Analysis of Labour Cost: Labour Index Factor Calulation Discription Percantage
Analysis of Labour Cost: Labour Index Factor Calulation Discription Percantage
Analysis of Labour Cost: Labour Index Factor Calulation Discription Percantage
discription percantage
%
Regular salary 100
Anaul leave 7.8
public holidays 3.6
miscellanous leave 5.8
benefits 3
average annual increase 13.3
rainy season salary 19.45
sub total
Contingency ( for work injury, dispute & labour union)
8 % of the toatal indexed cost
Grand Total Indexed Factor
Type of
Material Unit Qty. * Rate
Total =
percantage decimal fraction
1
0.078
0.036
0.058
0.03
0.133
0.1945
1.5295
.08*1.52 0.12236
1.65186
LAB.
COST
1.0
37.66
29.73
27.75
27.75
27.75
24.77
24.77
22.79
22.79
22.79
22.79
22.79
22.79
22.79
49.55
39.64
15.86
19.82
19.82
15.86
15.86
15.86
15.86
11.89
8.92
G.chife
Total = Total =
ost (1:03)
Hourly
Cost