Question No : 1

A QA department expecting to test a new application in the next quarter. Which low-cost
solution can the cloud administrator take to help reduce the performance impact on other
departments?

A. Block out dates for the QA department exclusive access to the cloud resources by
moving the server resources server over to a QA only server pool.
B. Use the IO Calendar tab to find projected low cloud utilization periods the QA
department cloud schedule for their test.
C. Review SiteScope records to find what times of the day utilizations lowest and
recommended the QA department test them
D. Plan and order additional servers and storage to add the cloud resources pools prior to
the planned testing.

Answer: C
Reference: http://www8.hp.com/us/en/software-
solutions/software.html?compURI=1174244#.UMh1Q3NetU4 (HP SiteScope monitor
types, first paragraph)

Question No : 2

A QA department wants to have an account that can build templates for their own people to
use, without needing to go through administrative processes to configure them. To provide
this level of access, which user group does this account need to be added?

A. HPIO_Users
B. HPIO_Architects
C. HPIO_Administrators
D. HPIO_Designers

Answer: B

Question No : 3

A customer needs a service that consists of a physical server with one NIC that uses
multiple VLANs. Which IO Designer template feature addresses this need?

"A Composite Solution With Just One Click" - Certification Guaranteed 2


HP HP0-D23 : Practice Test
A. VLAN multi-tenancy
B. Load-balanced network
C. Network template
D. Network trunk

Answer: D

Question No : 4

What does this icon represent in the IO Designer interface?

A. A network trunk
B. An iSCSI network
C. A single VLAN
D. A pair of physical networks

Answer: A
Reference: http://h10032.www1.hp.com/ctg/Manual/c03326771.pdf (page 65)

Question No : 5

There are a number of preconfigured discovery jobs displayed in the Discovery pane. What
is the recommended first job to be run?

A. Physical servers
B. CMS and its management processors
C. Onboard Administrator
D. Management processors

"A Composite Solution With Just One Click" - Certification Guaranteed 3


HP HP0-D23 : Practice Test
Answer: B

Question No : 6

Which tool is used to register Microsoft System Center Virtual Machine Manager?

A. HP OO
B. HP IO
C. HP IC
D. HP VMM

Answer: C
Reference: http://h18004.www1.hp.com/products/servers/management/ice/index.html (see
usage scenarios, 4th heading)

Question No : 7

What are Central Management Server (CMS) best practices? (Select two)

A. License and manage CMS as a logical server.


B. Install the CMS on a virtual server.
C. Configure CMS to boot from SAN with redundant boot volumes.
D. The CMS and vCenter should share the same physical server.
E. Do not license and manage CMS as a logical server.

Answer: C,E

Question No : 8

A template is being created for a Microsoft clustering environment. When deploying the
nodes for a cluster, the Cluster Wizard gives an error that it is not able to create the cluster.
What is the probable cause of this error?

A. The OS disks are not set to bootable.


B. Disks are not set up with redundant paths.

"A Composite Solution With Just One Click" - Certification Guaranteed 4


HP HP0-D23 : Practice Test
C. Data disks are set up with different RAID levels.
D. Data disks are not shared between the servers in the group.

Answer: B

Question No : 9

A customer has a c7000 enclosures with 16 ProLiant BL460c G7 server blades. Ten of the
server blades are VMware ESXi 5 hosts and the remaining six are Microsoft Windows
Server 2008 R2 servers. The windows servers need to be virtualized to allow all 16 servers
to became ESXi 5 hosts. Which licensing is required to perform Physical to Virtual (P2V)
migrations?

A. HP RDP for ProLiant servers


B. HP Insight Dynamics for ProLiant
C. HP Insight Control for BladeSystem
D. HP iLO Advanced for BladeSystem

Answer: C
Reference:
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c01658940/c01658940.pdf
(Page 9, HP ProLiant HP Server Migration Pack – this software is used for P2V migrations)

Question No : 10

Which HP software product enables IT organizations to provision compute resources


consistently and automatically, from pools of shared resources using a self-service portal?

A. HP System Insight Manager


B. HP Operation Orchestration
C. HP Insight Control Server Deployment
D. HP Insight Orchestration

Answer: D
Reference:
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c02015836/c02015836.pdf
(page 6, provision infrastructure consistently)

"A Composite Solution With Just One Click" - Certification Guaranteed 5


HP HP0-D23 : Practice Test

Question No : 11

What is the communication between HP SIM and vCenter validated?

A. Matrix OE Virtualization
B. Licensing Manager
C. Task Credentials
D. VME Settings

Answer: D
Reference:
http://h20000.www2.hp.com/bizsupport/TechSupport/Document.jsp?lang=en&cc=us&taskI
d=110&prodSeriesId=4223783&prodTypeId=457757&objectID=c02716200

Question No : 12

How is a managed node configuration validated in HP SIM?

A. Re-run all discovery tasks


B. Run the identity System task
C. Run MSSW
D. Display/edit the VME settings.

Answer: C

Question No : 13

Review the exhibit.

The environment has a discovery job set up in HP SIM as shown in the exhibit. one of the
systems recently required the Administrator account password to be changed, and now
there are credential error showing up in the logs. What is the best option to adjust the
discovery job to address this problem?

"A Composite Solution With Just One Click" - Certification Guaranteed 6


HP HP0-D23 : Practice Test

A. Change the password on the system back to the original one.


B. Add this server to the Ping exclusion range.
C. Add a new Administrator entry with the new password.
D. Chang the Administrator password under Sign-In Credentials to be the new password
for the system.

Answer: D

Question No : 14

When is the template validated during the template creation process?

A. During design
B. During publishing
C. When saving
D. After publishing

Answer: A
Reference: http://blogs.visolve.com/?p=290 (5. Testing phase)

Question No : 15

Your CloudSystem Matrix environment consists of a single c7000 blade enclosures with 16
blades and a mix of physical servers and hypervisor hosts. You are asked to provision 40
additional virtual servers for a two-week project and determine that the CloudSystem Matrix
resources are insufficient. What is the most cost-effective way to add the additional
resources to the system?

A. Add an additional blade server to the existing c7000 enclosures.

"A Composite Solution With Just One Click" - Certification Guaranteed 7


HP HP0-D23 : Practice Test
B. Add a VirtualSystem VS1 solution.
C. Add an existing HP ProLiant server to the extended infrastructure.
D. Add a CloudSystem Matrix Expansion kit.

Answer: D

Question No : 16

There are many definitions of what a cloud is, but most people will go to Gartner, forester,
or NIST for an industry standard definition. What are Gartner’s key cloud attributes? (Select
two)

A. Shared (multi-tenancy)
B. Dedicated connections
C. Distributed charging
D. Web-based charging
E. Service-based

Answer: A,E
Reference: http://www.gartner.com/it/page.jsp?id=1035013

Question No : 17

An end user requested an HP Infrastructure Orchestration service from the self-service


portal. After a few minutes, he realizes that he made a mistake and wants to cancel the
request. Which statement is true in this solution?

A. This job can only be cancelled by a member of the HPIO_Administrator group.


B. This job can be cancelled by this user in the My Request tab.
C. This job cannot be cancelled because it is already in an active state.
D. This job can be cancelled by this user in the My Services tab.

Answer: B
Reference:
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c02784628/c02784628.pdf
(page 75, my requests)

"A Composite Solution With Just One Click" - Certification Guaranteed 8


HP HP0-D23 : Practice Test

Question No : 18 HOTSPOT

Match the cloud service provider with the correct cloud deployment model.

Note: Options may be used more than once.

"A Composite Solution With Just One Click" - Certification Guaranteed 9


HP HP0-D23 : Practice Test

Answer:

"A Composite Solution With Just One Click" - Certification Guaranteed 10


HP HP0-D23 : Practice Test

Question No : 19 HOTSPOT

In which order does Matrix Infrastructure Orchestration allocate storage pools?

"A Composite Solution With Just One Click" - Certification Guaranteed 11


HP HP0-D23 : Practice Test

Answer:

"A Composite Solution With Just One Click" - Certification Guaranteed 12


HP HP0-D23 : Practice Test

Question No : 20

Microsoft Office 365 is an example of which cloud service model?

A. Software as a Service
B. Platform as a Service
C. Infrastructure as a Service
D. Cloud as a Service

Answer: A

Question No : 21

The Prod department is determining budget numbers for the next fiscal year and would like
to know if the projected growth of 15% exceed the current cloud infrastructure resources.

"A Composite Solution With Just One Click" - Certification Guaranteed 13


HP HP0-D23 : Practice Test
Which HP tool can the cloud administrator use to verify how historical workloads have fit in
the environment and forecast resource utilization based on supplied growth numbers?

A. Matrix OE capacity planning


B. Data Center Smart Grid
C. SiteScope
D. Insight Control performance management

Answer: A

Question No : 22

HP Converged Infrastructure provides resources to which HP Cloud Functional Reference


Architecture layer?

A. Supply
B. Portal and Service Access
C. Delivery
D. Demand

Answer: A

Question No : 23 HOTSPOT

Match the catalog and repository type with its correct HP Cloud reference Architecture
layer?

"A Composite Solution With Just One Click" - Certification Guaranteed 14


HP HP0-D23 : Practice Test

Answer:

"A Composite Solution With Just One Click" - Certification Guaranteed 15


HP HP0-D23 : Practice Test
Question No : 24

Which activity can be accomplished without cloud administrator intervention/approval?

A. Changing the deactivation action to de-provision


B. Reducing the number of complete resources
C. Reducing the lease period for a service
D. Reactivating an expired service

Answer: D

Question No : 25

It is January and the Development department is working on a new application. They are
using servers for their development environment. Management decides that the
development department should work on a problem in the current application for the next
two months. They will use another service for troubleshooting. In April, they will start
working on the new application again.

What should the development department do with the new application development
service?

A. Extend the lease to a date past April.


B. Delete the service and recreate in April.
C. Change the lease start to April.
D. Reduce the lease to February and reactivate in April.

Answer: D

Question No : 26

A customer has a requirement for end-user authentication with mapping of the end-user to
a service. Which reference architecture layer does this requirement map to?

A. Support
B. Demand
C. Supply
D. Delivery

"A Composite Solution With Just One Click" - Certification Guaranteed 16


HP HP0-D23 : Practice Test
Answer: B
Reference:
http://www.qlogic.com/OEMPartnerships/HP/Documents/converged/Solution_Block_4AA2-
6453.pdf (page 58, see figure 21)

Question No : 27

Refer to the exhibit.

What is the purpose of the highlighted button?

A. Setting a fixed cost on the service template


B. Converting the service template to use global cost units
C. Editing the cost of server resources in the service template
D. Setting a billing code for the service template

Answer: A

Question No : 28

Refer to the exhibit.

"A Composite Solution With Just One Click" - Certification Guaranteed 17


HP HP0-D23 : Practice Test
When logging on as an HPIO user, which phases of Matrix Infrastructure Orchestration
service creation process are executed before approval?

A. Publication
B. Deletion
C. Creation
D. Reservation
E. Allocation

Answer: C,D

Question No : 29

In HPIO Designer, which additional processes can be added to a template besides the
servers, disks, and networks? (Select two)

A. Workflows
B. Fixed accounts
C. Performance requirements
D. Scripts

Answer: A,D
Reference:
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c03429166/c03429166.pdf
(page 11, see figure 16 – page 12, see figure 17, software policies)

"A Composite Solution With Just One Click" - Certification Guaranteed 18


HP HP0-D23 : Practice Test
Question No : 30

What is recommended when enabling on-demand storage provisioning?

A. Thin provisioning
B. Capacity constraints
C. LUN masking
D. Storage tags

Answer: A
Reference: http://en.wikipedia.org/wiki/Thin_provisioning (overview, first paragraph)

Question No : 31

Which HP Security solution is used to inspect packets and block malicious packets?

A. HP ArcSight
B. HP Fortify
C. Hp Enterprise View
D. HP Tipping Point

Answer: D
Reference: http://hp.sharedvue.net/sharedvue/resources/?rl=networking-university-of-
leeds-case-study-4aa2-3848enw&pid=63&sid=&lcid= (page 2, second paragraph)

Question No : 32

While reviewing a proposal for HP CloudSystem Matrix, the customer asks you to demo the
application provisioning aspect of the solution. The customer is particularly interested in
deploying the LAMP stack on a RedHat 5.5 operating system and having the build
validated with a compliance report.

Which demo is used to map to the customer requirements?

"A Composite Solution With Just One Click" - Certification Guaranteed 19


HP HP0-D23 : Practice Test
A. Service catalog: Establishing a service catalog for RedHat Linux
B. Infrastructure: HP CloudSystem Matrix 7.0 Cloud Bursting to SAVVIS
C. Infrastructure: HP CloudSystem Matrix Provisioning applications with HP Server
Automation
D. Infrastructure: Designing and provisioning IT infrastructure services

Answer: A

Question No : 33

What is a benefit of HP FlexFabric Networks?

A. Optical backplane technology


B. iLO management engine integration
C. Reduction in switch count
D. Distributed management

Answer: C
Reference: http://h18004.www1.hp.com/products/solutions/converged/ff-4aa0-7725enw.pdf
(page 2, HP FlexFabric benefits, second bulleted point – read the entire paragraph)

Question No : 34

Which Cloud Service Automation for Matrix (CSA for Matrix) component provides
application provisioning in the HP CloudSystem Matrix solution?

A. HP Insight Control deployment


B. HP Server Automation
C. HP Operations Orchestration
D. HP SiteScope

Answer: B
Reference:
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c03429166/c03429166.pdf
(page 2, executive summary, first paragraph)

"A Composite Solution With Just One Click" - Certification Guaranteed 20


HP HP0-D23 : Practice Test

Question No : 35

A law firm has been running on HP ProLiant servers with an HP P6500 EVA for storage.
The firm would like to capitalize on their existing investment and is considering HP
CloudSystem Matrix Conversion Services. There is a desire to implement disaster recovery
while improving performance and scalability at the main data counter.

Which solution accurately fits the customer needs?

A. Utilize the existing equipment at a disaster recovery site and deploy HP CloudSystem at
the main site.
B. Deploy Hp CloudSystem Enterprise at a remote facility and provide high speed access
to that facility from both the main and recovery sites.
C. Upgrade the hardware at the main site and use the public cloud for disaster recovery.
D. Leverage the public cloud to provide both primary resources and disaster recovery
capability.

Answer: B

Question No : 36

HP CloudSystem Matrix requires the CMS to be hosted on which HP server? (Select three)

A. ProLiant DL
B. Integrity BL i2
C. ProLiant BL
D. ProLiant SL
E. Integrity rx
F. ProLiant ML

Answer: A,C,F
Reference:
http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c03231395/c03231395.pd
f (page 9, HP Proliant CMS options)

"A Composite Solution With Just One Click" - Certification Guaranteed 21


HP HP0-D23 : Practice Test
Question No : 37 HOTSPOT

Match the cloud delivery models to the correct characteristics.

Answer:

"A Composite Solution With Just One Click" - Certification Guaranteed 22


HP HP0-D23 : Practice Test

Question No : 38

A customer evaluating HP CloudSystem solutions has three divisions: R & D. Internal


Operations, and Customer Support. Each department is already running a virtualized
environment with complex VLANs, high-availability virtual machines for critical workloads,
and needs to maintain clear security boundaries. What should be incorporated into a
solution design to specifically address these concerns?

A. Data center Smart Grid mapping


B. Capacity Center Smart Grid mapping
C. Matrix Operating Environment organizations
D. Insight control server deployment

Answer: D

Question No : 39

"A Composite Solution With Just One Click" - Certification Guaranteed 23


HP HP0-D23 : Practice Test
Which HP Converged System family includes offerings such as Autonomy and vertica?

A. HP AppSystems
B. HP CloudSystem
C. HP VerticalSystems
D. HP VirtualSystem

Answer: A
Reference: http://www.echannelline.com/usa/story.cfm?item=28099 (see 11th paragraph
and search for autonomy)

Question No : 40

You are setting up an Hp Converged Cloud Workshop for your customer. Which customer
level should be invited to this session?

A. CMO
B. CIO
C. COO
D. CEO

Answer: B
Reference: http://h20195.www2.hp.com/V2/GetPDF.aspx/4AA3-4210ENW.pdf

Question No : 41

For which security purpose can the HP LeftHand P4000 storage be used within the HP
CloudSystem Matrix environment?

A. HP Integrity boot LUNs


B. VM data stores
C. Boot storage for virtual servers
D. Boot storage for physical servers

Answer: B

"A Composite Solution With Just One Click" - Certification Guaranteed 24


HP HP0-D23 : Practice Test

Question No : 42

Which product implements a centralized event and log registration for security reporting?

A. HP SiteScope
B. HP Fortify
C. HP Intelligent Management Center
D. HP ArcSight

Answer: D

Question No : 43 HOTSPOT

Match the industry terminology with its functionality.

"A Composite Solution With Just One Click" - Certification Guaranteed 25


HP HP0-D23 : Practice Test

Answer:

Question No : 44

"A Composite Solution With Just One Click" - Certification Guaranteed 26


HP HP0-D23 : Practice Test
What is an advantage of Intelligent Resilient Framework (IRF)?

A. Enhanced bandwidth and availability


B. Need for routing eliminated
C. Spanning Tree Protocol support
D. Integrated HP CloudSystem deployment

Answer: B
Reference: http://h17007.www1.hp.com/docs/reports/irf.pdf

Question No : 45

Which core component is provided by the HP CloudSystem Service Provider solution and
is not available with HP CloudSystem Matrix or HP CloudSystem Enterprise?

A. Network Automation
B. Operations Orchestration
C. Storage Provisioning Manager
D. Aggregation Platform for SaaS

Answer: D
Reference: http://h18006.www1.hp.com/storage/pdfs/4AA3-6850ENW.pdf

Question No : 46

Which phase within the HP CloudSystem sizing and configuration process focuses on
these steps?

✑ Selection of CPUs and blades


✑ Calculation of the number of VMs per blade
✑ Number of blades and enclosures
✑ System specifications such as IP and SAN bandwidth
✑ Power and cooling requirements

A. Configure
B. Discover

"A Composite Solution With Just One Click" - Certification Guaranteed 27


HP HP0-D23 : Practice Test
C. Size
D. Build

Answer: B

Question No : 47

In emerging cloud data centers, an increasing amount of application traffic is confined to


within the enclosure in which it was generated. Which type of traffic pattern does this refer
to?

A. L2 Aggregation Layer
B. East-West traffic
C. Virtual Ethernet Port Aggregation (VEPA)
D. North-South traffic

Answer: B

Question No : 48

A scientific research firm wants to re-architect its IT infrastructure to improve its agility,
SLAs, and transparency. The firm has fluctuating workloads, a limited budget, and extreme
data security constraints. Which model addresses the customer needs?

A. Public cloud based on HP Cloud Compute offering


B. Private cloud with traditional IT connected to it
C. Hybrid cloud with bursting to a cloud service
D. Community cloud implemented in conjunction with other research firms

Answer: B

Question No : 49

A very large enterprise has a heavy investment in traditional IT based on HP blades and
storage and wants to expand into the cloud but is quite risk averse. The customer has a
large SAP environment where most of the core business intelligent is located. What would
be the recommended use case for this customer?

"A Composite Solution With Just One Click" - Certification Guaranteed 28


HP HP0-D23 : Practice Test
A. Hybrid cloud for the entire SAP environment
B. HP Cloud Services
C. Dev/test as a service in a private cloud
D. Amazon Cloud for their dev/test needs

Answer: B

Question No : 50

Which information contributes to designing a solution to best meet customer needs?


(Select two)

A. Hypervisor types
B. Software development tools
C. Cloud characteristics (IaaS, PaaS, SaaS)
D. Capacity management
E. Timeframe for the project

Answer: C,D

Question No : 51

A customer has an urgent need for 350 virtual servers in a development and test use case
scenario. Which HP cloud solution is proposed?

A. HP Cloud Service Automation


B. Hp CloudSystem Enterprise
C. HP CloudSystem Service Provider
D. HP CloudSystem Matrix

Answer: D

Question No : 52

When engaging a customer, CI-MM can be used to determine the customer maturity level.
Which terms best describes the feature of Stage 5, Adaptively Sourced Infrastructure?
(Select two.)

"A Composite Solution With Just One Click" - Certification Guaranteed 29


HP HP0-D23 : Practice Test
A. Optimized
B. Rationalized
C. Virtualized
D. Managed
E. Operated

Answer: A,C
Reference:
http://www.itaas.nu/pdf/HP_Converged_Infrastructure_Maturity_Model_Express.pdf (last
page, Management tools and processes)

Question No : 53

A customer is at HP CI-MM Stage 3 maturity. What is the status of their environment?

A. Rationalized technologies, architectures, management tools, and processes


B. Automated management and reallocation of infrastructure based on business processes
and needs
C. Standardized all elements of the IT architecture management tools and processes
D. Service-centric integrated IT processes supporting tiered service levels

Answer: A
Reference:
http://www.itaas.nu/pdf/HP_Converged_Infrastructure_Maturity_Model_Express.pdf (last
page, Management tools and processes)

Question No : 54

How is the "not counted" window defined in an SLA?

A. Amount of downtime without causing customer problems


B. Time period to start up the recovery process
C. Amount of time needed for application recovery
D. Time window where SLA is not active

"A Composite Solution With Just One Click" - Certification Guaranteed 30


HP HP0-D23 : Practice Test
Answer: A

Question No : 55

A customer HP CloudSystem Matrix environment currently consists of six BL460c G7


servers running Microsoft Windows 2008 R2 Hyper-V. The customer is planning to expand
his business and is expecting a 30% utilization increase. Which tool can be used to
forecast future server utilization?

A. HP Capacity Advisor
B. HP SiteScope
C. HP Insight management Advisor
D. HP Operations Orchestration

Answer: A
Reference:
http://h20427.www2.hp.com/campaign/techatwork/au/en/taw09post/pdf/dct/hp_whitepaper_
insight_capacity_advisor_a_look_under_the_hood.pdf (page 12, step 6)

Question No : 56

What is the Central Management System (CMS) high-availability recommendation?

A. HP ServiceGuard
B. Dual rack-mounted servers
C. Virtual appliance on clustered hypervisor
D. Redundant BL460c servers

Answer: A

Question No : 57

Architecting HP CloudSystem two-tier networks with HP IRF offers which benefits? (Select
two)

"A Composite Solution With Just One Click" - Certification Guaranteed 31


HP HP0-D23 : Practice Test
A. Lower power consumption
B. Reduced software licensing costs
C. Elimination of service contracts
D. Reduced cost of planned maintenance
E. Reduced management overhead and lower costs

Answer: D,E

Question No : 58 HOTSPOT

Match the appropriate core component to the HP CloudSystem offering.

Note: Options may be used more than once

"A Composite Solution With Just One Click" - Certification Guaranteed 32


HP HP0-D23 : Practice Test

Answer:

"A Composite Solution With Just One Click" - Certification Guaranteed 33


HP HP0-D23 : Practice Test

Question No : 59

Which tool provides a flexible, intuitive, graphical interfaces for network administrators to
quickly and efficiently architect network connectivity for cloud applications?

A. Virtual Service Interface (VSI) Connection Profiles


B. Virtual Application Network (VAN) Manager
C. Intelligent Management Console (IMC)
D. Virtual Application Network (VAN) Designer

Answer: D
Reference: http://h17007.www1.hp.com/docs/van/4AA4-0790ENW.pdf (page 5 - rapid
cloud application deployment and data center network provisioning – 4th paragraph and
Page 6, see figure 4)

"A Composite Solution With Just One Click" - Certification Guaranteed 34


HP HP0-D23 : Practice Test

Question No : 60

Your customer wants to configure ProLiant based cloud services with different disk sizes
and storage tiers to automate the creation of LUNs and SAN zoning. Which components
are needed to implement this in the customer HP CloudSystem Matrix environment?
(Select two)

A. LeftHand storage
B. Storage Automation
C. Storage Provisioning Manager
D. EVA or 3Par storage
E. Storage Essentials
F. Brocade Network Advisor

Answer: B,D

Question No : 61 HOTSPOT

A customer approves a proposed solution. Part of the HP CloudSystem Matrix Delivery


Services requires that three meetings be scheduled.

Match the HP CloudSystem Matrix Delivery service meeting with the correct phase.

Note: Not all choices may be used

"A Composite Solution With Just One Click" - Certification Guaranteed 35


HP HP0-D23 : Practice Test

Answer:

"A Composite Solution With Just One Click" - Certification Guaranteed 36


HP HP0-D23 : Practice Test
Question No : 62

Media scenario

Your customer is a digital media company, specializing in provisioning high transaction


websites, video streaming complex hosting, and demand management. The company
employs 100 IT professionals responsible for operating multiple data centers. The company
is known for investing heavily in new technology and services and for delivering highly
flexible services with low tolerance for downtime. Its infrastructure is tightly engineered,
consisting of the most recent HP and third-party hardware and proven ability to handle
record peak loads and maximum security using global best practice standards.

Refer to the scenario:

A customer wants to quickly implement a Linux cluster and manage it using the HP Insight
Cluster Management Utility (CMU)

Which path is appropriate for the customer?

A. Utilize a Cloud Map from www.hp.com/go/cloudmaps.


B. Deploy a High Performance Computing (HPC) rack of servers.
C. Leverage a public cloud computing resource.
D. Implement an HP CloudSystem Enterprise.

Answer: A

Question No : 63

Media scenario

Your customer is a digital media company, specializing in provisioning high transaction


websites, video streaming complex hosting, and demand management. The company
employs 100 IT professionals responsible for operating multiple data centers. The company
is known for investing heavily in new technology and services and for delivering highly
flexible services with low tolerance for downtime. Its infrastructure is tightly engineered,
consisting of the most recent HP and third-party hardware and proven ability to handle
record peak loads and maximum security using global best practice standards.

Refer to the scenario:

"A Composite Solution With Just One Click" - Certification Guaranteed 37


HP HP0-D23 : Practice Test
Recently, a company embarked on a journey to streamline business processes and gain
efficiencies and speed.

To support future growth and expansion, it needs to:

✑ Automate repetitive tasks in core business processes and standardize operations


✑ Increase the quality and auditability of these processes
✑ Implement regulatory standards associated with the media industry across servers
and networks

Which HP Cloud Service Automation (CSA) software components meet these customer
requirements? (.Select two)

A. HP Matrix Operating Environment


B. HP Operations Orchestration
C. HP Storage Provisioning Manager
D. HP Infrastructure Orchestration
E. HP Server Automation

Answer: B,E

Question No : 64

Media scenario

Your customer is a digital media company, specializing in provisioning high transaction


websites, video streaming complex hosting, and demand management. The company
employs 100 IT professionals responsible for operating multiple data centers. The company
is known for investing heavily in new technology and services and for delivering highly
flexible services with low tolerance for downtime. Its infrastructure is tightly engineered,
consisting of the most recent HP and third-party hardware and proven ability to handle
record peak loads and maximum security using global best practice standards.

Refer to the scenario:

A customer requires the ability to create, share, and enforce policies across its distributed
environments. Which HP product do you recommend to meet this requirement?

A. HP SiteScope
B. HP Operations Orchestration
C. HP Insight Control

"A Composite Solution With Just One Click" - Certification Guaranteed 38


HP HP0-D23 : Practice Test
D. HP Server Automation

Answer: D
Reference:
http://www.hp.com/hpinfo/newsroom/press_kits/2007/softwareuniversebarcelona/ds_servic
eauto.pdf (page 3, first paragraph)

Question No : 65

Media scenario

Your customer is a digital media company, specializing in provisioning high transaction


websites, video streaming complex hosting, and demand management. The company
employs 100 IT professionals responsible for operating multiple data centers. The company
is known for investing heavily in new technology and services and for delivering highly
flexible services with low tolerance for downtime. Its infrastructure is tightly engineered,
consisting of the most recent HP and third-party hardware and proven ability to handle
record peak loads and maximum security using global best practice standards.

Refer to the scenario:

A company is considering a new venture to create a cost-effective solution that allows them
to rapidly scale up and down without affecting resources, and customers only pay for what
they use.

To support this venture they are looking for a solution that will provide:

✑ Single services view across hybrid cloud


✑ Multi-hypervisor, multi-OS. heterogeneous infrastructure
✑ Intelligent automation and orchestration
✑ Rapid application and infrastructure deployment
✑ Third-party applications transparently to their customers

Which HP CloudSystem offering fulfills the key design considerations for the solution?

A. HP CloudSystem VS3 MC1


B. HP CloudSystem Matrix
C. HP CloudSystem Enterprise
D. HP CloudSystem Service Provider

"A Composite Solution With Just One Click" - Certification Guaranteed 39


HP HP0-D23 : Practice Test
Answer: C

Question No : 66 HOTSPOT

Media scenario

Your customer is a digital media company, specializing in provisioning high transaction


websites, video streaming complex hosting, and demand management. The company
employs 100 IT professionals responsible for operating multiple data centers. The company
is known for investing heavily in new technology and services and for delivering highly
flexible services with low tolerance for downtime. Its infrastructure is tightly engineered,
consisting of the most recent HP and third-party hardware and proven ability to handle
record peak loads and maximum security using global best practice standards.

Refer to the scenario:

A customer requires a compliance model across their automation solutions that gives them
visibility and control over globally distributed elements of their infrastructure.

Match the HP extended platform product to the compliance challenge.

"A Composite Solution With Just One Click" - Certification Guaranteed 40


HP HP0-D23 : Practice Test

Answer:

Question No : 67

Media scenario

Your customer is a digital media company, specializing in provisioning high transaction


websites, video streaming complex hosting, and demand management. The company
employs 100 IT professionals responsible for operating multiple data centers. The company
is known for investing heavily in new technology and services and for delivering highly

"A Composite Solution With Just One Click" - Certification Guaranteed 41


HP HP0-D23 : Practice Test
flexible services with low tolerance for downtime. Its infrastructure is tightly engineered,
consisting of the most recent HP and third-party hardware and proven ability to handle
record peak loads and maximum security using global best practice standards.

Refer to the scenario:

The digital media company needs to meet network compliance standards. Which extended
platform product is correct to recommend?

A. HP Network Automation
B. HP TippingPoint SMS
C. HP Atalla Network Security Module
D. HP Operations Orchestration

Answer: A
Reference: http://h18004.www1.hp.com/products/quickspecs/14017_div/14017_div.pdf
(page 1, Introduction)

"A Composite Solution With Just One Click" - Certification Guaranteed 42

You might also like