301 PGC - Rem Coagulation
301 PGC - Rem Coagulation
301 PGC - Rem Coagulation
A B TOP VIEW
SEE DRAWING :
SAND FILTERS
+1153.35
+1153.35
+1153.60
0.15
0.15
0.15
0.15
0.15
0.15
Collector ND 200
AXIAL LOAD XXXX daN AXIAL LOAD XXXX daN AXIAL LOAD XXXX daN
M04 M04 M04
RADIAL LOAD XXXX daN RADIAL LOAD XXXX daN RADIAL LOAD XXXX daN
TORQUE XXXX daN/m TORQUE XXXX daN/m TORQUE XXXX daN/m
+1153.60
LEGEND :
STATIC LOAD STATIC LOAD STATIC LOAD
CWS = Civil work supply CL = Center line
610 daN 610 daN 610 daN
AXIAL LOAD AXIAL LOAD AXIAL LOAD PS = Process supply (Equipment) GL = Ground level
132.5 daN 132.5 daN 132.5 daN WL = Water level CW = See formwork drawing
RADIAL LOAD RADIAL LOAD RADIAL LOAD
43.5 daN 43.5 daN 43.5 daN
+1153.60 +1153.60 +1153.60 +1147.69
TORSION TORQUE TORSION TORQUE TORSION TORQUE
NOTES :
147.6 daN/m 147.6 daN/m 147.6 daN/m
BENDING TORQUE BENDING TORQUE BENDING TORQUE -Levels and dimensions are in meters. They apply to finished structures
139.1 daN/m 139.1 daN/m 139.1 daN/m -Pipe diameters in millimeters.
7.50
CONSTRUCTION :
1.20
+1150.60
FLOCCULATION FLOCCULATION FLOCCULATION
CHAMBER 1 CHAMBER 2 CHAMBER 3 -Tolerance : +/- 1 cm Unless stated otherwise - As per international standards.
-The structure must be watertight ( inside and outside )
-The structure must be stable (full or empty)
1.20 -1 Tank empty the other full or vice-versa
JIB CRANE SUPPORT JIB CRANE SUPPORT -For each compartment: compartment can be full, adjacent compartment empty
-The pump concrete base will be confirmed with selected pumps supplier
LIFTING LOAD LIFTING LOAD -Traveling crane loads shall be confirmed with selected supplier
500 daN 500 daN
The Employer
0.90
1.50
AUTHORITY
COAGULATION COAGULATION
COAGULATION CHAMBER 2 CHAMBER 3
The Financing Partners
CHAMBER 1
8.50
BENDING TORQUE BENDING TORQUE BENDING TORQUE
120.9 daN/m 120.9 daN/m 120.9 daN/m
C C
REMINERALIZATION REMINERALIZATION REMINERALIZATION LAKE VICTORIA WATER AND SANITATION PROJECT (WATER SUPPLY, WASTEWATER AND SANITATION) FOR MWANZA CITY
AND SATELLITE TOWNS (MISUNGWI, MAGU AND LAMADI)
CHAMBER 1 CHAMBER 2 CHAMBER 3 DESIGN AND BUILD OF BUTIMBA INTAKE, RAW WATER PIPELINE AND WATER TREATMENT PLANT (WTP)
Contract N°: AE/042/2015-2016/W/03c
TITLE:
REMINERALIZATION-COAGULATION-FLOCCULATION-LAMELLAR SEDIMENTATION
TOP VIEW
REF:
V C G P 3 0 0 C W D 0 3 0 1 A1 P R E
1/50 A0
0 1 2 3 4 5m
A B
This document is the property of Vinci Construction Grands Projets. It cannot be communicated to third parties or reproduced even partially without prior consent
in writing © COPYRIGHT
A0