Daqing Petroleum Iraq Branch

Working at Height Rescue Plan


1.0 Purpose

The purpose of working at height rescue plan is to prevent prolonged suspension, perform
rescue and treatment as quickly as possible and to identify and cure suspension trauma signs
and symptoms.

2.0 Suspension Trauma

The medical effect of immobilisation in a vertical position is called Suspension Trauma. Medical
term of suspension trauma is ‘Orthostatic Incompetence’. It presents an immediate threat of
death to anyone immobilised in a vertical position for example hanging still in harness.
Suspension trauma can only affect someone who is immobile specifically not using their leg
muscles to any great extent. It does not normally affect people who wear a harness but who are
actively moving about (climbing, caving, etc), suspended for only a minute or two
(parachutists). The danger is when someone is unable to move, or forgets to bother.

2.1 General Signs and Symptoms of Suspension Trauma

Signs and symptoms of suspension trauma include:

 General feelings of uneasiness

 Dizzy, sweaty and other signs of shock

 Increased pulse and breathing rates

 Then a sudden drop in pulse & Blood Pressure

 Instant loss of consciousness

If not rescued, death is certain from suffocation due to a closed airway, or from lack of blood
flow and oxygen to the brain.

3.0 Rescue Plan

Rescue plan includes formulation of rescue team, equipment used during rescue and the steps
of rescue procedure.

Daqing Petroleum HSSE Department Page 1


Daqing Petroleum Iraq Branch

3.1 Rescue Team

Rescue team consists of the following members:

 Rig Manager as Man in Charge of the whole operation.

 On duty Tool Pusher as Leader of rescue team.

 Two Designated Floor man as Rescue Team

 Rig Medic

 Crane Operator

3.2 Equipments involved

 Man Basket

 Air Winch(s)

 Cutter (to Cut the Lanyard if Required)

 Basket Stretcher

 Crane

 Tag lines

3.3 Rescue Procedure

1. First of all event is communicated to all concerned.

2. Rig Manager and Company Man will inform their respective base camps about the event
for any emergency help.

3. Rig Medic will stand by at rig floor along with Emergency Kit and basket stretcher

4. Tool Pusher will act as rescue team leader and supervise all rescue activities.

5. Driller will stop the operations

6. Crane operator will be called

7. Man Basket will be brought to rig floor for the purpose of rescue

Daqing Petroleum HSSE Department Page 2


Daqing Petroleum Iraq Branch

8. Floor man will connect the Man Basket with the Air winch or crane (Which ever option is
feasible) and rescue team of two designated floor man with required equipment will go
up to the point where victim is in hanging position.

9. Rescue team will release the victim from fall arrester equipment and put him in the
basket considering the signs and effects of suspension trauma, then bring him down to
the rig floor.

10. Rig medic will be ready with basket stretcher, victim will be put into stretcher and
medic will give him first aid.

11. Victim will be brought down to the ground through crane with the help of tag lines and
transferred to the clinic for the further treatment.

12. If Victim Condition is serious then he will be taken to hospital through ambulance.

Daqing Petroleum HSSE Department Page 3