January 2012 Projected Units For Awarding (Site Max. Unit Recommendation) ER GB-RH
January 2012 Projected Units For Awarding (Site Max. Unit Recommendation) ER GB-RH
January 2012 Projected Units For Awarding (Site Max. Unit Recommendation) ER GB-RH
unit recommendation)
As of Jan 5, 2012
ER GB-RH
A B C D E F G H I J K L M N
Contractor ER Max. On going Projected Remaining Ave. accompl On going Available Units GB Max. On going Projected Remaining Ave. accompl On going Available
ER Completion On going on going Equivalent Units for for awarding (G x 2) RH Completion On going on going Equivalent (H – M)
(94% up) (B-C) (D*(1-E)) Awarding (94% up) (I -J) (K*(1-L))
329 10 319 38.12% 203 20 230 472 560 13 547 41.04% 328 144
Notes : 1. Hold awarding for TJTJ, EQE and Valdap due to delays (w/ CMD info and memo)
2, Awarded 1 isabelle each to Arzea and MIC even with over max. units already since it is only them
accepting isabelle model.
3. Only ARZEA, MIC, DREX, STARCLINK and RCC are endorsed by CMD for awarding.
Prepared By : Approved By :
ER GB-RH
A B C D E F G H I J K L M N
Contractor ER Max. On going Projected Remaining Ave. accompl On going Available Units GB Max. On going Projected Remaining Ave. accompl On going Available
ER Completion On going on going Equivalent Units for for awarding (G x 2) RH Completion On going on going Equivalent (H – M)
(94% up) (B-C) (D*(1-E)) Awarding (94% up) (I -J) (K*(1-L))
298 18 280 45.39% 171 21 254 536 473 13 460 43.03% 266 270
Notes : 1. Hold awarding for TJTJ, EQE and Valdap due to delays (w/ CMD info and memo)
2, Awarded 2 isabelle each to Arzea and MIC even with over max. units already since it is only them
accepting isabelle model.
3. Only ARZEA, MIC, DREX, STARCLINK and RCC are endorsed by CMD for awarding.
Prepared By : Approved By :
ER GB-RH
A B C D E F G H I J K L M N
Units For
Contractor ER Max. On going Projected Remaining Ave. accompl On going Available Units GB Max. On going Projected Remaining Ave. accompl On going Available Awarding
ER Completion On going on going Equivalent Units for for awarding (G x 2) RH Completion On going on going Equivalent (H – M)
(94% up) (B-C) (D*(1-E)) Awarding (94% up) (I -J) (K*(1-L)) w/ NTC
410 168 0 168 50.77% 89 0 279 642 301 0 301 54.35% 140 502 0
Prepared By : Approved By :
ER GB-RH
A B C D E F G H I J K L M N
Units For
Contractor ER Max. On going Projected Remaining Ave. accompl On going Available Units GB Max. On going Projected Remaining Ave. accompl On going Available Awarding
ER Completion On going on going Equivalent Units for for awarding (G x 2) RH Completion On going on going Equivalent (H – M)
(94% up) (B-C) (D*(1-E)) Awarding (94% up) (I -J) (K*(1-L)) w/ NTC
390 140 0 140 56.87% 66 0 324 648 243 18 225 56.65% 101 547 0
Prepared By : Approved By :
ER GB-RH
A B C D E F G H I J K L M N
Units For
Contractor ER Max. On going Projected Remaining Ave. accompl On going Available Units GB Max. On going Projected Remaining Ave. accompl On going Available Awarding
ER Completion On going on going Equivalent Units for for awarding (G x 2) RH Completion On going on going Equivalent (H – M)
(94% up) (B-C) (D*(1-E)) Awarding (94% up) (I -J) (K*(1-L)) w/ NTC
Prepared By : Approved By :