Day: Date: Department: Project

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Project : Aqaba Screening Project

Day : SAT
Date : 09.01.2021
Department : Electrical
Tasks Done by Today
1
follow up road crossing excavation for LV, MV and control Cable
2
Assembly and Install lighting Terminal Boxes for stair Case.

3
Engineering: Follow Up the Distribution Board submittal with suppliers
4
Engineering: Follow Up with Volt Automation regarding the pending Submittal.
5

Next Working day

1
follow up road crossing excavation for LV, MV and control Cable
2
Stair Case Lighting Terminal Boxes and Counduit Installations
3
Engineering: Follow Up the Distribution Board submittal with suppliers
4 Engineering: Follow Up with Volt Automation regarding the pending Submittal.
5

Issues/ Requirements

Staff

Name Daily Working


Hours Over Time Hours
1
Supervisor 8
2
Technician (1) 8
3
helper (2) 8
4

10

11

12

Resp. Engineer: Ahmad Dagamseh