Manzini to Mbadlane (MR3) Highway Project (Lot 1)

CONSULTANT CLIENT CONTRACTOR

MINISTRY OF PUBLIC WORKS AND INYATSI CONSTRUCTION


BEZA CONSULTING ENGINEER
TRANSPORT COMPANY

Lab No/RFI No Date of Testing

Source Grade of Material

Road Name Weather

Location Type of Application

APPLICATION RATE FOR TACK COAT

DIPS Location Rate of


Sl Litres Length Width Area
Spray
No Used (m) (m) (m2)
(lit/m2)
Initial Final From To

Remaks :

For The Contractor For The Consultant


S.L Technician Material Engineer S.L Technician Material Engineer
Manzini to Mbadlane (MR3) Highway Project (Lot 1)
CONSULTANT CLIENT CONTRACTOR

INYATSI CONSTRUCTION
BEZA CONSULTING ENGINEER MINISTRY OF PUBLIC WORKS AND TRANSPORT
COMPANY

3 METRE STRAIGHT EDGE

RFI No 16348 Rev01 Date of Testing 03/03/2020

Road Name Coats Valley (S/R) Type of Surface Crushed Stone Base

Location 0+010 - 0+520 Side LHS & RHS

Deviation from bottom Deviation from bottom


Sl
Location Remarks Sl No Location Remarks
No LHS RHS LHS RHS

1 0+500 5 3 17 0+180 3 4

2 0+480 5 8 18 0+160 3 2

3 0+460 5 3 19 0+140 8 12

4 0+440 2 4 20 0+120 9 7

5 0+420 6 3 21 0+100 7 5

6 0+400 6 2 22 0+80 0 4

7 0+380 6 5 23 0+60 4 2

8 0+360 5 2 24 0+40 3 8

9 0+340 6 0 25 0+20 2 10

10 0+320 7 2

11 0+300 9 2

12 0+280 4 8

13 0+260 4 1

14 0+240 10 0

15 0+220 3 1

16 0+200 3 14

For The Contractor For The Consultant