subsubcontractor mark up not included in unit rate !!!!!!

1.0.1
5 mth strduture work start
6 mth total duration of progr

Item Direct cost QTY Rate


RM
insert RM - Material 727.00 RM -
3120 Labour x2 727.00 4.29
1000 Tool and eqt 727.00 1.38
indirect cost 5% 0.28
Total rate 5.95
Assume all edge of slab (m)=
1,189.00
Estimate m2 and dowel bar required
P 1,189
M 661
O 331
727.00 nos

OKA stndard m
1.0.2 w
qty rate / item Total 0.9
m3 lean conc. 0.2544 250 RM 63.60 per 1.2m
Precast udrain
m3 Concrete + 2.5% (G25)+waste 3% 0.1995216 210 RM 41.90 per 1.2m
m2 Rebar +2.5% (BRCA7) + waste 3% 0.091152 20.4 RM 1.86 per 1.2m
RM 89.47 per m
delivery RM 30.00 per m
addin ***cost
mth Rate
Machinary
JCB 5 12000 60,000.00 16.59
pump 6 5000 30,000.00 8.29
24.88
total = RM 144.35
bracing 5% + manpower 10% RM 166.00 per m
it rate !!!!!!

strduture work start


total duration of program

m m m
d L wall thick volume no.
0.455 1.2 0.08 0.10272 wall
0.0864 slab 3015

per m
mth
1 Piling Machine 52,000.00
2 JCB (Backhoe) 12,000.00
3 Excavator E200 18,500.00
4 Roller Compactor 8,000.00
5 Mobile Crane 20/25mt 25,000.00
6 Mobile Crane 45mt* 38,000.00
7 Cawler Crane 55mt 38,000.00
8 Pump Machine 5,000.00
9 Generator Set 3,000.00
10 Air Compressor 1,200.00
11 Concrete Mixer 500.00
12 Bar Cutting Machine 2,000.00
13 Bar Bending Machine 1,200.00
14 Lorry Crane 10tons 12,000.00
15 Forklift 3 tons 2,500.00
16 Manitau 5 tons 3,500.00
17 Skylift / boom lift 4,000.00
18 Premix Paver
19 Tyre Roller
20 10W Tipper Truck 19,000.00
1 Indirect Labour
Pilers
CIVIL

Equipment / Machinery Operator


Ceiling, Partition & Panel installer
Common worker
Insulator
Sheet metal worker
ERECTION

Equipment Operator
Window installer
Door installer
Cubicle installer
Common Worker
Plumber
CONTRACTOR

Electrician
Fire fighting installer
SUB

Premix layer
Equipment Operator
Common Worker
1 Direct Labour
Foreman
Carpenter
CIVIL
Mayson
Concrete finisher

CIVIL
Rigger
Barbender
Drainlayer
Skim coated / Plasterer
Tiler
Common worker
Foreman
Steel structure fitter
Steel structure fitter (Off site)
Fluxcore welder
Fluxcore welder (Off site)
Electrician
ERECTION

Instrument technician
Painter
Painter (Off site)
Rigger
Rigger (Off site)
Signal men
Signal men (Off site)
Common Worker
1 Field Management / Supervisory Staff
MANAGEMENT

Project Manager
Project Advisor
Construction Manager
Engineering Manager
TROL

Project Coordinator
CON

Project Engineer
SUPE
RVISI

Site Manager
N

Site Supervisor
MATE

Store Keeper
RIAL

Store Worker
EQU FAC
IPM ILITI
ENT ES

Facilities Supervisor

Equipment Supervisor
Safety Officer
HSE

Safety Supervisor
Lifting Supervisor
ACT RING
CO ENGI
NTR NEE

Design Engineer

Project Quantity Surveyor


QA/QC Manager
QAQ
C

QA/QC inspector
ADMINIS
TRATOR
Site Clerk
Account Clerk
Purchasing Clerk

You might also like