T.P.Particulars: Sectional Elevation On 'A B'

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

300 MM THICK APPROACH SLAB IN V RCC M30 GRADE PILASTERS

WITH 12MM Ø @150 C/C IN BOTH WAYS AT TOP AND OF SIZE 500 X500 X 1200
BOTTOM AND 75 MM THICK WEARING COAT IN CC M35 300 MM THICK APPROACH SLAB IN V RCC M30 GRADE
14600 c/c OF EXP. JOINTS 14600 c/c OF EXP. JOINTS WITH 12MM Ø @150 C/C IN BOTH WAYS AT TOP AND
PILASTERS HAND RAILING AS PER
RL +22.000 OF SIZE 500 X500 X 1200 M.O.S.T DRG. SD/201 BOTTOM AND 75 MM THICK WEARING COAT IN CC M35

RL +22.00 RL +22.000

225 MM THICK WELL


COMPACTED GRAVEL 225 MM THICK WELL
+20.278 +20.478 BEARINGS +20.272 +20.278
4700 600 COMPACTED GRAVEL GL +18.60M
450 +19.978 +19.978 4700
14000 +19.072

1.6M
14000 RCC RETAINING WALL

SOILS
+17.000 M
RCC RCC
RETURN WALL RETURN WALL

5.85 M
RCC RETAINING WALL 13100

GRAVEL +11.150 M
FSL +13.550

2.65M
HARD GRAVEL
(LATERITE)

+8.550 M
300 300
3250 1450 750 4500 4500 750 1450 3250
CBL +10.550
+10.100
+10.300 +10.300
2500 +10.100 T.P.PARTICULARS
2500 +9.700

+8.500 +8.50 +8.500 +8.500 +8.500

900
5700

10250 600
10250
SECTIONAL ELEVATION ON 'A B'

500
14600 C/C EXP. JOINTS 14600 C/C EXP.JOINTS +22.900

900
+22.000
600
750

1500

11900
A B
RETURN WALL IN RCC M-25
12000

FOUNDATION CONCRETE
IN RCC M-25 GRADE

4000 2000 4400


+10.100

1600
+8.500

900
750

1500
150 THICK LEVELLING 600
COURSE IN CC M-10
SECTION OF RETURN WALL
SCALE 1:100
C A N A L FLOW
HALF PLAN AT TOP AND HALF AT BOTTOM

12000
10900 12000
10900
CL OF CARRIAGEWAY
56 MM THK WEARING COAT HAND RAILING AND KERB CL OF CARRIAGEWAY
IN CC M35 DETAILS ASPER MOST. WEARING COAT HAND RAILING AND KERB
IN CC M35 DETAILS ASPER MOST.
2.5% ROAD LEVEL +22.000 2.5%
2.5% ROAD LEVEL +22.000 2.5%
1466
1330

665

2025 2025
+20.272 2025 2025
+19.972 +20.272
2650 2650 2650 2650 2650 2650
ABUTMENT BED
ABUTMENT IN RCC M-25 PIER CAP IN RCC M-25
BLOCK IN RCC M-25 1500 +19.072
PIER PEDESTAL +18.772
IN RCC M-25 750 750
9000

4500
1500

100 MM DIA WEEP HOLES 1500 MM C/C


STAGGERED
FSL +13.550 6000

FSL +13.550
13400
1500 TH SOLID
PIER IN RCC M-25
CANAL BED LEVEL +10.550
CANAL BED LEVEL +10.550

+10.300 1000 1000


FOOTING
RCC M-25 +9.700
FOOTING
1200

150 THICK LEVELLING IN RCC M-25


+8.500 +8.500
COURSE IN CC M-10
P.BRAHMAIAH
8000
150 THICK LEVELLING
SECTIONAL ELEVATION OF ABUTMENT COURSE IN CC M-10
SCALE 1 : 100
SECTIONAL SCALE
ELEVATION OF PIER
1 : 100