Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

IMPORT Drawing

Download as pdf or txt
Download as pdf or txt
You are on page 1of 48

1 2 3 4 5 6 7 8

Main distributor Main switch Car light Phase failure Control voltage power part
well
1 2 -X0 L11
L11/2.1
3 4 L21
+E +V L21/2.1
5 6 L31
3/N/PE AC L31/2.1
-X0 L1 -X0 L1 -K00
L1
L2 L2 /1-1.3 -F01 1
L2
L3 L3
L3
25A 400/230V 10A 2

-Q00 1 3 5 13 21 31 43 L12+B/2-2.1
-A73 L1 L2 L3
.7
provided -F02 1 21
14 22 32 44
by customer I I I
/2-2.3 /2-2.3
/2-2.3 /2-2.3 m<3 2 A 2
-K86
2 4 6 /2-2.4 22
14-20A N
-X80.1
L12/2-1.1
12
-A73 11
.5
1.2x design current (see data sheet) setting
-K1

-X0 N -X2 N N 14
N+B/2-2.1
-X0 N N
N N/2-1.1
PE PE -X0 PE -X2 PE
PE PE/1-1.1
21
-X0 PE -S86.1
PE+U/2.1
/2-2.2
-X80.1 22
-X2 PE
9 -X2 L13
L13+B/4.1

1/N/PE AC
-X0 1L1 -X0 1L1
L 1L1/1-2.1
-X2 1L2
25A 230V 1L2/1-1.1
-F00 1

10A 2

-X00
-X0 1N -X2 1N
1N+B/1-1.1
-X0 1N
N 1N/1-1.5
PE -X0 PE
PE

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + B
c CHECK Oetzel Aufzugswerke Page 1
Electric - Lighting 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Power contactor Car light


1L2/1.6 1L2

-X80.1 11

+V-X2 5
13 21 13
-S41 -X80.2 6
-K00
+S 14 22 .3 14
11 21 /9.7
-S00F +V-X12 6

12 22

+F

+V-X11 3
-X12 6

+F
-X11 3
-X80.2 7 -A18
-X200 3
/8.6
MC3
-K35

-X200 2

11 21
-S100 -X2 5
-A75 VM1
-X11 1 /15.2
12 22 /5.1
/4.4 MH3 -E41 1
-K4
-X2 PE PE
2
-X11 2

VM2
-X12 7 -X11 2 /15.2

-X41
+V-X12 7

+V-X11 PE +V-X11 2

-K00 A1

A2
1N+B/1.6 1N+B/8.1 1N/1.6 1N/1-2.1
PE/1.6 PE/1-2.1
1 2
/1.6
3 4
/1.6
5 6
/1.6
13 14
.6
21 22

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + B
c CHECK Oetzel Aufzugswerke Page 1-1
Electric - Lighting 349303065 K
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Well light
1L1/1.6 1L1

-F31 1

16A 2

1
-K31 A1
-K31
.2 2
A2

-X80.4 1 -X80.4 2 -X80.4 3


provided by customer
+V-X2 1 +V-X2 2 +V-X2 3

+S
13 max
-S31
10

14 -E31 L

PE
N

-X31

+V-X2 PE
1N

1N/1-1.8 1N
PE/1-1.8 PE/2-1.1
1 2
.3
3 4

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + B
c CHECK Oetzel Aufzugswerke Page 1-2
Well light 349303065 K
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Lift motor Eddy current braking Braking resistor

+U +S
-X1 L1
L11/1.8
L2
L21/1.8
L3
L31/1.8 R1 -R03
-K07 22
PE
1 3 5 /2-1.3 R2
1 3 5 -K06
-Q1 /6.4 2 4 6 R4
-K07
2 4 6 2 4 6 /2-1.3 R3
-K06.1
-X1 1
/6.3 1 3 5
L2
L3
L1

3
-Z03 line PE PE
U1 V1 W1
load
-L03
L1'
L2'
L3'

U2 V2 W2

-U03 -X1 11 12 13 -X1 23 20 21 19

FSR2

-X1 24 25 26 27

TMI
Control interface
KMB
-X917 1-15
-X1 PE -X514 1 2 -X1 U V W PE
PE+U/1.6

-X01 10 11 -X01 U V W PE
+M

-B03 -R01.1 U1 V1 W1
1-15
-M01
MS PE
sin
3 ~
cos -R01.2

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 2
Drive 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Eddy current braking Brake checking Brake


-X2 10
L12/1.8 L12/3.1

+U
-X512 3

1 1
-F2 -F1

2 2

-A07
~ VRB

(-) (+)

-X513 3 -X522 3 -X522 4

8 8
-K06 -K06.1
-K07 A1
/6.4 7 /6.3 7

A2
-X522 2 -X522 1

-X513 2 -X512 8
BR2
/2-2.7
-X514 3 4 7 8 9 10 -X512 7
BR3
/2-2.8
-X512 1 2 -X515 1 2 3 4 -X512 6
BR1
/2-2.7

+M
-Y07 -X07 5 6 7 8 9 10 -X07 1 2 3 4

1 2 -Y1 1 -Y2 1
1 1
R1 R2 -R1 -S1 -S2
/2.6
R3 R4 2 2
/2.6
3 4 2 2
13 14
/6.3
21 22

-X2 PE N2
N2
N
N/1.6 N/3.1
PE/1-2.3 PE/2-2.1
a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 2-1
Drive 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Manually operating brake


L12+B/1.8 L12+B/8.1

13 23
-Q00 -S86.1 -R86 U
/1.3 .2 -V86
+AKKU 14 24
/11.1
~(2) +(4)
Testing Y07-Y2

-X9 +12B
13 21 113 23 22 13 21 113 23 1
-S86.1 -Q00 -S86
-K86
/1.3 ~(3)
14 22 114 24 21 14 22 114 24 .4 2
2
6mm /1.7 .4 .5 .6
-X80.5 1
21 23
-G86 -X80.4 5 -S86 -S86
.4 .4 BR1
22 24 /2-1.8
ON +V-X2 30
-V86.1
-R86.1
+S-S102.1 21 330

-/~
~(2) +(4)
10-15V 230V n
DC AC
22 -C86 + -R86.2
2700 68k

+V-X2 31 -(1) ~(3)

-X80.4 6
2 -H86
6mm
+
31 Testing Y07-Y1
-Q00 -K86 A1
-X9 -12B /1.3
32 5 3
A2
-K86 -K86
.4 6 .4 4
-AKKU
/11.1 -X80.5 2 -X80.5 3
43
-Q00
/1.3 BR2 BR3
44 /2-1.8 /2-1.8

N+B/1.6 N+B/8.1
PE/2-1.8 PE/21.1
1 2
.7
3 4
.8
5 6
.7
13 14
21 22
/1.8

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + B
c CHECK Oetzel Aufzugswerke Page 2-2
Brake release - emergency evacuation 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Door drive
L12/2-1.8 L12

-X11 5

+F
-X11 5

-G50 3
/8-5.4
-X7
M
3 ~
-X7
1 2

-X2 PE

-X11 6

-X11 6

N/2-1.8 N

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 3
Door M2ZK8F5 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Safety switches Inspection Electrical recall

+B
L13+B/1.8 L13+B/21.1

3
S11 -S01
/7.2
.7
4

-X80.2 9 10 -X80.2 1 -X80.2 2


S1/5.1

-X2 L13 -X1 104 105 -X1 120 -X12 1 -X12 2 -X12 3

-X80.2 3 -X80.2 4
+F
+S-X34B 1 +S-X34B 6 -X1 115 -X12 1 -X12 2 -X12 3
L13+V +B
-X1 100 -X1 107 -X1 124
21 21 21
+S-S100 +S-S101B +S-S101F

22 22 22 21 1 3 5 7 9 11 13 15 17
-S140B -S44
1 3 5 7 9 11
+S-X34B 2 +S-X34B 7 -X1 116 /17.2 -S01
22 2 4 6 8 10 12 14 16 18
.5 /9.1 /5.3 /10.3 2 4 6 8 10 12
.5 /9.1 .5 /9.6
/9.6 .7
-X1 102

5 3
-S44 -S44 13 23 13 23
.5 .5 -S01B -S01F
21 +S-S102 11 6 4
+S-S132
n 14 24 14 24
-X1 108 -X1 109
22 12 /9.6 /9.6
13 21 21
+S-X34B 4 -S128 -S128
.5
14 22 22
.5

-X1 125

S12
/7.3
21 13 23 13 23 9
-S100 -S44B -S44F -S01
/1-1.2 .7
22 14 24 14 24 10
/9.1 /9.2
-X1 106
S41 S9
/5.2 /5.1

a DATE 25.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Sieck Aufzugswerke Page 4
Safety circuit 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Car door switch Landing door switch and locking switch

-X1 133 -X1 137 138


S1/4.8 S2/6.1

S14
-X12 4 -X12 5 /7.4
S13
/7.3

PE
+F +Sn
-X12 4 -X12 5
-X1 110 -X1 113 -X1 1 -X1 3
S32
11 10 /7.5

11 11
-S44 -S139
/4.5
12 12
PE

-S138 13

-X1 111 PE
S41 14
/4.5
-X1 12 -X1 9 PE
+B
-X50 1 PE 5 7 PE

S9/4.8
-S150 1

-A75 2
/1-1.3 MH3
PE
/7.2 -S150.1 1 +S1
-X25 1
-X1 1 -X1 3
2 S31
11 10 /7.5
-K903
-X50 2
3
-S139 11
-K901
-S158 1 12
PE

-K902 2 -S138 13

-X25 2 -X50 4
14

-X1 12 -X1 9 PE
5 7 PE
-X80.2 11

-X1 PE

PE+V PE+V/8.1
a DATE 25.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Sieck Aufzugswerke Page 5
Safety circuit 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Travel Acknowledgement travel contactor

+U

-X516 1 -X517 1
S2/5.8

13
-K07
/2-1.3 14

FLR FUR FOR


22 14 22 14
-K3 -K2 -K1
-K06.1 -K06 -K06 -K06.1
.3 21 .4 13 .4 21 .3 13

-X517 2 -X517 3

X91:1 X91:2 X91:3


TMI
-K3 -K2 -K1
Control interface

- -
~ ~ ~ ~
-V06.1 + -V06 +

-X517 6 -X517 4

-K06.1 A1 -K06 A1

A2 A2

-X517 7 -X517 5
-X516 3
N3

1 2 1 2
/2.4 /2.4
3 4 3 4
/2.5 /2.5
5 6 5 6
/2.5 /2.5
7 8 7 8
/2-1.7 /2-1.6
13 14 13 14
.7 .5
21 22 21 22
.3 .6

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 6
Travel contactors 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Acknowledgement safety circuit

+S2 S32/5.5

-A30 1
/8-4.4
MS2

-X1 2
S13/5.3 S14/5.7
6

-X80.2 5 12
+B
S11/4.4 S12/4.8
+S1 S31/5.5
-A75 -X24 2 3 4 5
/5.1 -A30 1
/8.3 MH3 /8-4.4
MS2

~
- +

D6.50-N074
~ ~
- +
~

2
-X24 1 6

-X1 2
N2+B/21.1
6
-X80.1 10 -X80.2 8

-X1 N3 -X1 N3
N3+V N3+V
-X2 N2
N2+V N2+V

a DATE 25.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Sieck Aufzugswerke Page 7
Feedback 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Control voltage information part Control voltage group Floor selection Re-levelling
Busdistributor
24V+V
-X9 +24
-X13 1

-X80.3 9
+B +F
-X9 +24G -X80.4 9 -X8 +24G
L12+B/2-2.8 L12+B +24G
1L2+B 1L2+B
-F05 1
-B43 -B27
-X9 +24 RD RD
24V+B/17.6 4 A 2

-X80.4 10 -X8 +24S


+24S/8-4.1
BN BK BN BK

-V11 -X13.3
H
+(4) 1 /8-1.1

-A75 L -A18
-X7 1 -X4 1 2 /8-1.1 -X3 10 -X14 1 2 3 -X16 1 2 3
~(2) /7.2 /1-1.6
/9.4 MH3 /8-5.2 MC3 +24V 0V +24V 0V
-X13 3
-G11 -X1 3 4 -X2 1 2 5 -X8 1 1 -X13.4 -X13 -X3 1
4 7 7 H
Local
MN9 L/ L +24V/ +24V
2 2 2 bus
10A -H7 -H5 L
8 8
-F1
4 A -X23 1 -X80.3 -X13.1 -X13 3
Ini H
7 15 12 Well
N/ N 2 4 bus
-X1 2 5 1 -X2 3 4 7 8 -X7 2 -X4 2 Ini
8 14 13 L -X3 9

-X13.2
12
13 BusI
-X9 0V /8-4.3
0V+B Checking 14
1N+B/1-1.4 1N+B control voltage
N+B/2-2.8 N+B -X13.2D
PE+B PE+B 12
13 BusII
-X80.1 3
14

-X8 0V -X13 2
0VG/8-4.1 0V+U/9.3

-X9 0V
0V+V
-X9 PE

PE+V/5.8 PE+V

a DATE 25.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Sieck Aufzugswerke Page 8
Informationpart 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Busdistributor

H -A16
/8.5
/8-2.3

65230002903
L MG3
/8.5

-X3
1
2

-A76
/22.1
6510082680

MM +U
TMI
-X2 1
Control interface
2

-X906 15 8

-X13.5 2 1

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 8-1
Informationpart 349303065 K
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Connections for group

=1+V =2+V
=1+V-X8:+24G =2+V-X8:+24G
/8.4

-A16 -A16
/8-1.2
/8-4.2 MG3 120 J201 MG3 120 J201

H L H L
-X4 1 2 -X4 1 2

/8.4
=1+V-X8:0V =2+V-X8:0V

1 NYM-O 1x1,5 BK (W05n.1)


2 J-2Y(St)Y 2x2x0,6 StIIIBd
(W05n)

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 8-2
Connection groups 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Connections for group Well bus


-X8 +24S
+24S/8.4 +24S
BusI/8.5

-X13.2 12 13 14

H L Ini

A/8-4.2
B/8-4.2

C/8-4.3

D/8-4.3

E/8-4.3
+S2

-A16 -A30
/8-2.3 -X2 /7.5 -X26
MG3 1 MS2 1
/13.6
2 2
5 3 5 3
6 4 6 4

+S1
A/8-4.4
B/8-4.4

C/8-4.5

D/8-4.5

E/8-4.5

-A30
/7.5 -X26
MS2 1
/13.2
2
5 3
6 4
-R13 120
-X8 0V
0VG/8.4 0VG
a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 8-4
Informationpart 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Car bus

+F
-X9 +24
24V+F/9.1

-A18
/8.6 MC3
-X30 1 H
/9.1
-X93 1 2 L
2 3 Ini

-A40
/12.7 -X65
MF3 1
2
-X1
1 3
2 4

-G50
/3.1
/10.1
-X5
1
2
3
4 120
J3

-X40 4 5 6
-A68
/15.5 LMS1

-X4
1
2
3
-X9 0V 4 J3 120
0V+F/9.1

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 8-5
Informationpart 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Inspection operation Connections drive Recall operation Switching-off car light

+F +U +B
-X9 +24
24V+F/8-5.2 24V+F/10.1
7 TMI
-S44
Control interface
/4.5
8
5 7
-X9 20 -S01 -S01
0V B B A A
/4.7 /4.7
6 8
23 23
-X906 7 14 6 5 13 21
-S44B -S44F -S41
/4.5 /4.5 /1-1.5
24 24 22
23
-X9 21 -X9 22 -S01F
/4.7
24

23
-S01B
0V+U
/8.8 /4.7
24

-A18 -X15 4 -X15 3 -X13 3 4 5 6


/8-5.2
.3 MC3

-X15 2 -A75 -X19 1 4 3 2 5


+F /8.3
/11.2 MH3 +24V

-X9 25
-A18 -X3 8 7 5 6 -S703 -S701 -S704 -S700 -S702
10 .1 -H10 -H18 -H15
-S44
/10.4 MC3 1 n
/4.5
9 Car command Door control Testing Switching-off
landing calls
-X9 0V
0V+F/8-5.2 0V+F/10.1

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 9
Informationpart 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Door control Doorinspection Light screen

+F
-X9 +24
24V+F/9.1 24V+F/15.6

-B56

TX RX

-G50 -X2 1
/8-5.4
+24V

9
-X50 6
-S54
8 7

0V
TU TO
-X2 2 -X2 6
LT

0V

-X9 52
-A18 -X21 1 2
/9.3
16 /11.2 MC3
-S44
/4.5 -X22 1
15

0V (-S44:9)

-X9 0V
0V+F/9.1 0V+F/15.6

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 10
Door M2ZK8F5 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Emergency supply Intercom unit Emergency call Emergency light

+B
-X9 +12B
+AKKU
/2-2.1
*
-A75 -X3 3
/9.4 -X31 2
/11-2.2 MH3
-J1 1 2 3
-G20 + -H4 -B23.2 -B23.1

12V - -F53
-X31 3
2 A +12V
-X1 3 4 5 -X1 2 1

*
-X9 -12B PE
-AKKU
/2-2.1 *
2
* = 2,5mm
-X80.3 2 3 4 -X80.3 5 6

+12V
/22.2
-X14 2 3 4 -X14 5 6

+F -A18
.2 -X92
1
-A18 /12.1 MC3
-X4 2 3 4 -X4 5 6 3 -S20F
/10.4
-X1 3 1
.6 MC3
Emerg. call
Emerg. light
+12V

-X9 3
-X90 -S1
1 3
1 -X1 4 2
-S20
-X101 1 2 -X100 1 2 -X1 3 1 4
1
2
-S1 -E1 -E20
2 -X94
-X1 4 2 1
3 -S20B
-B20.1 -B20.2 -X9 2 -X1 3 1
-X1 2 3 -X1 2 3 4 2
-S1
4
-B1 -B2
-X1 4 2

4
2

a DATE 11.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 11
Emergency call/Intercom unit 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Teleservice

-A75
/11.2
/14.1 MH3

-X6 1 2
-X13 1-9 -X12 1 2 3 4

-U75 - + 1-9 1 2 3 4

Modem only in case of Teleservice ThyssenKrupp

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + B
c CHECK Oetzel Aufzugswerke P a g e 11-2
Teleservice 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-A18 -A18 -A18 -A40 -H60


/11.6 .1 .3 /8-5.2
.3 MC3 .5 MC3 /14.7 MC3 MF3 MA7

Position
SU1 Overload indicator
X13 X913 S42.10 - S42.12
-X1 1-14
Case of fire
X12 X912 S42.7 - S42.9
Nudging device -X35
X11 X911 S42.4 - S42.6 1-14

-X31 1
-X19
-X10 5 -X910 5 1
-S42.3 3 -S52A -H48
-X1 3 1 -X1 3 1 -X1 1
Car
-S1 -H1 Door opening -S1 Overload -H1
command
-X1 4 2 -X1 4 2 -X1 2

6 -X910 6 4 2
2
3 -X910 3 +24
-S42.2
-X20
-X1 3 1 1
3 -S52Z
-S1 -H1
-X1 3 1
-X1 4 2
Door closing -S1
-X910 0V
4 -X910 4 -X1 4 2

1 -X910 1 4
-S42.1 2
-X1 3 1
-X31 5
-S1 -H1 -X5
1
-X1 4 2 3 -S24 -H67
-X1 3 1 -X1 1
2 -X910 2 Switching-off
-S1 Case of fire -H1
landing calls
-X1 4 2 -X1 2
9
0V
10 4 6
+24V
2

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + F
c CHECK Oetzel Aufzugswerke Page 12
Car 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Landing call Continued travel+position indicator


gong

+Sn -A30
-X12
1
MS.. 3 -S32B
-X1 3 1

-S1 -H1

-X1 4 2

4
2

+Sx -A30
/13-2.6 -X11
1
MS.. 3 -S32F
-X1 3 1

-S1 -H1 -H60


+S2 -A30
-X1 4 2 /8-4.4
MA3/5
MS..
-X8 -X1
4 1-14 1-14
-X2 1-4
2
-X12 -H33.1
1
-X5 1-4 -X3
3 -S32B
-X1 3 1 -H1
-S1 -H1 -X4
-X1 4 2

4
2

-A30 -A30 -H60


+S1 +S1
/8-4.4 -X11 .2
1 MA3/5
.6 MS.. MS..
3 -S32F -X8 -X1
-X1 3 1 1-14 1-14
-X2 1-4
-S1 -H1 -H33.1
-X5 1-4 -X3
-X1 4 2
-H1
4
-X4
2

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 13
Well 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Zone

+Sx -A30
/13.2
MS..
-X7
1

-S27 13

14

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke P a g e 13-2
Well 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

v<0.3m/s or <0.5m/s and doorzone doorzone Acknowledgement safety circuit doorzone Re-levelled middle

-A75
/11-2.2 +24VS
/16.1 MH3

-K901 -V813 -K902 -V814 -K903 -R888


100
-V817 -K27 -V540
+AKKU
-C824 +
-R886 -R887 47 -K903
CPU 2,2k 2,2k CPU
out in
-K902 -K901 -K902 -K902 -R567 -R568
-H21 -H20 1,5k 1,5k -H14
+24VS
-K903 -K901 -K903 -K902 -K901
-R29
-K901 -K903 1,8k
-R891
3,3k

-R889 -R890 -R717 -V539 -V9


-K27 4,7k 4,7k 3,3k

-X26 1 -X26 2 -X19 6 -X19 7 0V -X26 3 -X26 4 -X16 3

-X80.3 1

+V-X14 1

+F

-A18 -X4 1
/12.5
/17.1 MC3
0V -H27
-X9 1 -X9 2

-S27 13

14

a DATE 25.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + B
c CHECK Sieck Aufzugswerke Page 14
Safety circuit 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Load weighing

+F +F
24V+F/10.5 24V+F
VM1
/1-1.7
-B68

BN BK BU

-X2 8 -X2 8 -X9 +24

-M46 R -M46.1 R -A68 -X2 2 -X1 1 2 3


/8-5.4
+24V ANE
A+24V AGND
M M
LMS1
1 ~ 1 ~

M PE M PE 0V
-X2 3

-X2 9 PE -X2 9 PE -X9 0V Overload

Occupied

Unauthorized use by empty car


VM2
/1-1.7
0V+F/10.5 0V+F/17.1

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 15
Additionals 349303065 K
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Collective fault message

+B

-A75
/14.1
/17.1 MH3
-H12

+24V

-K73
-K73

-X20 1 3 2

-X80.1 4 5 6

-X2 20 21 22

250V / 6A AC
24V / 5A DC

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 16
Additionals 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Safety gear Motor impulse Service / emerg. call Door Remote tripping for governor Remote reset of el pre-switching off
Emergency light

24V+B/8.2 24V+B

-A75 -X22 3 -X34 1


/16.1
+24V +24V
/21.3 MH3
+5V
-K25 -K29
-H22
-S401
-H16 -H17 -H2 -K25 -K29
0V
-S25 -S29
-H11
+12V
-X2 1 2 0V -X22 2 0V -X34 2

-X80.1 2 -X80.3 10
-S80 1
+F
2
+V-X9 5 +V-X9 1
-A18
/14.7
MC3 +S
-X25 1
-E20
-X22 4

-Y25 1 -R25 -Y29 1


-X9 14 U

2 2

13 21
-S140B -X25 2

14 22
/4.4

-X9 0V +V-X9 0V
0V+F/15.6 0V+F

0V 0V/22.2

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + B
c CHECK Oetzel Aufzugswerke Page 17
Additionals 349303065 N
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Case of fire

+B

L13+B/4.2 L13+B 11
-K67
.3 12
-G67
L

-F1 -A75 -X21 1 2


/17.1
2,5A
/22.4 MH3 +24V
24V DC / 0,6A
N PE - +

provided by customer
-X80.3 -X9 3 +E

12

-X80.1 -X9 4
1

-X80 -X9 6
4
11 -K67.1
.3 -X80 -X9 7
14 12 5
-X80 -X9 8
-K67 A1 -K67.1 A1 6

A2 A2
-X80.3 -X9 2

N2+B/7.2 N2+B 11

PE/2-2.8 PE

14 11 14 11
.4 12 .4 12

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 21
Additionals 349303065 K
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Monitoring

+B
-A75
+12V/11.3 +12V /21.3
MH3

-X10 2 3 5

GND
RxD
TxD
Principle

1st lift 2nd lift Last lift


RS232
-A76 -X8 3 -X6 2 3 5
/8-1.2 top top +E
MM Interface +V1 (+TS) +V1 (+TS) +V1 (+TS)
-X5 -X1 1
2 2 -A76 -A76 -A76
-J11 1 2 3 -J21 1 2 3 3 3 J21 J21 J21
-R11 -R21 4
120 120 1 2 3 1 2 3 1 2 3
-X8 4 -X1 1 2 3 -X1 4 5 6
top bottom top

PC

Monitoring CAN bus

H H
L L
0V 0V

from previous lift to next lift


from PC to 1st lift
0V/17.8 0V

a DATE 10.04.03 = 1
b
ThyssenKrupp Traction drive lift 3AC J60 Tianjin TEDA International P1
Resp. ASKON + V
c CHECK Oetzel Aufzugswerke Page 22
Monitoring 349303065 K
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 29 Pg.
1 2 3 4 5 6 7 8
65960001957 39x1/0,5
Gauge

HYSLY-JZ 7x1
Connections

Cable Type

Main distributor

Main distributor
Destination 1 Destination 2

Function
Cross- No. bridge
refer- to
connec-

W80.1
ence

W80
+Loc-DevID :Connec. tion +Loc-DevID :Connec.
ÖTer
Connector: =1+B-X80
-K67.1 11 21.4 4 +V -X9 6 1
-K67.1 12 21.4 5 +V -X9 7 2
-K67.1 14 21.4 6 +V -X9 8 3

Connector: =1+B-X80.1
-K67.1 A1 21.4 1 +V -X9 4 25
-A75-X22 2 17.6 2 +V -X9 5 26
-X9 0V 8.2 3 +V -X9 0V 27
-A75-X20 1 16.2 4 +V -X2 20 31
-A75-X20 3 16.2 5 +V -X2 21 32
-A75-X20 2 16.3 6 +V -X2 22 33
-X2 PE 1.3 9 +V -X2 PE GNYE
-A75-X24 1 7.2 10 +V -X2 N2 28
-X00 1-1.2 11 +V -X2 5 29
-K86 22 1.8 12 +V -X2 10 30

Connector: =1+B-X80.2
-A75-X24 2 4.4 1 +V -X12 1 8
-S01 4 4.5 2 +V -X12 2 9
-S01 1 4.7 3 +V -X12 3 10
-S01 2 4.8 4 +V -X12 4 11
-A75-X24 4 7.3 5 +V -X12 5 12
-K00 14 1-1.7 6 +V -X12 6 13
-A75-X11 1 1-1.3 7 +V -X12 7 14
-A75-X24 6 7.4 8 +V -X1 N3 15
-X2 L13 4.2 9 +V -X1 104 16
-S01 3 4.2 10 +V -X1 105 17
-A75-X25 2 5.1 11 +V -X1 137 18
-A75-X24 5 7.4 12 +V -X1 138 19

assigned wires of cable 3 38


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+B-X80
c CHECK Sieck Aufzugswerke Page 1
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001957 39x1/0,5

65960001959 39x1/0,5
Gauge

NYM-J 4x1,5

NYM-O 2x1,5

NYM-O 3x1,5
H05VV-F 2X1
Connections

Manually op. brake

Travelling cable 1
Cable Type

Main distributor

Control panel
Destination 1 Destination 2

Function
Cross- No. bridge

Governor
refer- to
connec-

W102.2

W07.2
Group
W81.1
ence

W80
+Loc-DevID :Connec. +Loc-DevID :Connec.

W05

W11
tion
ÖTer
Connector: =1+B-X80.3
-A75-X16 3 14.7 1 +V -X14 1 1
-A75-X1 3 11.2 2 +V -X14 2 2
-A75-X1 4 11.3 3 +V -X14 3 3
-A75-X1 5 11.3 4 +V -X14 4 4
-A75-X1 2 11.4 5 +V -X14 5 5
-A75-X1 1 11.4 6 +V -X14 6 6
-A75-X23 1 8.4 7 +V -X13.1 15 7
-A75-X23 2 8.4 8 +V -X13.1 14 20
-X9 +24 8.2 9 +V -X9 +24 21
-A75-X34 2 17.8 10 +V -X9 1 22
-K67.1 A2 21.4 11 +V -X9 2 23
-G67-X + 21.4 12 +V -X9 3 24

Connector: =1+B-X80.4
-K31 A1 1-2.2 1 +V -X2 1 BK
-K31 A2 1-2.2 2 +V -X2 2 BN
-K31 2 1-2.3 3 +V -X2 3 BU
-S86 14 2-2.4 5 +V -X2 30 BK
-K86 A1 2-2.4 6 +V -X2 31 BU
-F05 1 8.4 9 +V -X8 +24G BN
-F05 2 8.4 10 +V -X8 +24S BU

Connector: =1+B-X80.5
-K86 2 2-2.7 1 +U -X512 6 BU
-K86 6 2-2.7 2 +U -X512 8 BK
-K86 4 2-2.8 3 +U -X512 7 BN

Connector: =1+F-A18-X3
8.6 1 +V -X13 7 YE
8.6 2 +V -X13 8 GY
8.6 3 +V -X13 12 RD
8.6 4 +V -X13 13 BU
9.3 5 +V -X13 5 12
9.4 6 +V -X13 6 13
9.3 7 +V -X13 4 11
9.3 8 +V -X13 3 10
8.6 9 +V -X13 2 9
8.6 10 +V -X13 1 8
assigned wires of cable 38 3 2 2 3 28
a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+B-X80.3
c CHECK Sieck Aufzugswerke Page 2
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001959 39x1/0,5

Vorinst 2x0,75

Vorinst 3x0,75
FBL 4xA26
Gauge

YR 10x0,8

YR 3x0,8
Connections

Switch.off land.calls
Travelling cable 1
Cable Type

Floor selection
Car command
Destination 1 Destination 2

Function
Cross- No. bridge

Inspection
refer- to
connec-

W44.2
Zone
W910
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W24

W27

W43
W11
tion
ÖTer
Connector: =1+F-A18-X4
14.7 1 +V -X14 1 1
11.2 2 +V -X14 2 2
11.3 3 +V -X14 3 3
11.3 4 +V -X14 4 4
11.4 5 +V -X14 5 5
11.4 6 +V -X14 6 6

Connector: =1+F-A18-X5
12.3 1 -S24-X1 1 1
12.3 2 -S24-X1 2 2
12.3 3 -S24-X1 3 3
12.3 4 -S24-X1 4 4

Connector: =1+F-A18-X9
14.7 1 -S27 13 BU
14.7 2 -S27 14 BN

Connector: =1+F-A18-X10
12.1 1 -X910 1 WH
12.1 2 -X910 2 BN
12.1 3 -X910 3 GN
12.1 4 -X910 4 YE
12.1 5 -X910 5 GY
12.1 6 -X910 6 BK
12.1 9 -X910 0V BU
12.1 10 -X910 +24 RD

Connector: =1+F-A18-X14
8.7 1 -B43 RD RD
8.7 2 -B43 BN BN
8.7 3 -B43 BK BK

Connector: =1+F-A18-X15
9.1 2 -X9 25 WH
9.2 3 -X9 22 RD
9.1 4 -X9 21 BK

assigned wires of cable 28 4 2 8 3 3


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-A18-X4
c CHECK Sieck Aufzugswerke Page 3
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
Vorinst 3x0,75

FBL 4xA26

FBL 4xA26

W40.3 6596058890 3xA24

FBL 4xA26

FBL 4xA26
Gauge

YR 3x0,8

H05V-K 15x1X1
Connections

Cable Type

Car board/CPU

Car board/CPU
Door command

Door command

Case of fire
Destination 1 Destination 2

Function

Re-levelling
Cross- No. bridge

Overload
Car bus
refer- to
connec-

W40.2

W18.2

W48.1
W27.1

W67.1
W52A

W52Z
ence
+Loc-DevID :Connec. tion +Loc-DevID :Connec.
ÖTer
Connector: =1+F-A18-X16
8.8 1 -B27 RD RD
8.8 2 -B27 BN BN
8.8 3 -B27 BK BK

Connector: =1+F-A18-X19
12.3 1 -S52A-X1 1 1
12.3 2 -S52A-X1 2 2
12.3 3 -S52A-X1 3 3
12.3 4 -S52A-X1 4 4

Connector: =1+F-A18-X20
12.3 1 -S52Z-X1 1 1
12.3 2 -S52Z-X1 2 2
12.3 3 -S52Z-X1 3 3
12.3 4 -S52Z-X1 4 4

Connector: =1+F-A18-X21
10.4 1 -X50 8 WH
10.5 2 -X50 7 RD

Connector: =1+F-A18-X22
10.4 1 -X9 0V BU-a
17.2 4 -X9 14 BU-b

Connector: =1+F-A18-X30
8-5.3 1 -A40-X65 1 RD
8-5.3 2 -A40-X65 2 BU
8-5.3 3 -X40 6 YE

Connector: =1+F-A18-X31
12.5 1 -H48-X1 1 1
12.5 2 -H48-X1 2 2
12.5 5 -H67-X1 1 1
12.5 6 -H67-X1 2 2

assigned wires of cable 3 4 4 2 2 3 2 2


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-A18-X16
c CHECK Sieck Aufzugswerke Page 4
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
FBL 4xA26

FBL 4xA26

FBL 4xA26

FBL 4xA26

FBL 4xA26
Gauge

H05V-K 15x1X1
Connections

Emergency call/light
Cable Type

Emergency call

Emergency call

Car board/CPU
Destination 1 Destination 2

Function

Call station

Call station
Cross- No. bridge
refer- to
connec-

W20.2

W20.1

W18.1
W20F

W20B
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W20
tion
ÖTer
Connector: =1+F-A18-X90
11.7 1 -X9 1 1
11.7 2 -X9 2 2
11.7 3 -X9 3 3
11.7 4 -X9 4 4

Connector: =1+F-A18-X92
11.7 1 -S20F-X1 1 1
11.7 2 -S20F-X1 2 2
11.7 3 -S20F-X1 3 3
11.7 4 -S20F-X1 4 4

Connector: =1+F-A18-X93
8-5.2 1 -A40-X1 1
8-5.2 2 -A40-X1 2

Connector: =1+F-A18-X94
11.7 1 -S20B-X1 1 1
11.7 2 -S20B-X1 2 2
11.7 3 -S20B-X1 3 3
11.7 4 -S20B-X1 4 4

Connector: =1+F-A18-X100
11.4 1 -B20.2-X1 2 2
11.4 2 -B20.2-X1 3 3

Connector: =1+F-A18-X101
11.2 1 -B20.1-X1 2 2
11.3 2 -B20.1-X1 3 3

Connector: =1+F-A18-X200
1-1.7 2 -X2 5 RD-b
1-1.7 3 -X12 6 RD-a

Connector: =1+F-A40-X1
-A18-X93 1 8-5.2 1
-A18-X93 2 8-5.2 2

assigned wires of cable 4 4 4 2 2 2


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-A18-X90
c CHECK Sieck Aufzugswerke Page 5
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
FBL 14xA28
Gauge

Vorinst 3x0,5

NYM-O 1x1,5
Connections

Position indicator
Cable Type

Load weighing
Destination 1 Destination 2

Function
Cross- No. bridge

Car door
refer- to
connec-

W150.2
W68.3
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W60
tion
ÖTer
Connector: =1+F-A40-X35
12.7 1-14 -H60-X1 1-14 1

Connector: =1+F-A40-X65
8-5.3 1 -X40 4
8-5.3 2 -X40 5
8-5.3 3
8-5.3 4

Terminal strip: =1+F-A68-X1


15.7 1 -B68 BN BN
15.7 2 -B68 BK BK
15.7 3 -B68 BU BU

Device: =1+F-S150
-S150 2 5.3 2 -S150.1 1 BK

assigned wires of cable 1 3 1


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-A40-X35
c CHECK Sieck Aufzugswerke Page 6
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
Gauge

H05V-K 15x1X1

H05V-K 15x1X1
H05VV-F 3G1

H05VV-F 5G1

H05VV-F 5G1
Vorinst 10x1
Connections

Cable Type

Tilt-up support
Terminal-plug
Door hanger
Destination 1 Destination 2

Safety gear
Function
Cross- No. bridge

Inspection
Stop/Insp
refer- to
connec-

W140B
W50.2

W12.1

W128
W144
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W44
tion
ÖTer
Safety circuit
Terminal strip (N): =1+F-X1 230 V
5.3 PE -X50 PE GNYE
4.4 100 -S140B 21 BN
-X12 1 RD-a
4.4 102 -S100 21 3
-S44 2 RD-b
-S140B 22 BU
4.4 106 -S44 5 RD-c
-S100 22 4
4.5 107 -S44 1 RD-a
-X12 2 RD-b
4.5 108 -S128 13 BKbn
-S44 6 RD-f
4.5 109 -S128 21 BN
-S44 4 RD-d
5.3 110 -S44 11 RD-k
-X12 4 RD-d
5.3 111 -S44F 14 6
-X50 1 BU
-S44 12 RD-l
5.3 113 -X50 4 BN
-X12 5 RD-e
4.6 124 -S128 22 BU
-X12 3 RD-c
4.5 125 -S44B 13 5
-S128 14 BKbu

assigned wires of cable 3 4 5 9 7 4


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-X1
c CHECK Sieck Aufzugswerke Page 7
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001959 39x1/0,5

Gauge

15x1X1
1G1,5

3G1

3G1

3G1

3G1

2X1
Connections

H07V-K

H05V-K
H05VV-F

H05VV-F

H05VV-F

H05VV-F

H05VV-F
Travelling cable 1

Cable Type

Car board/CPU
Socket outlet
Destination 1 Destination 2

Function

Light (v)

Door drive
Cross- No. bridge

Ventilator

Ventilator

Ventilator
refer- to
connec-

W46.2
W41.3

W46.1

W18.1
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W46

W50
W41
W11

tion
ÖTer
Terminal strip: =1+F-X2 230 / 400 V

GNYE +V -X11 PE 1-1.6 PE -X41 GNYE


-E41 PE GNYE
15.2 PE -M46-X PE GNYE
15.3 PE -M46.1-X PE GNYE
3.2 PE -G50-X7 2 GNYE
1-1.7 5 -E41 1 BN
-A18-X200 2 RD-b
15.2 8 -M46-X R BN
15.3 8 -M46.1-X R BN
15.2 9 -X11 2 BU
-M46-X M BU
15.3 9 -M46.1-X M BU

28 assigned wires of cable 1 3 3 3 3 2 2


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-X2
c CHECK Sieck Aufzugswerke Page 8
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
FBL 4xA26

FBL 4xA26
Gauge

6596059890 2xA18
YR 3x0,8

YR 3x0,8

W50.4 6596068890 3x0,8

YR 3x0,8
H05V-K 15x1X1

H05V-K 15x1X1

H05VV-F 5G1

H05VV-F 2X1

Vorinst 10x1
Connections

Emergency call/light

Emergency call/light
Cable Type

Emergency light
Car board/CPU
Load weighing

Door control
Door hanger
Destination 1 Destination 2

Safety gear
Function
Cross- No. bridge

Inspection

Inspection
Stop/Insp
Car bus
refer- to
connec-

W140B
W50.5

W20.0

W20.5

W44.2
W68.1

W18.2
W44.1

W144
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W40

W20
tion
ÖTer
Terminal strip (N): =1+F-X9 24 V

10.4 +24 -X50 6 RD


15.6 +24 -A68-X2 2 RD
8-5.1 +24 -A18-X93 1 1
9.1 +24 -S44 7 BU-g
-G50-X2 1 RD
10.4 0V -A18-X22 1 BU-a
15.6 0V -A68-X2 3 BK
0V+F 17.2 0V -S140B 14 BKbu
8-5.1 0V -A18-X93 2 2
9.1 0V -G50-X2 2 BK
-S44 9 BU-i
11.6 1 -S20-X1 1 1
-E20 1 BN
-A18-X90 1 1
11.6 2 -S20-X1 2 2
-A18-X90 2 2
-E20 2 BU
11.6 3 -S20-X1 3 3
-A18-X90 3 3
11.6 4 -S20-X1 4 4
-A18-X90 4 4
17.2 14 -S140B 13 BKbn
-A18-X22 4 BU-b
9.1 20 -S44B 23 7
-S44 8 BU-h
9.1 21 -A18-X15 4 BK
-S44B 24 9
9.2 22 -A18-X15 3 RD
-S44F 24 8
9.1 25 -S44 10 BU-j
-A18-X15 2 WH
10.3 52 -S44 16 BU-e
-G50-X2 6 WH

assigned wires of cable 1 2 2 5 3 2 4 4 2 4 9 3


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-X9
c CHECK Sieck Aufzugswerke Page 9
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001959 39x1/0,5

W40.3 6596058890 3xA24


Gauge

H05V-K 15x1X1

H05V-K 15x1X1

W68.2 6596057894 3x0,6


H07V-K 1X1,5

H07V-K 1X1,5
H05VV-F 2X1

H05VV-F 3G1

H05VV-F 3G1
Vorinst 10x1
Travelling cable 1
Connections

Cable Type

Car board/CPU

Load weighing
Socket outlet

Socket outlet
Terminal-plug
Destination 1 Destination 2

Function

Light (v)

Door drive
Cross- No. bridge

Ventilator

Stop/Insp

Car bus
refer- to
connec-

W46.2

W41.2

W18.1
W12.1

W41.1
W144
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W50
W41
W11

tion
ÖTer
Connector: =1+F-X11
34 +V -X11 2 1-1.7 2 -X2 9 BU
-X41 BK
-E41 2 BU
33 +V -X11 3 1-1.2 3 -S100 11 1
32 +V -X11 5 3.1 5 -G50-X7 3 BN
29 +V -X11 6 3.1 6 -G50-X7 1 BU

Connector: =1+F-X12
16 +V -X12 1 4.4 1 -X1 100 RD-a
17 +V -X12 2 4.5 2 -X1 107 RD-b
18 +V -X12 3 4.6 3 -X1 124 RD-c
19 +V -X12 4 5.3 4 -X1 110 RD-d
20 +V -X12 5 5.3 5 -X1 113 RD-e
21 +V -X12 6 1-1.7 6 -X41 BK
-A18-X200 3 RD-a
22 +V -X12 7 1-1.2 7 -S100 12 2

Terminal strip: =1+F-X40


8-5.3 4 -A68-X4 4 4
-A40-X65 1
8-5.3 5 -A68-X4 3 3
-A40-X65 2
8-5.3 6 -A68-X4 1 2
-A18-X30 3 YE

28 assigned wires of cable 2 1 3 9 3 5 1 2 3 3


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-X11
c CHECK Sieck Aufzugswerke Page 10
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
3xA22

4xA22
Gauge

3x0,8

3x0,8
1x1,5

1x1,5

1x1,5

1x1,5
3G1
Connections

Vorinst

Vorinst
YR

YR
NYM-O

NYM-O

NYM-O

NYM-O
H05VV-F
Cable Type

Car board/CPU
Light screen

Light screen
Door hanger

Door hanger
Destination 1 Destination 2

Function
Cross- No. bridge

Car door

Car door

Car door

Car door
refer- to
connec-

W158.2
W150.3

W158.1
W150.1
W50.2

W50.5

W56.2

W40.2
W56.1
ence
+Loc-DevID :Connec. tion +Loc-DevID :Connec.
ÖTer
Terminal strip: =1+F-X50
5.3 PE -X1 PE GNYE
5.3 1 -S150 1 BK
-X1 111 BU
5.3 2 -S150.1 2 BK
5.3 3 -S158 1 BK
5.3 4 -X1 113 BN
-S158 2 BK
10.4 6 -X9 +24 RD
-B56 YE
-B56 RD
10.5 7 -A18-X21 2 RD
-B56 OG
-B56 OG
10.4 8 -A18-X21 1 WH
-B56 BU
10.4 9 -B56 WH
-B56 WH

assigned wires of cable 3 1 1 1 1 1 3 4 2


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-X50
c CHECK Sieck Aufzugswerke Page 11
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
FBL 14xA28
FBL 4xA26

FBL 4xA26

FBL 4xA26
Gauge

YR 10x0,8

NYM-O 2x1,5

NYM-O 2x1,5

NYM-O 2x1,5

NYM-O 2x1,5

NYM-O 2x1,5

NYM-O 1x1,5
Connections

Final limit switch (v)


Governor rope (v)

Position indicator
Cable Type

Distributor well

Distributor well
Car command

Car command

Car command

Car command

Landing door
Destination 1 Destination 2

Function
Cross- No. bridge

Stop (v)
refer- to
connec-

W139.2
W34B.1
W42.2

W42.3

W101B
W42.1

W60.1
W34B
W910

W100

W132
ence
+Loc-DevID :Connec. tion +Loc-DevID :Connec.
ÖTer
Terminal strip: =1+F-X910
12.3 +24 -S42.1-X1 1 1
-S42.2-X1 1 1
-A18-X10 10 RD
-S42.3-X1 1 1
12.3 0V -S42.1-X1 4 4
-S42.2-X1 4 4
-A18-X10 9 BU
-S42.3-X1 4 4
12.2 1 -A18-X10 1 WH
-S42.1-X1 3 3
12.2 2 -A18-X10 2 BN
-S42.1-X1 2 2
12.2 3 -A18-X10 3 GN
-S42.2-X1 3 3
12.2 4 -A18-X10 4 YE
-S42.2-X1 2 2
12.2 5 -A18-X10 5 GY
-S42.3-X1 3 3
12.2 6 -A18-X10 6 BK
-S42.3-X1 2 2

Distributor: =1+S-X34B
4.2 1 -S100 21 BK
+V -X1 104 BK
4.2 2 -S132 21 BK
-S100 22 BU
4.2 4 +V -X1 105 BU
-S132 22 BU
4.2 6 -S101B 21 BK
+V -X1 105 BK
4.2 7 +V -X1 115 BU
-S101B 22 BU

Connector: =1+S1-A30-X8
13.7 1-14 -H60-X1 1-14 1

Device: =1+S1-S139
5.5 12 -S138 13 BK
assigned wires of cable 4 4 8 4 2 2 2 2 2 1 1
a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+F-X910
c CHECK Sieck Aufzugswerke Page 12
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
Vorinst 2x0,75
FBL 14xA28

FBL 4xA26

FBL 4xA26
Gauge

NYM-J 1x2,5
NHXMH-J 4x1,5

NYM-O 1x1,5

NYM-O 1x1,5
Connections

Position indicator
Cable Type

Landing door

Landing door

Landing door

Landing door

Landing call

Landing call
Destination 1 Destination 2

Function
Cross- No. bridge
refer- to
connec-

W137.x

W139.4

W139.3

W60.1n
W139.1

W32F
W27x

W32B
Zone
ence
+Loc-DevID :Connec. tion +Loc-DevID :Connec.
ÖTer
Connector: =1+S1-X1
5.5 PE +Sn -X1 PE GNYE
5.5 PE
5.5 PE -S139-X PE GNYE
5.4 1 11 +Sn -X1 5 BN
-A30-X 2 7.5 2 6 +S2 -X1 6 BU
-A30-X 1 5.5 3 10 +Sn -X1 7 BK
5.4 5 12,7
7.5 6 2
5.5 7 5
5.5 9 -S138 14 BK
5.5 10 3 -S139 11 BK
5.4 11 1
5.4 12 5

Connector: =1+S2-A30-X8
13.7 1-14 -H60-X1 1-14 1

Connector: =1+Sx-A30-X7
13-2.7 1 -S27 13 BU
13-2.7 2 -S27 14 BN

Connector: =1+Sx-A30-X11
13.3 1 -S32F-X1 1 1
13.3 2 -S32F-X1 2 2
13.3 3 -S32F-X1 3 3
13.3 4 -S32F-X1 4 4

Connector: =1+Sx-A30-X12
13.3 1 -S32B-X1 1 1
13.3 2 -S32B-X1 2 2
13.3 3 -S32B-X1 3 3
13.3 4 -S32B-X1 4 4

assigned wires of cable 4 1 1 1 1 2 4 4


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+S1-X1
c CHECK Sieck Aufzugswerke Page 13
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
7x0,75
Gauge

3x2,5

3x1,5

3x1,5

2x1,5

5x1,5
4x4

4x4
Connections

Vorinst
Úlflex-100

Úlfl-100SY

Manually op. brake

vinst.FRNC

vinst.FRNC
NYM-J

NYM-O

HYSLCY-O
Control voltage +U
Cable Type

Braking resistor
Destination 1 Destination 2

Function

Main switch
Cross- No. bridge

Lift motor

Lift motor
refer- to
connec-

W07.3

W00.3

W07.2

Brake

Brake
W00.1

W01.3

W07.1
ence
+Loc-DevID :Connec. +Loc-DevID :Connec.

W07
W01
tion
ÖTer
Terminal strip: =1+U-X1
-Q1 1 2.2 L1 +B -X0 L11 BK
-Q1 3 2.2 L2 +B -X0 L21 BN
-Q1 5 2.2 L3 +B -X0 L31 BU
2.2 PE +B -X0 PE GNYE
-U03-X1 27 2.5 PE +M -X01 PE GNYE
-U03-X1 19 2.6 PE +S -R03 PE GNYE
-U03-X1 24 2.4 U +M -X01 U BK
-U03-X1 25 2.5 V +M -X01 V BN
-U03-X1 26 2.5 W +M -X01 W BU
-K07 R3 2.6 1 +S -R03 BN
-U03-X1 21 2.6 3 +S -R03 BU

Connector: =1+U-X512
2-1.2 1 +V -X2 PE GNYE
-X513 2 2-1.2 2 +V -X2 N2 BU
-F2 1 2-1.2 3 +V -X2 10 BK
-X515 4 2-1.7 6 +B -X80.5 1 BU
-X515 2 2-1.7 7 +B -X80.5 3 BN
-X522 2 2-1.7 8 +B -X80.5 2 BK

Connector: =1+U-X514
2.4 1 +M -X01 10 BN
2.4 2 +M -X01 11 BU
2-1.4 3 +M -Y07-X07 5 1
2-1.4 4 +M -Y07-X07 6 2
2-1.4 7 +M -Y07-X07 7 3
2-1.5 8 +M -Y07-X07 8 4
2-1.5 9 +M -Y07-X07 9 5
2-1.5 10 +M -Y07-X07 10 6

Connector: =1+U-X515
-X522 2 2-1.6 1 +M -Y07-X07 1 1
-X512 7 2-1.6 2 +M -Y07-X07 2 2
2-1.7 3 +M -Y07-X07 3 3
-X522 1 2-1.7 4 +M -Y07-X07 4 4
-X512 6

assigned wires of cable 4 4 3 3 3 2 6 4


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+U-X1
c CHECK Sieck Aufzugswerke Page 14
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001957 39x1/0,5
vorinst 16xA28
Gauge

NYM-J 3x2,5
NYM-O 2x1,5

NHXMH-J 4x1,5

NYM-O 2x1,5

NYM-O 2x1,5

NYM-O 2x1,5

NYM-O 2x1,5
NYM-J 5x4
Connections

Final limit switch


Cable Type

Main distributor

Distributor well

Distributor well
Safety circuit

Landing door

Governor (v)
Actual value
Destination 1 Destination 2

Function

Main switch
Cross- No. bridge
refer- to
connec-

W34B.1
W137.n

W101F
W07.6

W00.2
Light

W34B

W102
ence

W80
+Loc-DevID :Connec. +Loc-DevID :Connec.

W03

W00
tion
ÖTer
Connector: =1+U-X516
-X517 1 6.2 1 +V -X1 138 BK
-V06 ~ 6.7 3 N3 BU

Connector: =1+U-X917
2.3 1-15 +M -B03 1-15 GNBK

Connections: =1+V-X0 230 / 400 V

1.2 L1 +B -X0 L1 16 BKbn


1.2 L2 +B -X0 L2 16 BN
1.2 L3 +B -X0 L3 16 BKbu
1.2 N +B -X0 N 16 BU
-X2 N 1.2 N 16
1.2 PE 16
1.2 PE +B -X0 PE 16 GNYE
1.2 PE +B -X0 PE 4 GNYE
1.2 1L1 +B -X0 1L1 4 BK
-X11 2 1.2 1N +B -X0 1N 4 BU
Safety circuit
Connections: =1+V-X1 230 V
7.4 N3 N3+V 2,5
+B -X80.2 8 15
N3+V 7.7 N3 +S2 -X1 2 2,5 BU
PE+V 5.5 PE +Sn -X1 PE 2,5 GNYE
-X2 L13 4.2 104 +S -X34B 1 2,5 BK
+B -X80.2 9 16
4.2 105 +S -X34B 6 2,5 BK
+S -X34B 4 BU
+B -X80.2 10 17
4.3 115 +S -S101F 21 2,5 BK
+S -X34B 7 BU
4.3 116 +S -S102 11 2,5 BK
+S -S101F 22 BU
-X12 1 4.3 120 +S -S102 12 2,5 BU
-X12 5 5.3 133 +Sn -X1 1 2,5 BN
5.7 137 +Sn -X1 3 2,5 BK
+B -X80.2 11 18
5.7 138 +U -X516 1 2,5 BK
+B -X80.2 12 19
assigned wires of cable 2 1 5 3 38 4 2 2 2 2
a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+U-X516
c CHECK Sieck Aufzugswerke Page 15
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001957 39x1/0,5
Gauge

6696022880 5x0,5
H05VV-F 3G1,5
NYM-J 3x1,5

NYM-J 4x1,5

NYM-J 4x1,5

NYM-O 2x1,5

NYM-O 2x1,5

NYM-O 2x1,5

H05VV-F 2X1
Connections

Control voltage +U
Cable Type

Main distributor

Control panel

Governor (v)
Destination 1 Destination 2

Function
Cross- No. bridge

Well light

Well light

Well bus
Governor
refer- to
connec-

W102.2
W102.1
W00.3

Group
W81.1
W31.1

W00F
ence

Stop
W80
+Loc-DevID :Connec. +Loc-DevID :Connec.

W05

W30
W31
tion
ÖTer
Connections: =1+V-X2 230 / 400 V

-X1 104 4.1 L13 2,5


L13+V
-X11 6 2-1.2 N 2,5
-X0 N
2-1.2 N2 N2 2,5
+U -X512 2 BU
N2+V 7.2 N2 +B -X80.1 10 2,5 28
N2+V
-X11 PE 1-2.2 PE +S -E31 PE 2,5 GNYE
+S -X31 GNYE
1.2 PE +B -X80.1 9 2,5 GNYE
2-1.2 PE +U -X512 1 2,5 GNYE
1-2.2 1 +S -X31 2,5 BK
+B -X80.4 1 BK
-X11 2 1-2.2 1N +S -E31 N 2,5 BU
+S -X31|S31 14 BU
1-2.2 2 +S -S31 13 2,5 BN
+B -X80.4 2 BN
1-2.3 3 +S -E31 L 2,5 BN
+B -X80.4 3 BU
1-1.2 5 +S -S00F 11 2,5 BK
+B -X80.1 11 29
-X11 5 2-1.2 10 +U -X512 3 2,5 BK
+B -X80.1 12 30
16.2 20 +B -X80.1 4 2,5 31
16.2 21 +B -X80.1 5 2,5 32
16.3 22 +B -X80.1 6 2,5 33
2-2.4 30 +S -S102.1 21 2,5 BK
+B -X80.4 5 BK
2-2.4 31 +B -X80.4 6 2,5 BU
+S -S102.1 22 BU

Terminal strip: =1+V-X8 24 V

+24G 8.4 +24G +B -X80.4 9 BN


+24S 8-4.1 +24S -A16-X2 5 WH
8.4 +24S +B -X80.4 10 BU
0VG 8-4.1 0V -A16-X2 6 GY
8.4 0V -X9 0V
assigned wires of cable 3 38 3 4 3 2 2 2 2 5
a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+V-X2
c CHECK Sieck Aufzugswerke Page 16
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001959 39x1/0,5

65960001957 39x1/0,5

65960001959 39x1/0,5
H05VV-F 2X0,75

H05VV-F 2X0,75
Gauge

NYM-O 2x1,5
HYSLY-JZ 7x1
Connections

Remote release (v)


Travelling cable 1

Travelling cable 1
Remote reset (v)
Cable Type

Main distributor

Main distributor
Destination 1 Destination 2

Function
Cross- No. bridge
refer- to
connec-

W80.1
W29.1

W00F
ence

Stop
W80
+Loc-DevID :Connec. +Loc-DevID :Connec.

W25
W11

W11
tion
ÖTer
Connections: =1+V-X9 24 V

-X13 1 8.2 +24 +B -X80.3 9 2,5 21


0V 17.6 0V +S -Y29 2 2,5 BU
+S -X25 2 BU
-X8 0V 8.2 0V +B -X80.1 3 2,5 27
-X1 PE 8.2 PE 2,5
17.8 1 +S -Y29 1 2,5 BN
+B -X80.3 10 22
21.5 2 +B -X80.3 11 2,5 23
21.5 3 +B -X80.3 12 2,5 24
21.5 4 +B -X80.1 1 2,5 25
17.6 5 +S -X25 1 2,5 BN
+B -X80.1 2 26
21.5 6 +B -X80 4 2,5 1
21.5 7 +B -X80 5 2,5 2
21.5 8 +B -X80 6 2,5 3

Connections: =1+V-X11
+B -X00 1-1.6 PE +F -X2 PE 2,5 GNYE
-X0 1N 1-1.7 2 +F -X11 2 2,5 34
1-1.2 3 +F -X11 3 2,5 33
+S -S00F 12 BU
-X2 10 3.1 5 +F -X11 5 2,5 32
-X2 N 3.1 6 +F -X11 6 2,5 29

Connections: =1+V-X12
16 +F -X12 1 4.4 1 -X1 120 2,5
+B -X80.2 1 8
17 +F -X12 2 4.5 2 +B -X80.2 2 2,5 9
18 +F -X12 3 4.6 3 +B -X80.2 3 2,5 10
19 +F -X12 4 5.3 4 +B -X80.2 4 2,5 11
20 +F -X12 5 5.3 5 +B -X80.2 5 2,5 12
-X1 133
21 +F -X12 6 1-1.7 6 +B -X80.2 6 2,5 13
22 +F -X12 7 1-1.2 7 +B -X80.2 7 2,5 14

28 assigned wires of cable 38 2 2 3 28 2


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+V-X9
c CHECK Sieck Aufzugswerke Page 17
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001959 39x1/0,5

65960001957 39x1/0,5
W03.5 65960001958 12x0,14

W13.6 65960002706 2xA24


Gauge

6696022880 5x0,5
Travelling cable 1
Connections

Cable Type

Main distributor
Destination 1 Destination 2

Function
Cross- No. bridge

Local bus
Well bus
refer- to

Control
connec-
ence

W80
+Loc-DevID :Connec. +Loc-DevID :Connec.

W30
W11

tion
ÖTer
Connections: =1+V-X13
8 +F -A18-X3 10 8.6 1 -X9 +24 2,5
9 +F -A18-X3 9 8.6 2 +U -X906 7 2,5 WHGN
-X8 0V
10 +F -A18-X3 8 9.3 3 +U -X906 14 2,5 PK
11 +F -A18-X3 7 9.3 4 +U -X906 6 2,5 GY
12 +F -A18-X3 5 9.3 5 +U -X906 5 2,5 GN
13 +F -A18-X3 6 9.4 6 +U -X906 13 2,5 BN
YE +F -A18-X3 1 8.5 7 -X13.4 7 2,5
GY +F -A18-X3 2 8.5 8 -X13.4 8 2,5
RD +F -A18-X3 3 8.5 12 2,5
BU +F -A18-X3 4 8.5 13 2,5

Connector: =1+V-X13.1
8.4 14 +B -X80.3 8 20
8.4 15 +B -X80.3 7 7

Connector: =1+V-X13.2
8-4.3 12 -A16-X2 4 RD
8-4.3 13 -A16-X2 3 BU
8-4.3 14 -A16-X2 1 YE

Connector: =1+V-X13.3
-A16-X3 1 8.4 1 +B -X13 3 RD
-A16-X3 2 8.4 2 +B -X13 4 BU

Connector: =1+V-X13.4
-X13 7 8.4 7 +B -X13 1 YE
-X13 8 8.4 8 +B -X13 2 GY

Connector: =1+V-X13.5
-A76-X2 1 8-1.2 1 +U -X906 15 RD
-A76-X2 2 8-1.1 2 +U -X906 8 BU

28 assigned wires of cable 7 38 5 2


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+V-X13
c CHECK Sieck Aufzugswerke Page 18
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.
65960001959 39x1/0,5

65960001957 39x1/0,5
Gauge
Travelling cable 1
Connections

Cable Type

Main distributor
Destination 1 Destination 2

Function
Cross- No. bridge
refer- to
connec-
ence

W80
+Loc-DevID :Connec. +Loc-DevID :Connec.
W11

tion
ÖTer
Connections: =1+V-X14
1 +F -A18-X4 1 14.7 1 +B -X80.3 1 2,5 1
2 +F -A18-X4 2 11.2 2 -A76-X8 3 2,5
+B -X80.3 2 2
3 +F -A18-X4 3 11.3 3 +B -X80.3 3 2,5 3
4 +F -A18-X4 4 11.3 4 +B -X80.3 4 2,5 4
5 +F -A18-X4 5 11.4 5 +B -X80.3 5 2,5 5
6 +F -A18-X4 6 11.4 6 +B -X80.3 6 2,5 6

28 assigned wires of cable 38


a DATE 19.05.03 =K L E M M P L A N
b
ThyssenKrupp Terminals and Tianjin TEDA International P1
Resp. ASKON ab: 1+V-X14
c CHECK Sieck Aufzugswerke Page 19
connections 349303065
MODIFICATION DATE NAME NORM Orgin. Subst. Subst. 19 Pg.

You might also like