Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Partial Roof Plan 2: Mechanical Design Position: Mechanical Engineer PRC No.: 2195 PTR No.: 3399286 TIN No.: 145-553-983

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 10 11

DESIGNATION

GV
GV TO
TO
MC MC MCB MC MC PUMP "1"
PUMP "2"

ALT
1&2

1 1
P P
8 6 2 2 6 8
B 9 7 7 9
3
S 4 3 S
BH TYPE BW TYPE
5
2 RH RELAY RH RELAY
C

2 PARTIAL ROOF PLAN


WP-1 SCALE 1:100 M.

10 11

3 ELEVATION OF OVERHEAD WATER TANK


WP-1 NOT TO SCALE

SCHEMATIC DIAGRAM OF
500
5 WATER LEVEL CONTROL
B
WP-1 NOT TO SCALE

PARTIAL GROUND FLOOR ISOMETRIC DIAGRAM OF


1 (SHOWING LOCATION OF CISTERN) WATER PUMPING SYSTEM
4
WP-1 SCALE 1:100 M.
WP-1 NOT TO SCALE

REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH PARTIAL GROUND FLOOR (SHOWING LOCATION OF
PROPOSED PROJECTS CISTERN, PARTIAL ROOF PLAN, ELEVATION OF
MANUEL D. TORRES PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) BOD
STANDARD THREE-STOREY OVERHEAD WATER TANK, ISOMETRIC DIAGRAM OF 56
MECHANICAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING WATER PUMPING SYSTEM, SCHEMATIC DIAGRAM WP-1
POSITION: MECHANICAL ENGINEER
OF WATER LEVEL CONTROL, LEGEND, SCHEDULE 63
PRC No.: 2195 TIN No.: 145-553-983 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 12 CLASSROOMS )
PTR No.: 3399286 BUILDINGS DIVISION, BOD (REVISED 3-24-17) OF EQUIPMENT

You might also like