SAP S4 HANA Vs ECC
SAP S4 HANA Vs ECC
SAP S4 HANA Vs ECC
As a SAP consultant who has recently completed a S/4 HANA green field implementation
project, just thought of sharing the new features (differences and improvements) which were
identified in each sub module area, in S/4 HANA Finance module with compared to ECC.
Hope this will be helpful for the other consultants who are plaining to go ahead with the new SAP
S/4 HANA implementation.
Finance General
1. Totals and application index tables were removed ( exist as views) and theses are
replaced by the Universal journal ACDOCA table.
This is a compatible table which provides all CO,AA, and other cost object information in one
table.
1. Certain transaction codes and programs in the application areas, have been replaced
with newer transactions, programs, or WebDynpro applications.
In S/4 HANA
1. If migrate from ECC to S/4 HANA, can migrate Ledgers of New General Ledger of the
Business Suite or the Classic General Ledger GL to the Universal Journal in S/4HANA.
But the number of Ledgers and the configuration of its currency will stay; it is not possible
to introduce new ledgers or new currencies during the migration to S/4 HANA.
If Classic General Ledger was used, the ledger ’00’ is migrated to the new leading ledger ‘0L’ of
the universal journal.
2. SAP controlling (CO) is now part of the universal journal. It creates only one document in FI.
During FI posting document carries both FI and CO information with single source of truth.
In ECC
In S/4 HANA ( In S/4 HANA material ledger activation is a mandatory requirement, therefore
material ledger document get generate for each material related transaction. )
3. There is no longer a need for CO Realtime integration for transfer of secondary CO postings to
New GL or the Reconciliation Ledger of Classic GL.
In ECC
In S/4 HANA
1. Currencies
In ECC In S/4 HANA
One of the CO currencies needed to be the local With the universal journal and the common line
currency, but it was not necessary that the other item table ACDOCA for FI and CO, there is also
currency in CO was also configured in FI. a central currency configuration for the universal
journal.
Financial Accounting (New ) à Financial Accounting Global Settings (New) à Ledgers à Ledger
àDefine Settings for Ledgers and Currency Types.
In ECC
6.An additional column appears in Transaction OB52 (opening and closing periods) for postings
from Controlling to Finance, (although you still need OKP1 at Controlling Area level).
In S/4 HANA
FI- AP
1. FK01 is now not in used. Now need to create vendor using BP ( Business Partner )
creation role.
In ECC – FK01
In S/4 HANA – BP
FI-AR
1. Credit Management now with FSCM , Other than creating the credit controlling area,
need to define credit segments and assign it to BP role.
In ECC – FD32
In S/4 HANA
1. Actual data of ANEK, ANEP, ANEA, ANLP, ANLC is now stored in table ACDOCA.
ANEK data is stored in BKPF.
2. Execute mandatory application configuration steps related to Asset Accounting. IMG -> Asset
Accounting New à Migration: Asset Accounting New à Adjust parameters of chart of depreciation
Once configured the chart of depreciation, Adjustment of parameter of the chart of depreciation
need to be executed.
The leading valuation can be recorded in any depreciation area. The system now posts both the
actual values of the leading valuation and the values of parallel valuation in real time.
New Asset Accounting makes it possible to post in real time in all valuations (that is, for all
accounting principles).
In ECC
In S/4 HANA
4. Define Technical Clearing Account for Integrated Asset acquisition
For an integrated asset acquisition posting, the system divides the business transaction into an
operational part and a valuating part. To split the business process in an operational and a
valuating document parts there need to be established the “technical clearing account” for
integrated asset acquisition.
Operational Entry
For the operational part (vendor invoice), the system posts a document valid for all accounting
principles against the technical clearing account for integrated asset acquisitions. (ledger-group-
independent document)
Dr Technical clearing
CR Vendor
Valued Entry
For each valuating part (asset posting with capitalization of the asset), the system generates a
separate document that is valid only for the given accounting principle. This document is also
posted against the technical clearing account for integrated asset acquisitions.
DR Asset
CR Technical clearing
In S/4 HANA
In ECC
In S/4 HANA
Settlement rules can also be ledger specific if required
6. Statistical postings– instead of statistical cost elements with cost category 90 there is now a
special field in the GL account master record is there only in fixed asset and material
reconciliation accounts to record this in controlling area. ( Record account assignment. )
In ECC
In S/4 HANA
7. Asset cut over migration:
In S/4 HANA, Asset transaction data is posted through ABLDT, it updates Assets Accounting and
General Ledger Accounting at the same time; due to this, no reconciliation issues occur.
In S/4 HANA
In ECC transaction data was getting posted separately in Assets Accounting through :
a. AS91
9. There is no separate balance carry forward needed in asset accounting, the general ledger
balance carry forward transaction FAGLGVTR transfers asset accounting balances.
The program Fixed Assets-Fiscal Year Change transaction AJRW is no longer has to be
performed at fiscal year change.
In ECC
In S/4 HANA
FI- BL
The following transaction codes are replaced by the new Fiori app Create House Bank, Manage
Banks, which can be accessed from the Fiori Launchpad.
Now can maintain banks hierarchies based on bank business partners , overdraft limits,
signatories and approvals flow and additional reporting such as the foreign bank account report.
Bank accounts can download and uploaded through Excel in different SAP clients (Development
to Production).
In ECC
FI –> Bank Accounting –> Bank account –> Define House bank
In S/4 HANA
Data Migration Technology
In S/4 HANA for cut over data migration and for other data migrations, SAP has introduced a new
functionality. That is LTMC, (web dynpro) SAP S/4 HANA Migration cockpit for data uploads.
The use of LSMW for data load to SAP S/4HANA is not recommended, hence an SAP Migration
cockpit can be used for migrations. But still you can use LSMW based on your preference.
It provides predefined Microsoft Excel templates which can be downloaded, filled with data, and
uploaded to SAP S/4HANA.
Before starting, web service needs to be activated through the T-code SICF.
Fiori Launch Pad with Fiori Apps for most of the standard T-codes.
I wrote this blog post to share my knowledge with you. So, if I have missed anything interesting
or important, feel free to add those in the comment box. Hope this will help all the finance and
non-finance SAP consultant to get an idea on the new features in S/4 HANA.