Lampiran A Perhitungan Neraca Massa: Hari 365 Tahun 1 X Tahun Ton 262.800
Lampiran A Perhitungan Neraca Massa: Hari 365 Tahun 1 X Tahun Ton 262.800
13.615,1936 m 3 /hari
=
0,625
= 21.784,3098 m3/hari
5
3
6
M-01
1
21
M-02
22
6
19+20
7
21
Dari data diketahui bahwa jumlah limbah yang di recycle 25%, maka
F22 = 0,75 F19+20
691.200,6852 kg/hari = 0,75 F19+20
F19+20 = 921.600,9136 kg/hari
F21 = F19+20- F22
F21 = 921.600,9136 kg/hari - 691.200,6852 kg/hari
21
F = 230.400,2284 kg/hari
F7 = F6+ F21
F7 = 721.867,8888 kg/hari + 230.400,2284 kg/hari
Alur 22
F22 = 691.200,6852 kg/hari
= 691.200,6852 L/hari
VS = 0,0125 kg/L
F22VS = 8.640,0086 kg/hari
F22 NaHCO3 = F5NaHCO3 = 1.800 kg/hari
F22 FeCl2 = F4FeCl2 = 64,584 kg/hari
F22 NiCl2 = F2NiCl2 = 0,864 kg/hari
F22 CoCl2 = F3CoCl2 = 2,4408 kg/hari
22 22 22 22
F Air = F – (F VS +F NaHCO3+ F22 FeCl2 + F22 NiCl2 +
F22CoCl2 )
= 691.200,6852 kg/hari – (8.640,0086 kg/hari + 1.800 kg/hari
+ 64,584 kg/hari + 0,864 kg/hari + 2,4408 kg/hari)
= 680.692,7878 kg/hari.
Alur 19+20
F19+20 = 921.600,9136 kg/hari
VS = 0,0325 kg/L
F19+20VS = 29.952,0297 kg/hari
F19+20 NaHCO3 = F22NaHCO3/ 0,75 = 2.400 kg/hari
19+20 22
F FeCl2 =F FeCl2 / 0,75 = 86,112 kg/hari
F19+20NiCl2 = F22NiCl2 / 0,75 = 1,152 kg/hari
Alur 21
F21 = 230.400,2284 kg/hari
F21VS = F19+20VS - F22VS
= 29.952,0297 kg/hari - 8.640,0086 kg/hari
= 21.312,0211 kg/hari
F21 NaHCO3 = F19+20 NaHCO3 / 4 = 600 kg/hari
21 19+20
F FeCl2 =F FeCl2/ 4 = 21,528 kg/hari
F21 NiCl2 = F19+20NiCl2 / 4 = 0,288 kg/hari
F21 CoCl2 = F19+20 CoCl / 4 = 0,8136 kg/hari
F21 Air = F21 – (F21VS + F21NaHCO3+ F21 FeCl2 + F21 NiCl2 +
F21CoCl2 )
= 230.400,2284 kg/hari – (21.312,0211 kg/hari + 600 kg/hari
+ 21,528 kg/hari + 0,288 kg/hari + 0,8136 kg/hari)
= 208.465,5777 kg/hari.
Alur 10+11
F10+11 = 21.784,3098 m3/hari
F10+11 CH4 = 8.099,46 kg/hari
F10+11 CO2 = 0,37 x F11
= 0,37 x 21.784,3098 m3/hari
= 8.060,1946 m3/hari : 26,896 m3/mol
= 299,68 mol/hari x 44 kg/mol
= 13.185,9222 kg/hari
10+11
F H2S = 0,0001 x F11
= 0,0001 x 21.784,3098 m3/hari
13
10+11
25
12
Alur 10+11
F10+11 = 21.359,5732 kg/hari
F10+11 CH4 = 8.099,46 kg/hari
F10+11 CO2 = 13.185,9222 kg/hari
F10+11 H2S = 2,7538 kg/hari
F10+11 H2O = 71,4372 kg/hari
Alur 25
Alur 13
F13 = 31.863,1248 kg/hari
F13CH4 = 8.436,4203 kg/hari
F13CO2 = 23.423,4423 kg/hari
13
F H2S = 3,2622 kg/hari
Alur 12
F12H2O = 79,8108 kg/hari
A.2.4 Desulfurisasi
Fungsi : untuk menyerap gas H2S yang terkandung dalam biogas, gas H2S
terserap sempurna CH4
CO2
15
CH4
H2S
CO2 13
Alur 15
A.2.5 Generator
16
udara
17
15
25
23 24 27
26
• Alur 25
COD terkonversi = (7.950-5.962,5) mg/L x 691.200,6852 kg/hari x 10-6
= 1.347,8413 kg/hari
CH4 yang diproduksi kgCH 4
= 0,25
COD yang terkonversi kgCOD
561,6006 m 3 /hari
=
0,625
= 898,5609 m 3 /hari
= 3,1877 kg/hari
Dari data diketahui bahwa jumlah limbah yang di recycle 25%, maka
F27 = 0,75 F24
689.924,8432 kg/hari = 0,75 F24
F24 = 919.899,7909 kg/hari
VS masuk = 0,0125 kg/L
VS keluar = 0,002625 kg/L
• Alur 24
F24 = 919.899,7909 kg/hari
VS = 0,002625 kg/L
• Alur 26
F26 = 0,25 x F24
= 0,25 x 919.899,7909
= 229.974,9477 kg/hari
= 229.974,9477 L/hari
F26vs = F24VS – F27VS
= 2.414,737 kg/hari – 928,745 kg/hari
= 1.485,992 kg/hari
26
F NaHCO3 = F24 NaHCO3 /4 = 600 kg/hari
F26 FeCl2 = F24FeCl2 /4 = 21,528 kg/hari
F26 NiCl2 = F24 NiCl2 /4 = 0,288 kg/hari
F26CoCl2 = F24 CoCl2 /4 = 0,8136 kg/hari
F26 Air = F26 – (F26VS + F26NaHCO3+ F26 FeCl2 + F26 NiCl2 + F26CoCl2 )
= 229.974,9477 kg/hari – (1.485,992 kg/hari + 600 kg/hari + 21,528
kg/hari + 0,288 kg/hari + 0,8136 kg/hari)
= 227.866,3261 kg/hari
• Alur 27
F27 = F24 x 0,75
= 919.899,7909 x 0,75
= 689.924,8432 kg/hari
= 689.924,8432 L/hari
27 29
Qi = Hi = ∫ n Cp dT
T1= 298
(Smith, 2001)
C pS
= ∑ N i ⋅ ∆ Ei
i =1
Dimana :
Cps = Kapasitas panas padatan pada 298,15 K ( J/mol.K )
n = Jumlah unsur atom yang berbeda dalam suatu senyawa
Ni = Jumlah unsur atom I dalam senyawa
ΔEi = Nilai dari distribusi atom I pada tabel LB.1
Menghitung Cp glukosa:
Cp = 6.ΔEC + 12.ΔEH + 6.ΔEO
= 6 (10,89) + 12 (7,56) + 6(13,42)
= 236,58 J/mol.K
T1 T1
T2
b c 3 d
∫ CpdT = a (T2 − T1 ) + (T2 − T1 ) + (T2 − T1 ) + (T2 − T1 ) ...................... (3)
2 2 3 4 4
T1
2 3 4
N3 FeCl2 ∫
298
CpdT + N4NiCl2 ∫
298,15
CpdT + N5 CoCl2 ∫
298
CpdT
dQ
= N .∆H pelaru tan + Qout − Qin
dt
= -200.284,9047 kJ + 87.684.460,3633 kJ– 14.563.376,6273 kJ
dQ/dt = 72.920.798,8313 kJ
6 7
21
Panas masuk alur 6 sama dengan panas keluar tangki Neutraliser yaitu
87.684.460,3633 kJ/hari.
Temperatur aliran reycle adalah 55 0C, sehingga dapat dihitung panas dari alur
Recycle
Untuk mengetahui suhu keluaran dari M-02, maka dilakukan trial error, sehingga
didapatkan suhu 550C.
– [ΔH ° C H O + ΔH °H2SO4]
f 6 12 6 (s) f
Touy Touy
CpdT + N19+20FeCl2 ∫
298,15
CpdT + N19+20NiCl2 ∫
298,15
CpdT + N19+20CoCl2
Touy
∫
298,15
CpdT
+ N10+11H2O ∫
298,15
CpdT
dQ
= Qout + r∆Hr − Qin
dT
= 1.960.333,236 kJ/hari + 112.727.613,579 kJ/hari + -1,8513 x 108 kJ/hari -
114.678.699,51 kJ/hari
= -185.146.424,909 kJ/hari
Digunakan air pendingin pada suhu T = 250C. Keluaran air pendingin = 400C
Qin air pendingin = m.Cp.(LMTD)
= m . 4,1818 . ((40-25)/ln(40/25))
= m. 4,1818 . (31,9147)
= 133,4609 m
dQ = dHr/dT
133,4609 m = 185.146.424,909 kJ/hari
m = 1.387.078,558 kg/hari
= 57.794,9399 kg/jam
– [ΔH ° C H O + ΔH °H2SO4]
f 6 12 6 (s) f
N24FeCl2 ∫
298,15
CpdT + N24NiCl2
298,15
∫ CpdT + N24CoCl2 ∫
298,15
CpdT
Tout
+ N25H2O ∫
298,15
CpdT
Digunakan air pendingin pada suhu T = 250C. Keluaran air pendingin = 400C
Qin air pendingin = m.Cp.(LMTD)
= m . 4,1818 . ((40-25)/ln(40/25))
= m. 4,1818 . (31,9147)
= 133,4609 m
dQ = dHr/dT
133,4609 m = 39.114.607,16 kJ/hari
m = 293.378,8635 kg/hari
= 12.224,1193 kg/jam
Kondisi operasi :
P = 1 atm
T = 30 0C
Waktu tinggal ( τ ) : 7 hari
Laju alir massa (F) = 720.000 kg/hari
Densitas (ρ) = 1.000 kg/m3
Viskositas (µ) = 0,824 cP
Faktor kelonggaran = 20 % (Perry, 1999)
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 720.000 kg/hari = 18,3717 lbm/sec
Densitas (ρ) = 1000 kg/m3 = 62,4296 lbm/ft3
Viskositas (µ) = 0,8 cP = 0,000538 lbm/ft.s
F 18,3717 lb m /sec
Laju alir volumetrik, Q = = = 0,2943 ft3/sec
ρ 62,4296 lb m / ft 3
4,6 x10 −5 m
ε/D = = 0,00044 (Geankoplis, 1993)
D
Pada NRe = 129.702,25 dan ε/D = 0,00044
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,0048
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2
A1 2α
3,3289 2
= 0,55 (1 − 0 ) = 0,0947 ft.lbf/lbm
2(1)(32,174 )
v2 3,3289 2
3 elbow 90° = hf = n.Kf. = 3(0,75) =0,3875 ft.lbf/lbm
2.g c 2(1)(32,174 )
v2 3,3289 2
1 check valve = hf = n.Kf. = 1(2,0) =0,3444 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,0048)
(40 )(
. 3,3289 )
2
= 0,3942 ft.lbf/lbm
(0,3355).2.(32,174)
2
A v2
1 Sharp edge exit = hex = 1 − 1
A2 2.α .g c
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
Maka :
32,174 ft / s 2
0+ (12 ft ) + 0 + 1,3931 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 13,3931 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
- 12,823 = -0,75 x Wp
Wp = 17,8575 ft.lbf/lbm
Daya pompa :
P = m x Wp
1 hp
= 18,3717 lbm/s × 17,8575 ft.lbf/lbm x
550 ft.lbf / s
= 0,5965 Hp
Maka dipilih pompa dengan daya motor = 1 Hp
Umpan
L
Keluaran
π DT2 H S (H S : DT = 3 : 2 )
1
Volume silinder =
4
3
= π DT3
8
DT ( diameter tangki ) = 8,8303 m = 347,6486 in
HS ( tinggi silinder ) = 3/2DT = 3/2 x 8,8303 = 13,2454 m
Dimana:
t = tebal shell (in)
P = tekanan desain (Psia)
R = jari-jari dalam tangki (in)
S = allowable stress (Psia)
E = joint efficiency
n = umur alat (tahun)
C = corrosion allowance (m/tahun)
Volum larutan = 721,7235 m3
Volum tangki = 866,0683 m3
721,7235
Tinggi larutan dalam tangki = x15,453 = 12,8775m
866,0683
Tekanan hidrostatik
P=ρxgxl
= 1000,2 kg/m3 x 9,8 m/det2 x 12,8775 m
= 126.224,7399 Pa = 18,32 psia
Faktor kelonggaran = 20 %
Maka, Pdesain = (1,2) (P operasi)
= 1,2 (14,696 + 18,32) = 39,6192 psia
- Direncanakan bahan konstruksi Carbon Steel SA-285 grade C
- Allowable working stress (S) : 13.700 psia (Peters et.al., 2004)
- Joint efficiency (E) : 0,8 (Peters et.al., 2004)
- Corossion allowance (C) : 0,125 in/tahun (Perry, 1999)
- Umur alat : 10 tahun
t=
(
39,6192 x 1 x 347,6486
2
) + (10 x0,125)
(13700 x0,8) − 0,6 x(39,6192 )
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 20.077,8287 kg/jam = 18,4193 lbm/s
Densitas (ρ) = 1000,203 kg/m3 = 62,44 lbm/ft3
Viskositas (µ) = 0,8 cP = 0,000538 lbm/ft.s
F 18,4193 lb m /sec
Laju alir volumetrik, Q = = = 0,295 ft3/s
ρ 62,44 lb m / ft 3
ρ× v× D
Bilangan Reynold : NRe =
µ
4,6 x10 −5
ε/D = = 0,00045 (Geankoplis, 1993)
D
Pada NRe = 130.097,9026 dan ε/D = 0,00045
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,0048
Friction loss :
A2 v 2
1 Sharp edge entrance= hc = 0,55 1 −
A1 2α
3,3884 2
= 0,55 (1 − 0 ) = 0,0866 ft.lbf/lbm
2(1)(32,174 )
v2 3,3884 2
2 elbow 90° = hf = n.Kf. = 2(0,75) = 0,2598 ft.lbf/lbm
2.g c 2(1)(32,174 )
v2 3,3884 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,3464 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,0075)
(40 )(
. 3,3884 )
2
= 0,4130 ft.lbf/lbm
(0,3355).2.(32,174)
2
A v2
1 Sharp edge exit = hex = 1 − 1
A2 2.α .g c
3,3884 2
= (1 − 0 ) = 0,1732 ft.lbf/lbm
2(1)(32,174 )
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
Maka :
32,174 ft / s 2
0+ (12 ft ) + 0 + 1,2790 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 13,2790 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
- 13,2790 = -0,75 x Wp
Wp = 17,7053 ft.lbf/lbm
Daya pompa : P = m x Wp
1 hp
= 18,4193 lbm/s × 16,617 ft.lbf/lbm x
550 ft.lbf / s
= 0,5929 Hp
Maka dipilih pompa dengan daya motor = 1 Hp
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 55 oC
Laju alir massa (F) = 9.600,0095 kg/jam = 5,8789 lbm/s
F 5,8789 lb m /sec
Laju alir volumetrik, Q = = = 0,1161 ft3/s
ρ 50,64 lb m / ft 3
4,6 x10 −5
ε/D = = 0,0006 (Geankoplis, 1993)
0,0779
Pada NRe = 50.117,0080 dan ε/D = 0,0006
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,006
Friction loss :
2,2630 2
= 0,55 (1 − 0 ) = 0,0398 ft.lbf/lbm
2(1)(32,174 )
v2 2,2630 2
2 elbow 90° = hf = n.Kf. = 2(0,75) = 0,2388 ft.lbf/lbm
2.g c 2(1)(32,174 )
v2 2,2630 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,1592 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,006)
(40)(. 2,2630)2 = 0,2988 ft.lbf/lbm
(0,2557 ).2.(32,174)
2
A v2
1 Sharp edge exit = hex = 1 − 1
A2 2.α .g c
2,2630 2
= (1 − 0 ) = 0,6898 ft.lbf/lbm
2(1)(32,174 )
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
32,174 ft / s 2
Maka : 0 + (12 ft ) + 0 + 0,8161 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 12,8161 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
Daya pompa :
P = m x Wp
1 hp
= 5,8789 lbm / s x 16,0202 ft.lbf/lbm x
550 ft.lbf / s
= 0,1712 Hp
Maka dipilih pompa dengan daya motor = ½ Hp
π DT2 H S (H S : DT = 3 : 2 )
1
Volume silinder =
4
Dimana:
t = tebal shell (in)
P = tekanan desain (Psia)
R = jari-jari dalam tangki (in)
S = allowable stress (Psia)
E = joint efficiency
n = umur alat (tahun)
C = corrosion allowance (m/tahun)
Volum larutan = 751,85 m3
Volum tangki = 902,22 m3
751,85
Tinggi larutan dalam tangki = x15,68 = 13,07 m
902,22
Tekanan hidrostatik
P=ρxgxl
= 952,945 kg/m3 x 9,8 m/det2 x 13,07 m
= 122.027,78 Pa = 17,7108 psia
Faktor kelonggaran = 20 %
Maka, Pdesain = (1,2) (P operasi)
= 1,2 ( 14,696 + 17,7108) = 38,888 psia
t = 1,876 in
tebal shell standar yang digunakan adalah 2 in (Brownell, 1959)
menghitung tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell
Tebal tutup atas = 2 in (Brownell, 1959)
Perancangan Sistem pengaduk
Jenis : flat 6 blade turbin impeller
Baffle : 4 buah
Kecepatan putaran (N) : 0,5 rps (Geankoplis, 1993)
Efisiensi motor : 80 %
Pengaduk didesain dengan standar berikut :
Da : Dt = 0,3 J : Dt = 1 : 12 W : Da = 1 : 5
L : Da = 1 : 4 E : Da = 1:1 (Geankoplis, 1993)
Jadi :
6. Diameter impeller (Da) = 0,3 x Dt = 0,3 x 8,95 = 2,685 m
7. Tinggi pengaduk dari dasar (E) = Da = 2,685 m
8. Lebar baffle ( J) = 0,746 m
9. Lebar daun baffle (W) = 0,537 m
10.Panjang daun impeller (L) = 0,671 m
Daya untuk pengaduk :
N × Da2 × ρ 0,8 × 2,685 2 × 952,945
Bilangan Reynold (NRe) = =
µ 0,0008
= 68.747.611,25
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 55 oC
Laju alir massa (F) = 19.838,919 kg/jam = 12,1491 lbm/s
Densitas (ρ) = 952,945 kg/m3 = 59,492 lbm/ft3
Viskositas (µ) = 0,8 cP = 0,000538 lbm/ft.s
F 12,1491 lb m /sec
Laju alir volumetrik, Q = = = 0,2042 ft3/s
ρ 59,49 lb m / ft 3
Ukuran nominal : 31 in
2
ρ ×v× D
Bilangan Reynold : NRe=
µ
(59,492 lbm / ft 3 )(1,4692 ft / s )(0,2957 ft )
=
0,000538 lbm/ft.s
= 97.263,4403 (Turbulen)
4,6 x10 −5
ε/D = = 0,0005 (Geankoplis, 1993)
D
Pada NRe = 97.263,4403 dan ε/D = 0,0005
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,005
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2
A1 2α
1,4692 2
= 0,55 (1 − 0 ) = 0,0687 ft.lbf/lbm
2(1)(32,174 )
v2 1,4692 2
2 elbow 90° = hf = n.Kf. = 2(0,75) = 0,2060 ft.lbf/lbm
2.g c 2(1)(32,174 )
v2 1,4692 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,2746 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,005)
(40)(. 1,4692)2 = 0,3715 ft.lbf/lbm
(0,2957 ).2.(32,174)
1,4692 2
= (1 − 0 ) = 0,1373 ft.lbf/lbm
2(1)(32,174 )
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
Maka :
32,174 ft / s 2
0+ (12 ft ) + 0 + 1,0581 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 13,0581 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
- 13,0581 = -0,75 x Wp
Wp = 16,3227 ft.lbf/lbm
Daya pompa :
P = m x Wp
1 hp
= 16,3227 lbm/s × 12,1491 ft.lbf/lbm x
550 ft.lbf / s
= 0,3606 Hp
π DT2 H S (H S : DT = 3 : 2 )
1
Volume silinder =
4
3
= π DT3
8
DT ( diameter tangki ) = 14,5103 m
HS ( tinggi silinder ) = 3/2DT = 3/2 x 14,5103 = 21,7655 m
Menghitung diameter dan tinggi tutup
Diameter tutup = diameter tangki = 14,5103 m
Hh : Dt = 1 : 6 (Brownell, 1959)
1
Tinggi tutup = x14,5103 = 2,4184 m
6
Tinggi total = 21,7655 + 2,4184 = 24,1839 m
volume bahan dalam tangki x tinggi tangki
Tinggi bahan dalam tangki =
volume tangki
Faktor kelonggaran = 20 %
Maka, Pdesain = (1,2) (P operasi)
= 1,2 (14,696 + 27,2974) = 50,3921 psia
50,3921x 571,2722
t= 2
+ (10 x0,125)
(13700 x0,8) − 0,6 x(50,3921)
t = 2,5669 in
tebal shell standar yang digunakan adalah 3 in (Brownell, 1959)
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 55 oC
Laju alir massa (F) = 19.838,919 kg/jam = 12,1491 lbm/s
Densitas (ρ) = 952,945 kg/m3 = 59,492 lbm/ft3
Viskositas (µ) = 0,8 cP = 0,000538 lbm/ft.s
F 12,1491 lb m /sec
Laju alir volumetrik, Q = = = 0,2042 ft3/s
ρ 59,49 lb m / ft 3
Ukuran nominal : 31 in
2
Schedule number : 40
Diameter Dalam (ID) : 3,548 in = 0,2956 ft
Diameter Luar (OD) : 4,00 in = 0,3333 ft
Inside sectional area : 0,0687 ft2
0,2042 ft 3 / s
Kecepatan linear, v = Q/A = = 1,4692 ft/s
0,0687 ft 2
ρ ×v× D
Bilangan Reynold : NRe=
µ
(59,492 lbm / ft 3 )(1,4692 ft / s )(0,2957 ft )
=
0,000538 lbm/ft.s
= 97.263,4403 (Turbulen)
4,6 x10 −5
ε/D = = 0,0005 (Geankoplis, 1993)
D
Pada NRe = 97.263,4403 dan ε/D = 0,0005
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,005
Friction loss :
A2 v 2
1 Sharp edge entrance= hc = 0,55 1 −
A1 2α
1,4692 2
= 0,55 (1 − 0 ) = 0,0687 ft.lbf/lbm
2(1)(32,174 )
v2 1,4692 2
2 elbow 90° = hf = n.Kf. = 2(0,75) = 0,2060 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,005)
(40 )(
. 1,4692)
2
= 0,3715 ft.lbf/lbm
(0,2957 ).2.(32,174)
2
A v2
1 Sharp edge exit = hex = 1 − 1
A2 2.α .g c
1,4692 2
= (1 − 0 ) = 0,1373 ft.lbf/lbm
2(1)(32,174 )
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
Maka :
32,174 ft / s 2
0+ (12 ft ) + 0 + 1,0581 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 13,0581 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
- 13,0581 = -0,75 x Wp
Wp = 16,3227 ft.lbf/lbm
Daya pompa :
P = m x Wp
Desain Tangki 1.
Menghitung volume tangki :
476.132,0586 kg / hari
Laju alir volumetrik (Q) = = 499,6427 m3/hari
952,945 kg/m 3
Volume Bahan = 2.997,8565 m3
Volume tangki, VT = ( 1+ 0,2 ) x 2.997,8565 m3
= 3.597,4278 m3
Perbandingan tinggi tangki dengan diameter tangki (HS : DT ) = 3 : 2
π DT2 H S (H S : DT = 3 : 2 )
1
Volume silinder =
4
3
= π DT3
8
DT ( diameter tangki ) = 14,5103 m = 571,2714 in
Tekanan hidrostatik
P=ρxgxl
= 952,945 kg/m3 x 9,8 m/det2 x 18,1379 m
= 169.387,3527 Pa
= 24,5845 Psia
Faktor kelonggaran = 20 %
Maka, Pdesain = (1,2) (P operasi)
= 1,2 (14,696 + 24,5845) = 47,1366 psia
- Direncanakan bahan konstruksi Carbon Steel SA-285 grade C
- Allowable working stress (S) : 13.700 psia (Peters et.al., 2004)
- Joint efficiency (E) : 0,8 (Peters et.al., 2004)
- Corossion allowance (C) : 0,125 in/tahun (Perry, 1999)
- Umur alat : 10 tahun
PR
t= + n.C (Perry, 1999)
SE − 0,6 P
t=
(
47,1366 x 1 571,2714
2
) + (10 x0,125)
(13700 x0,8) − 0,6 x(47,1366)
t = 2,486 in = 0,6303 m
tebal shell standar yang digunakan adalah 2 ½ in
2. Desain Tangki Atas
Diameter2 = D1- 2xTebal shell1
= 14,5103 m – 2 x (0,6303)
= 13,2497 m
P1V1 = P2V2
1. 3.597,4278 = 1,256 x V2
V2 = 2.864,1941 m3
V2 =Ax h
2.864,1941
h =
1
πD2 2
4
= 17,6414 m
Jaket Pendingin
Jumlah air = 693.539,279 kg/hari
IDJaket = OD shell = 571,2714 inch
TinggiJaket = TinggiReaktor = 856,9095 inch
Jarak Jaket = 12 inchi
ODJaket = 571,2714 in +2 x 12in
= 595,2714 in
π
× D2 − D1
2 2
Luas laluan air =
4
= 21,977,6664 in2
Data :
Laju massa = 57.600,0571 kg/2jam
Densitas = 985,66 kg/m3
Hs
½D
Hc
πD 2 H c
Vs = ........................................................................ (Perry, 1999)
12
Perbandingan tinggi kerucut dengan diameter kerucut (Hc : D) = 1:2
πD 3
Vc = ........................................................................ (Perry, 1999)
24
∼ Volume (V)
3πD 3
V = Vs + Vc =
8
70,128 m3 = 1,178097 D3
D = 3,9052 m
Hs = (4/3) × D = 5,2069 m
Kondisi operasi :
Tekanan = 1 atm
Turbin
Fungsi : Menurunkan tekanan gas dari ruang pembakaran
Jenis : Centrifugal expander
Jumlah : 1 unit
Data:
Laju alir massa = 192.553,26 kg/hari = 8.023,053 kg/jam
Densitas udara = 1,126 kg/m3
Laju alir biogas = 31.943,0456 kg/hari
Densitas Biogas = 1,274 kg/m3
192.553,26 31.943,0456
Laju alir volumetrik (Q) = + = 8.169,978 m 3 / jam
1,126 1,274
Diameter pipa ekonomis (De) dihitung dengan persamaan :
De = 3,9 (Q)0,45( ρ )0,13 (Timmerhaus,1991)
= 3,9 (0,0643 ft3/detik)0,45(0,0702 lbm/ft3)0,13
= 0,8036 in
Dipilih material pipa commercial steel 1 inchi Sch 40 :
Diameter dalam (ID) = 1,049 in
Diameter luar (OD) = 1,315 in
Luas penampang (A) = 0,006 ft2
Tekanan masuk (P1) = 6 atm = 12.679,344 lb/ft2 = 88,716 psia
Tekanan keluar (P2) = 1 atm = 2116,224 lb/ft2 = 14,696 psia
Temperatur keluar = 55 0C
Rasio spesifik (k) = 1,4
Kondisi operasi :
P = 1 atm
T = 30 0C
Waktu tinggal ( τ ) : 7 hari
Laju alir massa (F) = 691.200,6852 kg/hari
Densitas (ρ) = 811,1699 kg/m3
Viskositas (µ) = 0,8 cP
Faktor kelonggaran = 20 % (Perry, 1999)
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 55 oC
Laju alir massa (F) = 691.200,6852 kg/jam = 17,6368 lbm/s
Densitas (ρ) = 811,1699 kg/m3 = 50,6410 lbm/ft3
Viskositas (µ) = 0,8 cP = 0,000538 lbm/ft.s
ρ ×v× D
Bilangan Reynold : NRe =
µ
(50,6410 lbm / ft 3 )(2,5055 ft / s )(0,42058 ft )
=
0,000538 lbm/ft.s
= 99.269,5572 (Turbulen)
4,6 x10 −5
ε/D = = 0,000359 (Geankoplis, 1993)
D
Pada NRe = 99.269,5572 dan ε/D = 0,000359
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,005
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2
A1 2α
2,5055 2
= 0,55 (1 − 0 ) = 0,0488 ft.lbf/lbm
2(1)(32,174 )
v2 2,5055 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,1951 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,005)
(40 )(
. 2,5055)
2
= 0,1856 ft.lbf/lbm
(0,2956).2.(32,174)
2
A v2
1 Sharp edge exit = hex = 1 − 1
A2 2.α .g c
2,5055 2
= (1 − 0 ) = 0,0976 ft.lbf/lbm
2(1)(32,174 )
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
Maka :
32,174 ft / s 2
0+ (12 ft ) + 0 + 0,7465 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 12,7465 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
- 12,7465 = -0,75 x Wp
Wp = 15,9332 ft.lbf/lbm
Daya pompa :
π DT2 H S (H S : DT = 3 : 2 )
1
Volume silinder =
4
3
= π DT3
8
DT ( diameter tangki ) = 18,0807 m
Dimana:
t = tebal shell (in)
P = tekanan desain (Psia)
R = jari-jari dalam tangki (in)
S = allowable stress (Psia)
E = joint efficiency
n = umur alat (tahun)
C = corrosion allowance (m/tahun)
Volum larutan = 5.799,9714 m3
Volum tangki = 6.959,9657 m3
Tinggi larutan dalam tangki = 25,1121 m
Tekanan hidrostatik
P=ρxgxl
= 952,945 kg/m3 x 9,8 m/det2 x 25,1121 m
= 243.518,3394 Pa = 34,0141 psia
Faktor kelonggaran = 20 %
Maka, Pdesain = (1,2) (P operasi)
= 1,2 (14,696 + 34,0141) = 58,4522 psia
t = 3,1543 in
tebal shell standar yang digunakan adalah 4 in (Brownell, 1959)
menghitung tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell
Tebal tutup atas = 4 in (Brownell, 1959)
Jaket Pendingin
Jumlah air = 293.378,8635 kg/hari
IDJaket = OD shell = 711,8374 in
TinggiJaket = TinggiReaktor = 1186,3976 in
Jarak Jaket = 12 in
ODJaket = 711,8374 in + 2 x 12in
= 735,8374 in
π
× D2 − D1
2 2
Luas laluan air =
4
= 27.274,1932 in2
Data :
Laju massa (F1) = 57.493,7367 kg/2jam
Hs
½D
Hc
πD 2 H c
Vs = ........................................................................ (Perry, 1999)
12
Perbandingan tinggi kerucut dengan diameter kerucut (Hc : D) = 1:2
πD 3
Vc = ........................................................................ (Perry, 1999)
24
∼ Volume (V)
3πD 3
V = Vs + Vc =
8
69,996 m3 = 1,178097 D3
D = 3,9027 m
Hs = (4/3) × D = 5,2037 m
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 55 oC
F 5,8681 lb m /sec
Laju alir volumetrik, Q = = = 0,1159 ft3/s
ρ 50,64 lb m / ft 3
4,6 x10 −5
ε/D = = 0,0006 (Geankoplis, 1993)
0,0779
Pada NRe = 50.024,5005 dan ε/D = 0,0006
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,006
Friction loss :
2,2588 2
= 0,55 (1 − 0 ) = 0,0396 ft.lbf/lbm
2(1)(32,174 )
v2 2,2588 2
2 elbow 90° = hf = n.Kf. = 2(0,75) = 0,2379 ft.lbf/lbm
2.g c 2(1)(32,174 )
v2 2,2588 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,1586 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,006)
(40)(. 2,2588)2 = 0,2977 ft.lbf/lbm
(0,2557 ).2.(32,174)
2
A v2
1 Sharp edge exit = hex = 1 − 1
A2 2.α .g c
2,2588 2
= (1 − 0 ) = 0,0793 ft.lbf/lbm
2(1)(32,174 )
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
32,174 ft / s 2
Maka : 0 + (12 ft ) + 0 + 0,8131 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 12,8131 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
Daya pompa :
P = m x Wp
1 hp
= 5,8681 lbm / s x 16,0164 ft.lbf/lbm x
550 ft.lbf / s
= 0,1709 Hp
Maka dipilih pompa dengan daya motor = ½ Hp
π DT2 H S (H S : DT = 3 : 2 )
1
Volume silinder =
4
Dimana:
t = tebal shell (in)
P = tekanan desain (Psia)
R = jari-jari dalam tangki (in)
S = allowable stress (Psia)
E = joint efficiency
n = umur alat (tahun)
C = corrosion allowance (m/tahun)
Volum larutan = 544,3065 m3
Volum tangki = 653,17 m3
716,3414
Tinggi larutan dalam tangki = x15,4149 = 12,8458m
859,6097
Tekanan hidrostatik
P=ρxgxl
= 985,66 kg/m3 x 9,8 m/det2 x 12,8458 m
= 124.083,1111 Pa = 18,0092 psia
Faktor kelonggaran = 20 %
Maka, Pdesain = (1,2) (P operasi)
= 1,2 ( 14,696 + 18,0092) = 39,2462 psia
- Direncanakan bahan konstruksi Carbon Steel SA-285 grade C
- Allowable working stress (S) : 13.700 psia (Peters et.al., 2004)
t=
(
39,2462 x 1 346,7909
2
) + (10 x0,125)
(13700 x0,8) − 0,6 x(39,2462 )
t = 1,8722 in
tebal shell standar yang digunakan adalah 2 in (Brownell, 1959)
menghitung tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell
Tebal tutup atas = 2 in (Brownell, 1959)
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 55 oC
Laju alir massa (F) = 706.069,08 kg/jam = 18,0162 lbm/s
Densitas (ρ) = 811,1699 kg/m3 = 50,6410 lbm/ft3
Viskositas (µ) = 0,8 cP = 0,000538 lbm/ft.s
F 18,0162 lb m /sec
Laju alir volumetrik, Q = = = 0,3558 ft3/s
ρ 50,6410 lb m / ft 3
ρ ×v× D
Bilangan Reynold : NRe =
µ
(50,6410 lbm / ft 3 )(2,5594 ft / s )(0,42058 ft )
=
0,000538 lbm/ft.s
= 101.404,9616 (Turbulen)
4,6 x10 −5
ε/D = = 0,000359 (Geankoplis, 1993)
D
Pada NRe = 101.404,9616 dan ε/D = 0,000359
Dari Fig.2.10-3 Geankoplis (1993), diperoleh harga f = 0,005
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2
A1 2α
2,5594 2
= 0,55 (1 − 0 ) = 0,0509 ft.lbf/lbm
2(1)(32,174 )
v2 2,5594 2
2 elbow 90° = hf = n.Kf. = 2(0,75) = 0,2291 ft.lbf/lbm
2.g c 2(1)(32,174 )
v2 2,5594 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,2036 ft.lbf/lbm
2.g c 2(1)(32,174 )
∆L.v 2
Pipa lurus 40 ft = Ff = 4f
D.2.g c
= 4(0,005)
(40 )(
. 2,5594 )
2
= 0,1936 ft.lbf/lbm
(0,2956).2.(32,174)
2
A v2
1 Sharp edge exit = hex = 1 − 1
A2 2.α .g c
2,5594 2
= (1 − 0 ) = 0,1018 ft.lbf/lbm
2(1)(32,174 )
dimana : v1 = v2
P1 = P2
∆Z = 12 ft
Maka :
32,174 ft / s 2
0+ (12 ft ) + 0 + 0,7790 ft.lbf / lbm + Ws = 0
32,174 ft.lbm / lbf .s 2
Ws = - 12,7790 ft.lbf/lbm
P Effisiensi pompa , η= 75 %
Ws = - η x Wp
- 12,7790 = -0,75 x Wp
Wp = 15,9738 ft.lbf/lbm
Daya pompa :
P = m x Wp
1 hp
= 18,0162 lbm/s × 15,9738 ft.lbf/lbm x
550 ft.lbf / s
= 0,5232 Hp
Maka dipilih pompa dengan daya motor = 1 Hp
Kondisi operasi :
P = 1 atm
π DT2 H S (H S : DT = 3 : 2 )
1
Volume silinder =
4
3
= π DT3
8
DT ( diameter tangki ) = 8,8085 m = 346,7909 in
HS ( tinggi silinder ) = 3/2DT = 3/2 x 8,8085 = 13,2128 m
Menghitung diameter dan tinggi tutup
Diameter tutup = diameter tangki = 8,8085 m
Asumsi Hh : Di = 1 : 4
1
Tinggi tutup = x8,8085 = 2,2021 m
4
Tinggi total = 13,2128 + 2,2021 = 15,4149 m
Menghitung tebal shell tangki
PR (Perry, 1999)
t= + n.C
SE − 0,6 P
Dimana:
t = tebal shell (in)
P = tekanan desain (Psia)
R = jari-jari dalam tangki (in)
S = allowable stress (Psia)
E = joint efficiency
t=
(
39,2462 x 1 346,7909
2
) + (10 x0,125)
(13700 x0,8) − 0,6 x(39,2462 )
t = 1,8722 in
tebal shell standar yang digunakan adalah 2 in (Brownell, 1959)
menghitung tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell
Tebal tutup atas = 2 in (Brownell, 1959)
Dalam rencana pra rancangan pabrik pembuatan Pupuk Cair menjadi Energi
listrik digunakan asumsi sebagai berikut:
Pabrik beroperasi selama 365 hari dalam setahun.
Perhitungan didasarkan pada harga peralatan tiba di pabrik atau purchased-
equipment delivered (Timmerhaus et al, 2004).
Harga alat disesuaikan dengan nilai tukar dollar terhadap rupiah adalah :
US$ 1 = Rp 9.475,- (Bank Mandiri, 22 Juni 2012).
X I
m
Cx = Cy 2 x
X 1 I y
dimana: Cx = harga alat pada tahun 2012
Cy = harga alat pada tahun dan kapasitas yang tersedia
X1 = kapasitas alat yang tersedia
X2 = kapasitas alat yang diinginkan
Ix = indeks harga pada tahun 2012
Iy = indeks harga pada tahun yang tersedia
m = faktor eksponensial untuk kapasitas (tergantung jenis alat)
Untuk menentukan indeks harga pada tahun 2012 digunakan metode regresi
koefisien korelasi:
r=
[n ⋅ ΣX i ⋅ Yi − ΣX i ⋅ ΣYi ] (Montgomery, 1992)
(n ⋅ ΣX i 2 − (ΣX i )2 )× (n ⋅ ΣYi 2 − (ΣYi )2 )
Jan,2002
P-82
103 2
10-1 1 10 10 103
Capacity, m3
Gambar LD.1 Harga Peralatan untuk Tangki Tangki Pelarutan.(Peters et.al., 2004)
Indeks harga tahun 2012 (Ix) adalah 1.318,0463. Maka estimasi harga tangki untuk
(X2) 721.867,89 m3 adalah :
0 , 49
721.867,89 1.318,0463
Cx = US$ 6.700 × x
1 1.102,5
Cx = US$ 5.943.938,-
maka :
Cx = Rp 56.318.809.744,-
Dengan cara yang sama diperoleh perkiraan harga alat lainnya yang dapat dilihat
pada Tabel LD.3 untuk perkiraan peralatan proses.
Untuk harga alat impor sampai di lokasi pabrik ditambahkan biaya sebagai berikut:
- Biaya transportasi = 5%
- Biaya asuransi = 1%
- Bea masuk = 15 % (Rusjdi, 2004)
- PPn = 10 % (Rusjdi, 2004)
- PPh = 10 % (Rusjdi, 2004)
- Biaya gudang di pelabuhan = 0,5 %
- Biaya administrasi pelabuhan = 0,5 %
Total MITTL = L + M + N + O + P
= Rp 2.514.844.793.026,-
Total MIT = MITL + MITTL
= Rp 5.582.010.070.625,- + Rp 2.514.844.793.026,-
= Rp 8.096.854.863.651,-
2. FeCl2
Kebutuhan = 64,584 kg/hari
Harga = Rp 2.000,- (PT. Bratachem, 2009)
Harga total = 365 hari × 64,584 kg/hari x Rp 2.000,-/kg
= Rp 47.146.320,-
3. NiCl2
Kebutuhan = 0,864 kg/hari
Harga = US $5.500,- /Ton (Alibaba.com,2012)
Harga total = 365 hari × 0,864 kg/hari x $5,5/kg x Rp 9.475/ $
= Rp 16.434.198,-
4. CoCl2
Kebutuhan = 1,5046 kg/hari
Harga = US $9,5,- /kg (Alibaba.com,2012)
Harga total = 365 hari × 2,4408 kg/hari x $9,5/kg x Rp 9.475/ $
= Rp 49.432.975,-
2.2 Kas
2.2.1 Gaji Pegawai
Tabel LD.5 Perincian Gaji Pegawai
Gaji/orang Total Gaji
Jabatan Jumlah
(Rp) (Rp)
General Manager 1 12.000.000 12.000.000
Karyawan Proses 34 2.500.000 6.750.0000
Karyawan Laboratorium,
3 2.500.000 7.500.000
R&D
Karyawan Gudang / Logistik 3 2.000.000 6.000.000
Petugas Kebersihan 2 1.000.000 2.000.000
Supir 1 1.250.000 1.250.000
Jumlah 44 113.750.000
1
Piutang Dagang = × Rp 6.470.010.554.063,-
12
= Rp 539.167.546.172,-
Tabel LD.8 Aturan depresiasi sesuai UU Republik Indonesia No. 17 Tahun 2000
Kelompok Harta Masa Tarif
Beberapa Jenis Harta
Berwujud (tahun) (%)
I. Bukan Bangunan
1.Kelompok 1 4 25 Mesin kantor, perlengkapan, alat perangkat/
tools industri.
2. Kelompok 2 8 12,5 Mobil, truk kerja
3. Kelompok 3 16 6,25 Mesin industri kimia, mesin industri mesin
II. Bangunan
Permanen 20 5 Bangunan sarana dan penunjang
Tabel LD.9 Perhitungan Biaya Depresiasi sesuai UURI No. 17 Tahun 2000
Umur %
Komponen Biaya (Rp) (tahun) depresiasi Depresiasi (Rp)
Bangunan 4.835.000.000 20 5,00% 241.750.000
Peralatan proses 3.240.779.372.456 17 6,25% 202.548.710.779
Instrumentrasi dan
pengendalian proses 181.483.644.858 5 12,50% 22.685.455.607
Perpipaan 1.555.574.098.779 5 12,50% 194.446.762.347
Instalasi listrik 259.262.349.796 5 12,50% 32.407.793.725
Insulasi 207.409.879.837 5 12,50% 25.926.234.980
Inventaris kantor 77.778.704.939 4 25,00% 19.444.676.235
Perlengkapan keamanan
dan kebakaran 51.852.469.959 5 12,50% 6.481.558.745
Sarana transportasi 1.900.000.000 10 12,50% 237.500.000
Alat Perlengkapan
Keamanan Karyawan 369.550.000 5 12,50% 46.193.750
Total 504.466.636.167
Rp 3.975.507.802.620,-
BEP = x 100%
Rp 6.470.010.554.063,- - Rp 402.475.119,-
= 61,45%
Rp 1.658.594.183.755, ,-
RON = x 100%
Rp 5.570.540.518.372,-
RON = 29,77 %