Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCHEDULE OF REINFORCEMENT

450 12000 450

300 445

250 280 TO
441
BEDBLOCK CUM DIRT WALL

(b1)
(SQ) 12950 (SK) 13728
745
LONGITUDINAL SECTION CROSS SECTION OF ABUTMENT

450 12000 450

445 300

745
(b1)
(SQ) 12950 (SK) 13728

PLAN BEDBLOCK OVER PIER


BEDBLOCK CUM DIRT WALL
(SCALE 1:50)

250
(b1)
(SK) 14096

LONGITUDINAL SECTION

250

870
ABUTMENT (SKIN REINFORCEMENT)

410 (SQ) 13276 (SK) 14128 410 CROSS SECTION


(SK) 14096

PLAN
BEDBLOCK OVER PIER
(SCALE 1:50)

PIER (SKIN REINFORCEMENT)


900

900

NOTES:-
2884

2816

2885
2816

RETURNWALL (SKIN REINFORCEMENT)


2775

2775

CROSS SECTION @ ABUTMENT


CROSS SECTION @ PIER CROSS SECTION ON RETURN WALL
SHEET : 04
DATE :
DRAWN PROJECT :
GOVERNMENT OF TAMILNADU CONSTRUCTION OF HIGH LEVEL BRIDGE IN LIEU OF EXISTING SCALE :

DESIGNED
HIGHWAYS DEPARTMENT CAUSEWAY AT KM 14/4 OF KURICHI KANNAMANAICKNOOR VIA AS SHOWN

F:\Sujith\Kanyakumari Work\Tamil New.png HIGHWAYS PROJECTS NACHIPALAYAM ROAD (MDR -1182 ) SIZE :
CONSULTANT : A2
CHECKED CIRCLE : COIMBATORE
DIVISION : COIMBATORE REVISION
TITLE : RC DETAIL OF SUB STRUCTURE
APPROVED SECTION : UDUMALPET R(0)
F:\Sujith\New Project\Cross Survey Dell\Sungam Jn\Logo.jpg

You might also like