Apply The E.C.R.S. Technique and Identify Improvement Actions: Mechanise Some Movements
Apply The E.C.R.S. Technique and Identify Improvement Actions: Mechanise Some Movements
Apply The E.C.R.S. Technique and Identify Improvement Actions: Mechanise Some Movements
ISW ISW
Before E C R S After
OSW OSW
Problem: Difficulty in changing the drum height Improvement: Pneumatic system to lift the drum up
Results: It is possible to change the drum height rapidly and without physical efforts
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Before E C R S After
stop
stop
mould
Pressure
closing
system
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Before E C R S After
U-shaped slot
shape
shape
base base
Problem: to change the shape it is necessary to unscrew and Improvement: A U shape slot allows changing the shape
remove the bolt that connects it to the first base by simply loosening the tightening bolt
Results: The set- up time takes one minute less per bolt
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
E C R S
Slacken by means of a 6-mm Allen wrench
the two fixing screws of the first roll on the
left so much so as to lift by 2-3 mm and to
remove the support of the roll from the
slot, pushing the support itself backwards.
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Problem: Awkward equipment changes Improvement: Band fitted to retain machine parts
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
chuck chuck
Problem: Head alignment in an uncomfortable position behind the Improvement: Blocking position more comfortable and manual steering
machine (spanner needed) wheels mounted (no spanner needed)
Results: Set-up time reduction
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Size check
Size check
Position square
Check that the two ends Check of the gap 1,5 mm Graduated line
are at the same level
Meter Meter
Problem: Need for two checks: Size check of the U-bent resistances and Improvement: Checks facilitated
check of ends’ level
Results: Adjustment and retrieval time reduction
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Hexagonal spanner
Grain
Cone
Extraction
New cone
Problem: To replace the cutting cone it is necessary to unscrew two Improvement: To replace the cutting cone, one just has to lift the
grains. Time waste because the screws are hidden and in an detachment stake and to extract the cone without using any tools
uncomfortable position
Results: Set-up time reduced from 80 sec. to 10 sec. and lower cone building costs (for minor works)
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Insert (new)
Problem: To replace the insert of the main block, it is necessary to Improvement: To replace the insert of the main block one just has to
remove the ray closing mould and to unscrew the screw by means of a extract it from its seat without any tool and without taking the ray
spanner closing mould out
Results: Set-up time reduced from 180 sec. to 10 sec
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Adjustable retainer
To remove
To insert
Ball grain
Letter-holder
Letter-holder slides
Problem: To replace the letter-holder, it is necessary to move the Improvement: Slides replaced and letter-holder mounted on a new one
retainer, to extract the letter-holder, to insert a new one and to move the with ball grains. To replace the letter-holder, just lift it up and rotate slightly
retainer forth
Results: Set-up time to replace the letter-holder reduced from 20 sec to 5 sec
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Problem: Device adjusted by trial and error Improvement: Handles and counters mounted
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Problem: Too much time to fix the ring Improvement: Fixing hole modified
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -
Plant:
One Point Lesson (OPL) WCOM™
Before E C R S After
Problem: Too much time to change position Improvement: Pneumatic screwdriver adopted
Training date - - - - - - - -
Trainer - - - - - - - -
Trainee - - - - - - - -