Api 510 Open 5
Api 510 Open 5
Api 510 Open 5
1. A PQR was qualified in 5G position using a new welder. But production welding is to be done
by the same welder in 3G position. Which of the following are applicable as a minimum?
2. A procedure is required with preheat temp = 250°F. Two WPS were made based on this PQR.
All other parameters being same WPS (A) showed preheat temp = 280°F and WPS (B) showed
preheat temp = 145°F, will you,
3. In a certain PQR for SMAW, the electrodes used for all passes were of AWS classification (E
7018). Corresponding WPS also showed filler materials as E 7018. Now the manufacturer
proposes to change the filler material in WPS to E 7015. Will you ask manufacturer to:
4. A PQR in GTAW process was qualified with PWHT with A 516 Gr. 70 material, ¾” thick. The
thickness for production welds is 1.0 inch, but without PWHT. The manufacturer claims that the
same PQR will be O.K. What is your assessment?
6. A procedure is qualified with Base metal thk = 20mm . Two WPS were made based on this
PQR. Other parameters being same, WPS (A) showed Base metal thk = 38 mm and WPS (B)
showed B. M. thk = 6mm, will you:
7. A welder has made 25 SMAW groove welds, but the guided bend test for the welder's
qualification was never performed. In order to avoid cutting out all of the production welds made
by this welder, which of the following minimum steps would be taken to validate the qualification?
a. Radiograph the welder's first production weld and accept the qualification based on acceptable
weld quality by radiography.
b. There is no alternative to qualifying a welder by the guided bend test.
c. Have the welder prepare a test coupon and have the bend test done on that. If bend test is
okay, accept the welds already made.
d. Radiograph all 25 welds, regardless of the governing specifications for sample selection.
8. In a radiographic examination of butt weld (Thk= 3.5 in.) the Geometric unsharpness shall not
exceed :
a. 0,02"
b. 0.04"
c. 0.03"
d. None of above
9. Select suitable Hole type (source side) penetrameter for following weld joint:
a. No. 20
b. No. 25
c. No. 30
d. None of the above
10. If type of penetrameter in above question is changed to wire type what shall be the wire
designation (wire diameter in inch)?
11. For gteel plates and welds to be checked by –LPI, what shall be the penetration time for
Penetrant
12. After applying the developer the examiner checked four welds for surface defects after
following period, weld A - After 5 minute, weld B after 10 minutes, weld C was checked after 30
minutes and welds D after 65 minutes which of the welds were checked wrongly
a. Weld A and B
b. Weld C and D
c. Weld D only
d. Weld A and D
13. For MT examination by Prod technique the spacing between prods sha 11 be between
a. 4 inch to 12 inch
b. 4 inch to 10 inch
c. 3 inch to 10 inch
d. 3 inch to 8 inch
14 Calculate estimated inspection period for external and internal inspection for a vessel whose
remaining life is estimated as 12 years.
15. According to a WPS the material used is SA516 Gr.70 and the electrode used is E-7018.
What is the P No. and F No.?
a. 1 and 4
b. 4 and 1
c. 2 and 4
d. 4 and 2
API-510-OPEN-5 ANSWER KEY
Q. NO. ANSWER
1 D
2 B
3 B
4 B
5 C
6 D
7 A
8 B
9 B
10 D
11 D
12 D
13 D
14 B
15 A