3 Green Lift Checklist Form
3 Green Lift Checklist Form
3 Green Lift Checklist Form
1. GENERAL INFORMATION
1.1Project 1.2 Date
Sub - C Rigger Responsible for Lift TPSK Supervisor TPSK HSSE Manager
Green Lift Checklist
Lifting Plan
1. List of Lifting Equipment
Steel Webbing Lifting Chain
Hook Chain Other Other Other Other
Sling Sling bar block
Size
Capacity load
(Tons)
Weight/each
Number
Total weight
2. Calculation
1 Crane Capacity Tons
2 Boom Length M
3 Height of lifting M
4 Radius M
5 Max. Load from load chart (R) vs (H) Tons
6 Lifting Capacity rate
Total Weight X 100
Max Load from Load Chart %