N N N N: Norte Proyecto Norte Geografico Project North Geographical North
N N N N: Norte Proyecto Norte Geografico Project North Geographical North
N N N N: Norte Proyecto Norte Geografico Project North Geographical North
THIS DRAWING PRODUCED BY STERLING & WILSON SOLAR PVT. LTD. AGENCIA EN CHILE IN
CONNECTION WITH THE PROJECT (SANTA ISABEL CHILE), INCLUDING ITS COPYRIGHT AND
INTELLECTUAL PROPERTY HEREIN, ARE AND SHALL AT ALL TIMES REMAIN THE PROPERTY OF
STERLING & WILSON SOLAR PVT. LTD. AGENCIA EN CHILE, UNLESS OTHERWISE AGREED IN
WRITING BETWEEN THE PARTIES. IN NO EVENT SHALL THE OWNER COPY OR USE THE
DRAWING FOR ANY PURPOSE OTHER THAN THOSE IN RELATION TO THE PROJECT WITHOUT
THE PRIOR WRITTEN PERMISSION OF STERLING & WILSON SOLAR PVT. LTD. AGENCIA EN
N N N N TERMINAL RECTO PARA
CHILE.
A A
CABLE 4/0 MALLA GENERAL
ITEM CANT. DESCRIPCION
STRAIGHT CONNECTOR
FOR 4/0 CABLE TAPA METALICA 1 9450.00 m. CABLE AWG 4/0 Cu 107mm2 Ø13mm
B
1 2 3 STRAIGHT CONNECTOR
FOR 4/0 CABLE 7 603
Unid. SOLDADURA CADWELD TIPO "T" UNION CABLE
4/0 CON 4/0 B
GENERAL GRID
= =
C
DETALLE P.a.T. TAPAS METALICAS PARA CANALETAS 4 3635.00 m. CABLE AWG 4/0 Cu 107mm2 Ø13mm C
7 STRAIGHT CONNECTOR
=
D D
=
4000
SOLDADURA EN "T"
5
CASETA CONTROL 4
5600
B DIAGONAL
CONTROL ROOM 4 6
=
A
PAR N
10
3 DETALLE P.a.T. PARRILLA DE OPERACION
=
O
ESCALA 1:20
O BAD UCCIÓ
APR NSTR
1
=
3800
SCALE 1:20 20 0
.2
F N.T.E. 14 . 05 F
=
CASETA CONTROL 3
5600
C DIAGONAL
CONTROL ROOM 3
NOTAS:
1. LAS DIMENSIONES SE EXPRESAN EN mm. (S.I.C.)
=
0.60
2. LAS COTAS PREVALECEN SOBRE LA ESCALA DEL DIBUJO
3. LA PROFUNDIDAD DE ENTERRAMIENTO DE LA MALLA DE P. a T.
SERA 0.6m BAJO EL N.T.E.
=
3800
FUNDACIÓN.
TERMINAL RECTO PARA 6. EL DISEÑO DE LA MALLA DE PUESTA A TIERRA ES PRELIMINAR.
=
D DIAGONAL
CONTROL ROOM 2
0.50 0.35 Cu 40x3x550 mm 1. THE DIMENSIONS ARE EXPRESSED IN mm. (SIC.)
2. THE DIMENSIONS PREVAIL OVER THE SCALE OF THE DRAWING
=
0.60
PROVIDED WITH SUITABLE LENGTHS AND THEIR CONNECTION
=
H H
SHALL BE MADE WITHOUT INTERMEDIATE JOINTS OR LEADS TO
4 OTHER EQUIPMENT
=
4000
FOUNDATION.
1 6. GROUNDING SYSTEM DESIGN IS PRELIMINARY. IT MUST BE
7 REVIEWED BY ELECTROTIERRA OR SIMILAR.
=
P. a T.
1
A MALLA PRINCIPAL A MALLA PRINCIPAL
=
E DIAGONAL X
I CONTROL ROOM 1 CÁMARA DE INSPECCION I
=
=
B 11-19 FOR THE CLIENT EMISSION A.G.G. A.M.S.
=
3700
=
2 PROJECT TITLE:
2250
=
4000
=
SERVICIOS GENERALES
=
J J
CLIENT:
BUILDING
2 3 2
=
4000
2000
GENERAL SERVICES
=
3 3 2 EPC CONTRACTOR :
=
2000
=
=
2 2
=
3000
=
K K
3100 2000 2000
DRAWING TITLE:
DETALLE
ANA MARIA
DETAIL OVERALL EARTHING
SCALE 1:100 LAYOUT
PLANTA GENERAL
ESCALA 1:250 DRAWING NO : SCALE
SWLD-TOTL-CHL-190MWP-E-DWG-OEL-4307 1:250
GENERAL LAYOUT DRAWN A.G.G. SHEET Nº. 1 OF 1
SCALE 1:250
CHECKED A.M.S. PAPER SIZE A1
L APPROVED I.C.L. L