Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Station Fill Area Cut Area Fill Volume Cut Volume

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 11

Station Fill Area Cut Area Fill Volume Cut Volume

ft^2 ft^2 m^3 m^3


0+00.00 28.91 58.54 0 0
0+02.96 28.96 58.97 3.17 6.44
0+12.60 30.18 59.37 10.56 21.14
0+15.69 30.58 59.49 3.47 6.79
0+21.02 31.2 59.71 5.1 11.78
0+25.00 31.55 59.87 4.63 8.82
0+26.27 31.65 59.93 1.49 2.82
0+29.57 31.88 60.11 3.88 7.33
0+35.18 32.4 60.47 6.67 12.51
0+40.63 32.6 60.63 6.57 12.51
0+43.68 32.74 61.2 3.69 6.88
0+48.71 32.8 68.13 6.12 12.07
0+50.00 32.09 70.29 1.54 3.29
0+75.00 4.45 155.61 16.92 104.59
0+76.16 3.71 160.24 0.18 6.8
0+80.18 3.82 176.68 0.56 25.07
0+83.70 3.88 190.99 0.5 23.97
0+86.47 3.82 201.17 0.4 20.12
0+89.63 3.99 209.14 0.46 24
1+00 22.44 235.59 5.08 85.44
1+50.00 22.36 157.18 45.72 275.83
2+00 33.97 65.47 48.28 213.13
2+50.00 109.84 5.39 127.17 66.23
3+00 294.44 0 388.99 5.13
3+50.00 402.01 0 644.11 0
4+00 444.52 0 783.83 0
4+50.00 413.67 0 794.62 0
5+00.00 372.83 0 728.24 0
5+50.00 363.97 0 682.23 0
6+00.00 361.04 0 671.31 0
6+50.00 294.73 0 607.2 0
7+00.00 230.15 0 465.99 0
7+50.00 259.21 0 453.11 0
8+00.00 313.88 0 530.64 0
8+50.00 302.04 0 570.3 0
9+00.00 287.96 0 546.3 0
9+50.00 140.26 1.28 396.5 1.18
10+00.00 31.3 59.27 158.85 56
10+50.00 18.93 150.78 46.51 194.43
11+00.00 24.19 126.05 39.93 256.32
11+50.00 40.32 39.38 59.73 153.17
12+00.00 39.05 38.74 73.49 72.33
12+50.00 42.2 40.68 75.23 73.54
13+00.00 32.63 46.02 69.28 80.28
13+50.00 27.26 48.97 55.45 87.95
14+00.00 21.87 53.15 45.49 94.55
14+50.00 17.92 57.97 36.84 102.89
15+00.00 14.18 62.87 29.71 111.88
15+50.00 10.26 67.6 22.62 120.8
16+00.00 7.78 69.8 16.7 127.22
16+50.00 31.18 133.9 21.51 127.86
17+00.00 769.43 43.95 251.07 47.77
17+50.00 2305.17 0 2053.69 0
18+00.00 81.26 80.24 406.36 45.43
18+50.00 17.52 59.4 0 0
19+00.00 20.8 55.26 35.48 106.16
19+50.00 19.53 57.3 37.34 104.23
20+00.00 18.3 59.02 35.03 107.7
20+50.00 21.26 55.59 36.63 106.12
21+00.00 26.98 49.77 44.67 97.55
21+50.00 36.34 40.61 58.63 83.68
22+00.00 46.87 28.89 77.04 64.36
22+50.00 57.18 21.53 96.33 46.69
23+00.00 61.18 17.36 109.57 36.01
23+50.00 64.52 13.92 116.37 28.96
24+00.00 69.17 12.31 122.88 24.29
24+50.00 71.95 10.05 129.74 20.7
25+00.00 79.77 5.2 140.48 14.12
Comulative Fill Comulative Cut Landscaping
Unit Cost (Cut)
Volume Volume Cost
m^3 m^3 rate/cubic.meter $
0 0 264.35988 0
3.17 6.44 264.35988 1702.4776272
13.73 27.57 264.35988 5588.5678632
17.2 34.37 264.35988 1795.0035852
23.3 48.13 264.35988 3114.1593864
27.93 54.95 264.35988 2331.6541416
29.42 57.77 264.35988 745.4948616
33.3 65.1 264.35988 1937.7579204
39.97 77.62 264.35988 3307.1420988
39.97 77.62 264.35988 3307.1420988
50.22 96.72 264.35988 1818.7959744
56.34 108.79 264.35988 3190.8237516
57.88 112.09 264.35988 869.7440052
74.8 216.67 264.35988 27649.3998492
74.97 223.47 264.35988 1797.647184
75.53 248.54 264.35988 6627.5021916
76.03 272.51 264.35988 6336.7063236
76.43 292.63 264.35988 5318.9207856
76.89 316.63 264.35988 6344.63712
81.97 402.07 264.35988 22586.9081472
127.69 677.9 264.35988 72918.3857004
175.97 891.03 264.35988 56343.0212244
303.14 957.26 264.35988 17508.5548524
692.13 962.39 264.35988 1356.1661844
1336.24 962.39 264.35988 0
2120.07 962.39 264.35988 0
2914.69 962.39 264.35988 0
3642.93 962.39 264.35988 0
4325.16 962.39 264.35988 0
4996.47 962.39 264.35988 0
5603.67 962.39 264.35988 0
6069.66 962.39 264.35988 0
6522.77 962.39 264.35988 0
7053.41 962.39 264.35988 0
7623.71 962.39 264.35988 0
8170.01 962.39 264.35988 0
8566.51 963.57 264.35988 311.9446584
8725.36 1019.57 264.35988 14804.15328
8771.87 1214 264.35988 51399.4914684
8811.8 1470.32 264.35988 67760.7244416
8871.53 1623.49 264.35988 40492.0028196
8945.02 1695.82 264.35988 19121.1501204
9020.25 1769.36 264.35988 19441.0255752
9089.53 1849.64 264.35988 21222.8111664
9144.98 1937.59 264.35988 23250.451446
9190.47 2032.14 264.35988 24995.226654
9227.31 2135.03 264.35988 27199.9880532
9257.02 2246.91 264.35988 29576.5833744
9279.64 2367.71 264.35988 31934.673504
9296.34 2494.93 264.35988 33631.8639336
9317.85 2622.79 264.35988 33801.0542568
9568.92 2670.56 264.35988 12628.4714676
11622.61 2670.56 264.35988 0
12028.97 2715.99 264.35988 12009.8693484
12028.97 2715.99 264.35988 0
12064.45 2822.15 264.35988 28064.4448608
12101.79 2926.38 264.35988 27554.2302924
12136.82 3034.08 264.35988 28471.559076
12173.45 3140.2 264.35988 28053.8704656
12218.12 3237.75 264.35988 25788.306294
12276.75 3321.43 264.35988 22121.6347584
12353.79 3385.79 264.35988 17014.2018768
12450.12 3432.48 264.35988 12342.9627972
12559.69 3468.49 264.35988 9519.5992788
12676.06 3497.45 264.35988 7655.8621248
12798.94 3521.74 264.35988 6421.3014852
12928.68 3542.44 264.35988 5472.249516
13069.16 3556.56 264.35988 3732.7615056
940291.0827768
Unit Cost
(Fill)
$
0
838.0208196
2791.6403328
917.3287836
1348.235388
1223.9862444
393.8962212
1025.7163344
1763.2803996
1736.8444116
975.4879572
1617.8824656
407.1142152
4472.9691696
47.5847784
148.0415328
132.17994
105.743952
121.6055448
1342.9481904
12086.533714
12763.295006
33618.64594
102833.34972
170276.84231
207213.20474
210065.64785
192517.43901
180354.24093
177467.43104
160519.31914
123189.06048
119784.10523
140279.92672
150764.43956
144419.80244
104818.69242
41993.566938
12295.378019
10555.890008
15790.215632
19427.807581
19887.793772
18314.852486
14658.755346
12025.730941
9739.0179792
7854.1320348
5979.8204856
4414.809996
5686.3810188
66372.835072
542913.24196
107425.28084
0
9379.4885424
9871.1979192
9260.5265964
9683.5024044
11808.95584
15499.419764
20366.285155
25465.78724
28965.912052
30763.559236
32484.542054
34298.050831
37137.275942
3454702.4966
A 45 cm culvert, 25 km long, is being installed. Experience indicates that 5 large backhoe and 5 operator, and 10 la
crew uses a flat-bed truck to transport themselves and the pipe each
2km per day
Equipment Number of Machin Working Hours Comulative work
Backhoe 5 6 30
Truck 5 9 45
OR

Accordidng to an educated estimate, 4 culverts are required in 1km long road and there cost of construction is 1240
is very close to our calculated cost for drainage construction.

Pipe Cost
Pipe length(m) 25000
Cost per meter(m) 15

Total Cost for Pipe($) 375000


e and 5 operator, and 10 laborers can install 45 culverts per day. The culvert
mselves and the pipe each day.

Cost per Hour ($) Total Cost/day Complete Cost


60 1800 23400
12 540 7020
30420

ost of construction is 1240$, by adopting that estimate cost is 31,000$ which


Work to be performed Number of days required
Surfacing and clearing of site 3
Cut and fill Earth work 7
Compaction of Sub-base 9
Laying of Coarse Grade Material and compaction 10
Laying of base and wearing coarse and compaction 20
Drainage Construction 13
Side Walks (concrete material) 14
Concrete Curb 8
Furnishing the road 15
99
Total Duration 3.5 months
Description No. Length
ft
Subgrade Preparation and dressing 1 82000
Sub-base material 1 82000
Labor for spreading and consolidation of Sub-base 1 82000
Base Layer Materials 1 82000
Labor for spreading and consolidation of base 1 82000

Description Quantity Unit


Subgrade Preparation and dressing 3936000 sq.ft
Sub-base material 3936000 cu.ft
Labor for spreading and consolidation of Sub-base 3936000 cu.ft
Base Layer Materials 1558000 cu.ft
Labor for spreading and consolidation of base 1558000 cu.ft
Width Height Quantity Unit
ft ft
48 0 3936000 sq.ft
48 1 3936000 cu.ft
48 1 3936000 cu.ft
38 0.5 1558000 cu.ft
38 0.5 1558000 cu.ft

Rate Amount
0.2 787200
1.5 5904000
1.4 5510400
1.7 2648600
1.55 2414900
17265100

You might also like