The document contains compliance monitoring data for three power plants - Nasulo, Sogongon 1, and Sogongon 2 - over 24 intervals. Nasulo was mostly compliant but had intervals below 80% requirement. Sogongon 1 and Sogongon 2 reported 0% compliance for all intervals.
The document contains compliance monitoring data for three power plants - Nasulo, Sogongon 1, and Sogongon 2 - over 24 intervals. Nasulo was mostly compliant but had intervals below 80% requirement. Sogongon 1 and Sogongon 2 reported 0% compliance for all intervals.
The document contains compliance monitoring data for three power plants - Nasulo, Sogongon 1, and Sogongon 2 - over 24 intervals. Nasulo was mostly compliant but had intervals below 80% requirement. Sogongon 1 and Sogongon 2 reported 0% compliance for all intervals.
The document contains compliance monitoring data for three power plants - Nasulo, Sogongon 1, and Sogongon 2 - over 24 intervals. Nasulo was mostly compliant but had intervals below 80% requirement. Sogongon 1 and Sogongon 2 reported 0% compliance for all intervals.
1 0 0.00% NA 2 0 0.00% NA 3 1 0.00% NA 4 1 0.00% NA 5 0 0.00% NA 6 0 0.00% NA 7 0 0.00% NA 8 2 0.00% NA 9 6 0.00% NA 10 3 0.00% NA 11 4 0.00% NA 12 3 0.00% NA 13 3 0.00% NA 14 3 0.00% NA 15 4 0.00% NA 16 2 0.00% NA 17 1 0.00% NA 18 2 0.00% NA 19 0 0.00% NA 20 0 0.00% NA 21 0 0.00% NA 22 2 0.00% NA 23 5 0.00% NA 24 3 0.00% NA Plant: Sogongon 2 Date: 20-Apr-2018 Requirement: 80% Speed Droop: 5% Deadband Setting: 0.10 Hz Capacity: 20.0 MW Static Gain: 6.67 MW/Hz
1 0 0.00% NA 2 0 0.00% NA 3 1 0.00% NA 4 1 0.00% NA 5 0 0.00% NA 6 0 0.00% NA 7 0 0.00% NA 8 2 0.00% NA 9 6 0.00% NA 10 3 0.00% NA 11 4 0.00% NA 12 3 0.00% NA 13 3 0.00% NA 14 3 0.00% NA 15 4 0.00% NA 16 2 0.00% NA 17 1 0.00% NA 18 2 0.00% NA 19 0 0.00% NA 20 0 0.00% NA 21 0 0.00% NA 22 2 0.00% NA 23 5 0.00% NA 24 3 0.00% NA