T.P.Particulars: Sectional Elevation On 'A B'
T.P.Particulars: Sectional Elevation On 'A B'
T.P.Particulars: Sectional Elevation On 'A B'
WITH 12MM Ø @150 C/C IN BOTH WAYS AT TOP AND OF SIZE 500 X500 X 1200
BOTTOM AND 75 MM THICK WEARING COAT IN CC M35 300 MM THICK APPROACH SLAB IN V RCC M30 GRADE
14600 c/c OF EXP. JOINTS 14600 c/c OF EXP. JOINTS WITH 12MM Ø @150 C/C IN BOTH WAYS AT TOP AND
PILASTERS HAND RAILING AS PER
RL +22.000 OF SIZE 500 X500 X 1200 M.O.S.T DRG. SD/201 BOTTOM AND 75 MM THICK WEARING COAT IN CC M35
RL +22.00 RL +22.000
1.6M
14000 RCC RETAINING WALL
SOILS
+17.000 M
RCC RCC
RETURN WALL RETURN WALL
5.85 M
RCC RETAINING WALL 13100
GRAVEL +11.150 M
FSL +13.550
2.65M
HARD GRAVEL
(LATERITE)
+8.550 M
300 300
3250 1450 750 4500 4500 750 1450 3250
CBL +10.550
+10.100
+10.300 +10.300
2500 +10.100 T.P.PARTICULARS
2500 +9.700
900
5700
10250 600
10250
SECTIONAL ELEVATION ON 'A B'
500
14600 C/C EXP. JOINTS 14600 C/C EXP.JOINTS +22.900
900
+22.000
600
750
1500
11900
A B
RETURN WALL IN RCC M-25
12000
FOUNDATION CONCRETE
IN RCC M-25 GRADE
1600
+8.500
900
750
1500
150 THICK LEVELLING 600
COURSE IN CC M-10
SECTION OF RETURN WALL
SCALE 1:100
C A N A L FLOW
HALF PLAN AT TOP AND HALF AT BOTTOM
12000
10900 12000
10900
CL OF CARRIAGEWAY
56 MM THK WEARING COAT HAND RAILING AND KERB CL OF CARRIAGEWAY
IN CC M35 DETAILS ASPER MOST. WEARING COAT HAND RAILING AND KERB
IN CC M35 DETAILS ASPER MOST.
2.5% ROAD LEVEL +22.000 2.5%
2.5% ROAD LEVEL +22.000 2.5%
1466
1330
665
2025 2025
+20.272 2025 2025
+19.972 +20.272
2650 2650 2650 2650 2650 2650
ABUTMENT BED
ABUTMENT IN RCC M-25 PIER CAP IN RCC M-25
BLOCK IN RCC M-25 1500 +19.072
PIER PEDESTAL +18.772
IN RCC M-25 750 750
9000
4500
1500
FSL +13.550
13400
1500 TH SOLID
PIER IN RCC M-25
CANAL BED LEVEL +10.550
CANAL BED LEVEL +10.550