3/30/2021 5/31/2021
49 BRICK/STONE SIDING 3/31/2021 6/1/2021
50 ROUGH-IN ELECTRIC 4/4/2021 6/6/2021
50.1 Tv, Stereo, Phone, Intercom 4/4/2021 6/3/2021
50.2 Electric Wire, Boxes 4/4/2021 6/3/2021
50.3 Vacuum, Misc. 4/4/2021 6/3/2021
50.4 Security 4/5/2021 6/6/2021
51 INSULATION 4/7/2021 6/13/2021
51.1 Crawl Space, Basement 4/7/2021 6/8/2021
51.2 Ceilings 4/8/2021 6/9/2021
51.3 Walls 4/11/2021 6/10/2021
51.4 Attic, rafters 4/11/2021 6/10/2021
51.5 Caulk-Windows, Doors, Etc. 4/11/2021 6/10/2021
51.6 Firestuffing 4/12/2021 6/13/2021
52 STAIRS 4/14/2021 6/16/2021
52.1 Treads & Risers 4/14/2021 6/15/2021
52.2 Railing & Grasp 4/15/2021 6/16/2021
53 EXTERIOR PAINT 4/18/2021 6/17/2021
54 DRYWALL 4/18/2021 6/23/2021
54.1 Hang 4/18/2021 6/17/2021
54.2 Tape 4/19/2021 6/20/2021
54.3 Block & Skim Coats 4/20/2021 6/21/2021
54.4 Sand 4/21/2021 6/22/2021
54.5 Clean Up 4/22/2021 6/23/2021
55 INTERIOR PAINT 4/25/2021 6/24/2021
56 TRIM CARPENTRY 4/25/2021 7/1/2021
56.1 Stair Railings, Pickets 4/25/2021 6/24/2021
56.2 Interior Doors 4/26/2021 6/27/2021
56.3 Base 4/27/2021 6/28/2021
56.4 Casing Trim 4/28/2021 6/29/2021
56.5 Window Stool 4/29/2021 6/30/2021
56.6 Closet Shelving 5/2/2021 7/1/2021
56.7 Decorator Mouldings, Etc. 5/2/2021 7/1/2021
56.8 Finish Hardware, Mirrors, Etc. 5/2/2021 7/1/2021
57 CABINETS-VANITIES-TOPS 5/4/2021 7/8/2021
57.1 Cabinets, Bath Vanities 5/4/2021 7/5/2021
57.2 Kitchen Counter Tops 5/5/2021 7/6/2021
57.3 Bath Vanity Tops 5/6/2021 7/7/2021
57.4 Medicine Cabinets 5/9/2021 7/8/2021
58 GUTTER & DOWN SPOUT 5/9/2021 7/8/2021
58.1 Stormwater Control 5/9/2021 7/8/2021
59 FINISH GRADING 5/10/2021 7/11/2021
60 FINISH DRIVEWAY 5/11/2021 7/12/2021
61 WALKS-DRIVEWAY APRON 5/13/2021 7/15/2021
61.1 Prepare 5/13/2021 7/14/2021
61.2 Concrete 5/16/2021 7/15/2021
61.3 Rebar, Wire, form boards 5/16/2021 7/15/2021
62 CERAMIC TILE 5/17/2021 7/19/2021
62.1 Backer Board & Prep 5/17/2021 7/18/2021
62.2 Tile & Grout 5/18/2021 7/19/2021
63 ELEC-SWITCH/PLUG/PANEL 5/19/2021 7/20/2021
64 LANDSCAPING 5/20/2021 7/21/2021
65 LAWN SEEDING 5/23/2021 7/22/2021
66 VINYL FLOORING 5/23/2021 7/25/2021
66.1 Subfloor 5/23/2021 7/22/2021
66.2 Square Yards of Vinyl 5/24/2021 7/25/2021
67 CARPETING 5/26/2021 7/28/2021
67.1 Square yards of Pad 5/26/2021 7/27/2021
67.2 Square Yards of Carpet 5/27/2021 7/28/2021
68 WOOD FLOORS-STAIRS 5/30/2021 8/1/2021
68.1 Install 5/30/2021 7/29/2021
68.2 Sand, Seal, Stain 5/30/2021 7/29/2021
68.3 Finish Coat 5/31/2021 8/1/2021
69 APPLIANCES 6/2/2021 8/4/2021
69.1 Purchase & Delivery 6/2/2021 8/3/2021
69.2 Installation 6/3/2021 8/4/2021
70 HEATING & A/C 6/6/2021 8/5/2021
70.1 Install & Test Equipment 6/6/2021 8/5/2021
70.2 Grills & Thermostat 6/6/2021 8/5/2021
71 PLUMBING TRIM 6/7/2021 8/8/2021
72 ELECTRICAL TRIM 6/8/2021 8/9/2021
73 FINAL CLEAN 6/9/2021 8/10/2021
74 WALK THROUGH 6/10/2021 8/11/2021
75 FINISH PUNCH LIST 6/13/2021 8/12/2021

This document has been created with the help of https://ganttpro.com online service
You are free to use the document for your purposes with no limitations. To edit it, please, create a copy or use https://g
Create professional Gantt charts in GanttPRO in a few clicks

8/26/2020
Progress Duration Estimate Time log Status Priority Task descri Cost Actual cost
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 384 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 384 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 384 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 376 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 376 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 376 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 384 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 384 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 376 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 400 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 384 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 392 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 400 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 384 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 368 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0
0 360 0 0 Open Medium 0 0

ate a copy or use https://ganttpro.com


Actual cost

You might also like